Skip to main content
Infrastructure

Infrastructure plant register & compliance software

Track tools, plant and equipment across major infrastructure projects, packages and sites. Pre-starts, compliance and maintenance in one platform, so you know who has what, what's due and what's project-ready.

From $1 a tool and $12 a machine a month, AUD ex GST. Unlimited users.

G2 rating 4.9 out of 5
Capterra rating 5.0 out of 5GetApp rating 5.0 out of 5Software Advice rating 5.0 out of 5
15 reviews on G2 · the same 17 reviews on Capterra, GetApp and Software AdviceAll MapTrack reviews
Unlimited usersper-asset pricing
Offline-readyworks in the field
Infrastructure project site with heavy plant and equipment. MapTrack tracks tools, plant and fleet across projects

Published customer results

Within hours

Asset transfers between project sites that previously took several days to coordinate and document are now completed and recorded within hours

Hacer Group, Construction
Read the Hacer Group story

Instantly

Safety audit documentation that previously took 2–3 days to compile can now be retrieved instantly from the platform on any device.

RIX Specialist Contracting, Construction
Read the RIX Specialist Contracting story

Estimated 25–35%

Better visibility of owned assets across all projects reduced unnecessary equipment hire by an estimated 25–35%

Hacer Group, Construction
Read the Hacer Group story

Asset tracking software for infrastructure helps major-programme teams track plant, registered equipment and packages across tier 2 and tier 3 contractors from one register. MapTrack combines QR scanning, GPS and OEM telematics with RBAC so each contractor sees only their assets, offline mobile pre-starts for tunnels and underground works, and condition data from telematics fault codes. Infrastructure teams use it to keep AS/NZS network and registered-plant evidence per asset for the principal contractor, prevent equipment failures mid-package, and share one plant register across packages.

Key takeaways

  • FMI and PlanGrid’s Construction Disconnected study found construction professionals lose more than 14 hours a week to non-productive work, 5.5 of them chasing project information.
  • Multi-package programmes need RBAC so each tier 2 or tier 3 contractor sees only their assets, with a clear chain of custody across transfers.
  • AS/NZS network standards (AS 4799 stormwater, AS 3500 plumbing) and registered plant inspection cycles must produce per-asset evidence for the principal contractor.
  • Tunnel and underground works fall outside cellular coverage; offline mobile capture for pre-starts and meter readings is non-negotiable.
  • Telemetry from telematics devices can detect deteriorating asset condition (engine fault codes, hour spikes) before scheduled service intervals miss the failure.
  • Plant is shared across packages; one register records what is allocated where, which supports redeployment decisions.

Pricing

One price per machine, with the hardware included: software and a QR tag from $12 a machine a month, GPS tracking from $27 and AI cameras from $72. Tools and equipment start at $1/asset/month. Every plan includes unlimited users. Prices are AUD ex GST, and machine prices are for annual billing.

View pricingGet a tailored quote

Jarrod Milford

Jarrod Milford

Co-Founder & Commercial Director

Published 15 February 2026Updated 26 October 2026

Asset tracking for infrastructure project contractors

On an infrastructure project, plant and equipment come from the principal contractor, subcontractors and hire companies, and the pre starts and inspection records need to sit with each machine. In MapTrack plant, vehicles and trailers sit on one register, each with its status, who or which project has it, and its QR label. Operators do the pre start on their phone, services fall due on the hours, and where there's a tracker the latest GPS position sits on the same record. Roles set who can view, edit and sign gear out.

Infrastructure

MapTrack at a glance

Built for
Infrastructure contractors running owned, subcontracted and hired plant on major projects.
Tracks
EWPs and crane trucks, HV tooling and testers, road plant and drill rigs, fixed plant, survey instruments and drones, rigging, unpowered trailers, site vehicles, on-hire plant from hire companies.
Tracked with
QR labels, Bluetooth tags, battery GPS trackers, hardwired GPS trackers or AI dashcams with built-in GPS.
Works offline
Pre starts, inspections and other forms save with no reception and sync when the phone is back in range. A work order already loaded on the phone can be worked through with no reception too.
Phones and computers
In the browser on a computer, and Android, iPhone and iPad access through the mobile browser or the installable web app.
Connects to
Telematics and accounting integrations, a public API, and an MCP server for AI tools such as Claude.
Sign-in
Sign in with Microsoft, or SAML 2.0 single sign-on set up by our team (Enterprise, or a Pro add-on).
Set-up and support
24/7 support. Our team sets up single sign-on and OEM telematics feeds, and helps connect trackers you already run.
Track record
600,000+ assets tracked since 2012.

