Skip to main content

MapTrack Capability Pack

Everything you need to know about our asset tracking platform, features, integrations and pricing.

See the workflow in MapTrack

These screenshots come from a MapTrack demonstration account. Read the saved state and setup beneath each image, then open the feature guide for the full workflow.

MapTrack Service Board sorted by next service, showing 3 overdue, 17 due soon, 6 open work orders and 20 on track: a Mitsubishi Triton 300 km overdue, a lighting tower 10 hours overdue and a CAT 140 grader 30 hours overdue, each with open work orders, then three fire extinguishers due in 5 days.

See the next service beside the current reading

Sorted by next service, the three overdue schedules come first: a ute 300 km past its service, then a lighting tower and a grader past their hour services. Each shows its open work orders. Extinguisher checks due in five days follow. Hours, kilometres and calendar checks share one board.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration workspace with 40 schedule enrolments. Columns were chosen and resized in the board’s own display settings. Requires enrolled assets, configured schedules and an internet connection.

Read the workflow: See the next service beside the current reading
MapTrack Request #255D in Fulfilling: an angle grinder fulfilled, drill DR-02 fulfilled as a substitute for DR-01 with the reason and note recorded, and one survey instrument still outstanding.

See what was picked and what is still outstanding

The request is for an angle grinder, drill DR-01 and one survey instrument, with Sarah Turner as recipient at Officer Road Widening and James Ward as approver. DR-01 was already out with another crew member, so stores sent DR-02 and recorded why. Two of three items are fulfilled and the survey instrument is still outstanding.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration workspace with request approval switched on. The request was created, approved and part-fulfilled; the assignment has not been completed yet.

Read the workflow: See what was picked and what is still outstanding