Construction checklist templates and forms

Free PDF-ready construction checklist templates and forms for site supervisors, plant operators and safety teams. The collection covers pre-start checklists for excavators, loaders, forklifts, telehandlers, rollers, graders and elevating work platforms; scaffold, crane, hoist and lifting equipment inspections; permits for hot work, confined spaces, excavation and working at heights; and SWMS, JSA and risk assessment templates. It also includes lift plans, service procedures for construction plant, inspection and test plans, snag lists, site diaries and dilapidation reports. Most forms are written for Australian sites, with OSHA checklists for US sites and CDM 2015 templates for Great Britain. Download and use straight away, or digitise in MapTrack.

159 templates

Frequently asked questions

Are these construction templates free?
Yes. Every template is free to download. Enter your email on the template page to download it as a free PDF. No MapTrack account is required.
Can I use these checklists on a construction site without software?
Absolutely. Each template is designed as a standalone PDF form. Print copies for each operator or supervisor and fill them out by hand on site.
How do I digitise a paper checklist in MapTrack?
Create a custom form in MapTrack using the drag-and-drop form builder. Recreate the checklist sections, add photo fields if needed, and assign it to the relevant assets. Your team completes forms on their phone, and every submission is linked to the asset record automatically.
Do Australian WHS laws require a daily pre-start for construction plant?
Not as a general rule. The model WHS Regulations, which Safe Work Australia says every jurisdiction except Victoria has implemented (some with variations), contain no daily pre-start requirement. Regulation 213 requires plant to be maintained, inspected and, if necessary, tested by a competent person, following the manufacturer's recommendations, or a competent person's where there are none, and inspected annually if neither is reasonably practicable. Regulation 225 is stricter for scaffolds, including any from which a person or thing could fall more than 4 metres: written confirmation from a competent person before first use, then an inspection at least every 30 days. Your principal contractor may still require daily pre-starts.
How do I make a construction checklist?
Start from the machine or the task, not a blank page. List the items in the order someone walks through them, give each a pass, fail or not applicable result, and add the site, date, the person checking and a sign-off. Leave room for defects and the action taken, and make it clear the plant or area is not used until a failed item is fixed. The equipment pre-start checklist here follows that layout, so pick the closest checklist for your plant or task and add your site's own items.