How to choose asset tracking software for infrastructure projects

Look for:

  1. Owned and hired plant on one register, with who or which project has it
  2. Pre starts and inspection records kept with each machine
  3. Register, maintenance and tracking in one system
  4. Roles that set who can view, edit and sign gear out
  5. Form PDFs to hand the principal contractor

Where MapTrack fits

Next to an EAM or ERP

If fixed plant, work planning and finance sit in an EAM or ERP, MapTrack can run beside it for the tools, equipment and vehicles that move between sites and crews. Its public API passes records between the two.

Next to telematics

A telematics platform tracks where vehicles go. MapTrack puts each vehicle and machine on the same register as the tools, with its pre starts and services. A GPS tracker or AI dashcam puts its latest position on the record, with estimated km and hours feeding its services, and MapTrack Telematics adds GPS tracking with trips, history and geofences.

See what MapTrack costs for your infrastructure assets

Per-asset pricing tailored to your infrastructure asset mix and a rollout plan, within one business day.

Trusted by major project teams, including Genus, Metro Tunnel and Saunders International

GenusMetro TunnelSaunders InternationalMineral ResourcesSupagasHacer Group
G2 rating 4.9 out of 5
Capterra rating 5.0 out of 5GetApp rating 5.0 out of 5Software Advice rating 5.0 out of 5
15 reviews on G2 · the same 17 reviews on Capterra, GetApp and Software AdviceCapterra Best Value 2026 badgeCapterra Best Ease of Use 2026 badgeAll MapTrack reviews

What we track

Every asset type on your infrastructure project

MapTrack is built for the full mix of assets that move across your depots, project sites, laydown areas and packages - from hand tools to heavy earthmoving plant.

  • Plant & heavy equipment
  • Tools & small plant
  • Vehicles & fleet
  • Trailers & tow equipment
  • Generators & site power
  • Inspection & compliance gear
  • Safety & PPE equipment
  • Temporary works & formwork
  • Spare parts & consumables
  • Survey & positioning equipment
  • Communications & IT
  • Keys & access devices
  • On-hire plant from hire companies
  • Temporary works & formwork

What you run, and how MapTrack tracks it

EWPs and crane trucks
QR label and hardwired GPS tracker
HV tooling and testers
QR label and Bluetooth tag
Road plant and drill rigs
QR label and hardwired GPS tracker
Fixed plant
QR label
Survey instruments and drones
QR label and Bluetooth tag
Rigging
QR label
Unpowered trailers
Battery GPS tracker
Site vehicles
Hardwired GPS tracker or AI dashcam
On-hire plant from hire companies
QR label

Running a mix like this? See how MapTrack handles it in a demo built around infrastructure teams.

Book a demo

30 minutes on Microsoft Teams

The challenge

The costs of poorly managed infrastructure project assets

Infrastructure assets don't sit still. They move between project packages, depots and laydown areas, wear out based on hours not dates, require documented compliance for principal contractors, and their downtime can cascade across multi-year programme schedules.

Assets move between project packages with no single view

Plant, tooling and fleet shift between packages, stages and sites across a programme. Each package runs its own spreadsheet. Nobody has a single source of truth for where assets are or who's responsible.

Multi-contractor environments make accountability hard

When multiple tier 2 and tier 3 subcontractors share equipment on the same programme, assets get borrowed, transferred and misplaced. Without a clear chain of custody, losses get written off and blame is impossible to assign.

Compliance evidence needs to be attached per asset

Pre-starts, design registrations, lifting certifications and inspection records must be linked to specific assets and producible on demand for the principal contractor or client. Paper folders and shared drives don't cut it.

Plant servicing runs on hours. Not the calendar

Excavators, loaders and piling rigs need servicing based on engine hours and runtime. Not arbitrary monthly reminders. Missing service intervals leads to unplanned breakdowns that cascade across the project schedule.

Double-booking across concurrent projects

Critical plant and specialist equipment gets allocated to multiple packages at the same time. Without a reservation system tied to real availability, crews arrive on site to find the gear they need is on another project entirely.

From MapTrack's own data

What we see across MapTrack customer accounts

These figures come from MapTrack's own product data, de-identified and aggregated. Accounts aren't grouped by industry, so each figure covers every qualifying customer account, not one industry alone. Every figure counts at least 20 accounts, and each one says how it was measured.

15%

Scheduled services past their due date

Across 32 MapTrack customer accounts with service schedules, 15% of scheduled services were past their due date on 26 October 2026. More than three quarters of those (78%) were over 30 days past due.

Method: MapTrack's own product data: 32 customer accounts with service schedules, 5,855 scheduled services (884 past due), snapshot at 26 October 2026. Demo, test and trial-build accounts are left out. Includes schedules MapTrack set up during onboarding; the servicing itself is the customer's. One account holds 53% of the past-due services; without it the share is 16%. Some past-due items may be assets no longer in use that were never archived.

37%

Check-outs that come back late

Across 37 MapTrack customer accounts over the 12 months to October 2026, 37% of check-outs with a due-back date came back late or were still out past it. One in five (21%) was more than a day late.

Method: MapTrack's own product data: 37 customer accounts, 6,794 check-outs with a due-back date (2,507 late), 12 months to 26 October 2026. Demo, test and trial-build accounts and anything MapTrack staff created are left out. Late means back more than an hour after the due-back time, or still out past it. Return times for a straight return are approximate. One account holds 54% of these check-outs; without it the late share is higher (45%).

73%

Gear that has been out for months

Across 63 MapTrack customer accounts, 73% of the items checked out on 26 October 2026 had been out for more than 90 days, and 16% for more than a year.

Method: MapTrack's own product data: 63 customer accounts, 19,211 items checked out, snapshot at 26 October 2026. Demo, test and trial-build accounts and anything MapTrack staff created are left out. Includes deliberate long-term allocations, such as a van given to a driver or a laptop given to a staff member, so this is time out, not proof that items are lost.

More than 60%

Location saved at check-out

Across 62 MapTrack customer accounts over the 12 months to October 2026, more than 60% of check-outs saved the location where the item was handed over, taken from the person's device.

Method: MapTrack's own product data: 62 customer accounts, 24,544 check-outs, 12 months to 26 October 2026. Demo, test and trial-build accounts and anything MapTrack staff created are left out. About three quarters (76%) saved a location of any kind, from the device or picked by hand.

Want to know what these costs look like on your own sites? Talk it through with us.

Book a demo

30 minutes on Microsoft Teams

Use cases

How infrastructure contractors use MapTrack

Register, maintenance and tracking in one system

Plant, vehicles and trailers sit on one register, each with its status, who or which project has it, and its QR tag. Services, pre-starts and, where there's a tracker, the latest GPS position sit on the same record.

Asset register
MapTrack Assets table filtered to heavy plant and vehicles, showing 17 assets. Each row has a photo, the category path, a status of Available, Repair or Deployed, the person or location the asset is with, its QR tag ID and its make.

See every asset, its status and who or where it is with

The register filtered to heavy plant and vehicles. Each row shows the photo and category, whether the asset is available, deployed or in for repair, the person or site it is with, and its QR tag ID. Two utes are with named crew members; the rest are at the yard, the workshop or a project site.

MapTrack app · Demonstration data · Captured

About this screenshot

Captured in a demonstration workspace. The All assets view is filtered to the Heavy Plant and Vehicles categories and shows the Status, Person, Location, Tag and Make columns.

Satellite map of a civil site in Clyde North, Victoria, in MapTrack: a boundary named Site boundary, a custom area drawn as an orange dashed outline around a cleared lot, with a marker for the 17 assets assigned to the site at its centre, zoom controls, map layer buttons and an Add button for another boundary.

A site’s boundary on its map

A site’s boundary in Clyde North, drawn on its map in MapTrack, with a marker for the 17 assets assigned to the site. None of them has a tracker, so they show at the site rather than at a live position.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration workspace at a 1440 px desktop viewport on the location’s Overview tab. The map was dragged to centre the site and zoomed in one step; the map card is cropped from the page.

Audit the tooling on every truck and EWP

Scan the tooling on each truck or EWP against what should be there, instead of a manual vehicle audit. You see what's there and what turned up extra, then choose whether anything left is marked missing.

Audits
MapTrack audit Workshop tool stocktake - September, assigned to Mike Chen and marked Complete. Tabs show 1 unscanned, 10 scanned, 1 discovered, 0 missing and 0 skipped; the scanned list starts with an extension reel, a fire extinguisher, a hydraulic road breaker and a cordless drill; the progress bar reads 11 of 12 assets.

See what a stocktake scanned, discovered and missed

A completed workshop stocktake. Ten listed assets were scanned and one asset that was not on the list was discovered, so progress reads 11 of 12. One asset is still unscanned and none are marked missing.

MapTrack app · Demonstration data · Captured

About this screenshot

Captured in a demonstration workspace on the audit’s Overview tab with the Scanned tab open; its activity log continues below the crop.

The Assets tab of the Service Ute (mobile storage) location listing Pressure Test Pump TP-01 and Press Tool Kit PK-01, both Available, with their tags and makes.

The tools that live on the ute

The tools that live on the ute are listed against it, so you can see what is on board.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration location for a service ute holding two tools.

Maintenance cost across fixed and mobile plant

Each service closes out on the plant's own record with the hours, the cost and the job it came from, whether it's fixed or mobile plant. Break the cost into labour, parts and external costs if you need to.

Cost tracking
MapTrack work order costs assigned, $479: Engine Oil Filter - CAT 320 $68, Fuel Filter - CAT 320 $74, Engine Oil 15W-40 20L $112, Grease Cartridge 450g $18, Oil sample analysis (lab) $42 and Labour (1h 30m) $165.

Parts, outside work and labour on the job

Part costs, an outside lab fee and logged labour add up on the work order: $479 for this 250 hour service at the time of capture. The part lines were entered as costs; this capture doesn’t show stock being drawn from the parts store.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration workspace at a 1024 px desktop viewport, cropped to the work order’s cost summary. Costs were added with Add Cost, and labour with Log Time at $110 an hour.

Reading in, next service out

A runtime-hours reading typed into Record service on a CAT roller, and the next 250 hour service MapTrack calculates from it.

MapTrack app · Demonstration data · Recorded

Book the gear each project needs

Request the gear a project needs for the dates it needs it. Stores fulfil each item by scan, or swap in another with a reason, and the sign-out starts from the request.

Scheduling
MapTrack Request #E5BB, Scheduled, Medium, for Alex Morgan at North Site: fulfilment 0 of 2 items, needed from 20 Sep 2026 until 26 Sep 2026, and two unfulfilled items, Cordless Drill 02 in Small Plant & Tools and a Topcon Laser Level in Survey & Testing, each with Substitute and Fulfil.

Book named items for set dates

A scheduled request books a drill and a laser level for one person at one site over set dates, and each item can be fulfilled or substituted.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration workspace at a desktop viewport, on the request, cropped to its summary and items.

Not sure which of these to start with? We'll walk you through it in a demo.

Book a demo

30 minutes on Microsoft Teams

Owned and hired plant on one register

Hired plant sits on the same register as your own, marked as hired, with its service plan alongside, whoever on the project has it.

Asset register
Asset record for a CAT CS533E Smooth Drum Roller: Heavy Plant, Rollers & Compaction, Caterpillar CS533E, 2020, unit RL-01, Ownership Hired, with its Plant Service Plan due in 5 days and a photo of the roller.

Hired plant on the same register as owned plant

Hired plant sits on the same register as owned plant, marked as hired, with its service plan alongside.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration asset; photo from the showcase's licensed set.

A PDF for the principal contractor

Each pre start saves to the machine's record, and a completed one downloads as a PDF with its outcomes for the principal contractor.

Pre-start inspections
Excerpt from an exported vehicle pre-start PDF showing the Needs attention summary, a red failed lights and indicators answer, two green passing checks, the original defect note, a purple Replaced outcome and a green Satisfactory recheck.

Read the same outcomes in the completed PDF

The completed PDF keeps the original failed check and the recorded follow-up outcomes. This excerpt is from its first page; the action taken and recheck notes continue on the second page.

MapTrack PDF export · Demonstration data · Captured

About this screenshot

An excerpt from the actual two-page PDF downloaded from this saved demonstration submission.

Seen one that fits how your team works? We'll show it to you in a demo.

Book a demo

30 minutes on Microsoft Teams

Customer proof

What customers say

Major projects

“MapTrack easily shows us where our equipment is, what project it's on & who it is assigned to. Support is super helpful.”

Sharyn Edwards, Fleet Coordinator (Major Projects), Genus
Read the Genus story

“MapTrack improves the visibility of asset availability and utilisation. MapTrack makes it easier to manage reservations , servicing and compliance requirements. It reduces the manual administration and is improving our record accuracy.”

Amberley, Plant and logistics Administrator, Civil Engineering, Mid-Market (51-1000 emp.)Verified review on G2, July 2026

“Easy to set up as an Administrator & easy for the crew to use on site”

Mike, Business Analyst, Civil Engineering, 11-50 employeesVerified review on Capterra, April 2025

Rated 4.9 on G2 (15 reviews) and 5.0 on Capterra, GetApp and Software Advice (one shared pool of 17 reviews). Capterra Best Ease of Use 2026 and Best Value 2026 badges. 600,000+ assets tracked since 2012. 24/7 support.

Want to hear how other infrastructure teams set MapTrack up? Ask us in a demo.

Book a demo

30 minutes on Microsoft Teams

By the numbers

The real cost of equipment failures on infrastructure projects

Equipment failures and poor visibility across geographically spread sites cause significant delays and cost overruns on major infrastructure projects. The numbers make a clear case for digital tracking.

14+ hrs

a week construction professionals lose to non-productive work, including 5.5 hours chasing project information

FMI and PlanGrid, Construction Disconnected (2018)

~90%

less time spent tracking assets at Saunders International, a civil and infrastructure contractor of 500-plus staff

MapTrack case study: Saunders International

48%

of rework in US construction is caused by poor data and miscommunication, costing US$31.3 billion a year

FMI and PlanGrid, Construction Disconnected (2018)

One platform

Tracking, compliance and maintenance in one system

Stop juggling spreadsheets, paper compliance folders and disconnected point solutions. MapTrack connects asset tracking, pre-starts and inspections, and usage-based maintenance into a single platform built for field use on infrastructure projects.

MapTrack Assets register showing 86 assets in a table with status, person, location, QR tag and make: Mitsubishi Triton utes, a 125mm angle grinder deployed with Jack Roberts, a round sling at Clyde North Stage 4, a CAT 140 motor grader in Repair at Dandenong Workshop, a 6L fire extinguisher, a 40m extension reel and a Yanmar SV40 excavator.

The asset register as it opens

Plant, vehicles, tools and safety gear on one register, each with its status, who has it, where it is and its QR tag.

MapTrack app · Demonstration data · Captured

About this screenshot

Demonstration workspace at a 1440 x 900 desktop viewport, the register’s default view, cropped right of the navigation sidebar to a 16:10 frame.

Want to see how these fit together on your own sites? We'll show you in a demo.

Book a demo

30 minutes on Microsoft Teams

Compliance

Pre-starts and compliance, done in the field on mobile

Build and run pre-start forms for any plant or vehicle directly on mobile. Operators scan a QR code, complete the form at the laydown area or on the active works front - with photos, and results attach to the asset record with a timestamp.

  • Works offline and syncs when back on signal
  • Failed items automatically trigger work orders
  • Full compliance history attached to each asset
  • Meets WHS pre-start obligations for registered plant
  • Build forms with AI or upload your existing forms

Accountability

Scan, assign and track across project packages

QR code any tool, attach a GPS device to plant, or pull in OEM telematics data. Assign assets to people, crews (through a crew member or crew vehicle), packages (through their project sites) or project sites. Know who has what, where it is and when it's due back with a clear chain of custody across contractors.

  • Check-in and check-out on mobile or tablet
  • Bulk scanning for package audits and project stocktakes
  • Assign to subcontractors with scoped RBAC access
  • GPS location for plant and fleet where fitted
  • Geofence alerts when assets leave a project boundary
MapTrack Assignments table listing eight tool and equipment assignments, a GNSS rover, robotic total station, two plate compactors, a lighting tower, a cordless drill, an angle grinder and a rotating laser level, each with its photo, the person it went to, a Complete or Active status and a due-back date. One plate compactor is flagged Overdue.

See who has each tool and when it is due back

Every sign-out in one list. Four assignments are back and marked Complete; four are still out as Active, each with the person and the due-back date. The plate compactor with James Ward was due back on 23 September, so it is flagged Overdue.

MapTrack app · Demonstration data · Captured

About this screenshot

Captured in a demonstration workspace on the All assignments view with the Person, Status and Due Back Date columns. The app shortens long asset and category names.

See these on a phone and a desktop in a live demo.

Book a demo

30 minutes on Microsoft Teams

Maintenance

Service plant when the hours say so. Not the calendar

Trigger work orders from engine hours, runtime or odometer - not arbitrary calendar reminders. OEM and telematics data feeds in automatically where integrated. Every service record lives alongside the asset's tracking and compliance history.

  • Meter-based triggers: hours, ODO, runtime
  • OEM telematics data feeds in automatically
  • Work orders assigned to fitters and techs on mobile
  • Complete parts history and cost tracking per asset
  • Overdue alerts so nothing slips through the schedule

Integrations

Plant data straight from the machine

MapTrack integrates with OEM telematics platforms across the major equipment brands used on infrastructure projects, so engine hours, odometer and GPS location drive maintenance and utilisation automatically, without manual data entry.

Caterpillar
John Deere
Komatsu
Hitachi
JCB
Bobcat
Teletrac Navman
Geotab
HCSS
  • Engine hour and ODO tracking for timely preventive maintenance
  • Live GPS location and geofence alerts for plant across your projects
  • Fault and diagnostic data where supported by your integration
  • Geofence-based utilisation and time-on-site for project cost reporting

See all integrations

What we track

Built for project sites, mobile and offline

MapTrack is built for the full mix of assets that move across your depots, project sites, laydown areas and packages - from hand tools to heavy earthmoving plant.

Build and run pre-start forms for any plant or vehicle directly on mobile. Operators scan a QR code, complete the form at the laydown area or on the active works front - with photos, and results attach to the asset record with a timestamp.

iOS & Android

No specialist hardware required

Offline sync

Works in tunnels & remote corridors

QR scan

Any standard phone camera

Unlimited users

No per-seat charges

Manage plant and assets across major project packages

Pre-starts, compliance records and maintenance scheduling for every asset on your infrastructure project. Built for complex, multi-package environments.

  • Used across Australia & New Zealand
  • Per-asset pricing
  • Unlimited users

Get started

How infrastructure teams roll out MapTrack

Most infrastructure teams are tracking plant and equipment across sites within days. Start with your existing register and expand to each package as you go.

Step 1

Register your plant, fleet, and survey equipment

Import your existing asset register or start from scratch. Add heavy plant, traffic management equipment, survey gear, and site vehicles.

Step 2

Assign assets to sites and project managers

Print heavy-duty QR labels and assign equipment to project sites, zones, or contracts (as contract sites) with geographic visibility.

Step 3

Track utilisation, schedule maintenance, meet reporting requirements

Monitor plant hours and utilisation, schedule preventive maintenance, and produce asset reports for project managers and clients.

The plant and lifting inspections infrastructure rules ask for

Infrastructure contractors in Australia, the United States and the United Kingdom answer to different rules, but the records they ask for look alike: what was checked, when, by whom, and what's due next. Open a market to see its rules, the words buyers there search for, and how pricing is quoted.

Australia

WHS Regulation s 213

Prices on our pricing page are in Australian dollars, ex GST.

  • Australia, in Queensland's text of the model WHS Regulations (each state and territory enacts its own version)

    Work Health and Safety Regulation 2011, section 213, maintenance and inspection of plant

    What it asks for

    The person with management or control of plant at a workplace makes sure its maintenance, inspection and, if needed, testing is done by a competent person, following the manufacturer's recommendations. Where there are none, a competent person's recommendations apply, and where neither is reasonably practicable, the plant is inspected annually.

    How MapTrack keeps the record

    Each machine's services are scheduled at the maker's interval, by date or by hours from meter readings, and the person assigned gets an email 7 days before a service falls due.

    Source: Work Health and Safety Regulation 2011 (Queensland) (Queensland Government (Queensland Legislation), checked 26 Oct 2026)

United States

OSHA 1926.1412, OSHA 1926.20(b)(2)

Pricing is quoted in your currency, US dollars.

  • United States, cranes and derricks in construction

    OSHA 29 CFR 1926.1412, crane inspections

    What it asks for

    A competent person visually inspects the crane each shift it's used. The monthly inspection is documented with the items checked, the results, and the inspector's name, signature and the date, and kept at least three months. A qualified person does an annual comprehensive inspection, documented the same way and kept at least 12 months.

    How MapTrack keeps the record

    The shift and monthly inspections are forms on the crane's record with the items checked, the results and the inspector's signature and date, and the annual inspection is a service with its report attached.

    Source: 29 CFR 1926.1412, Inspections (US Occupational Safety and Health Administration, checked 26 Oct 2026)

  • United States, construction

    OSHA 29 CFR 1926.20(b)(2), job site inspections

    What it asks for

    An employer's safety program provides for frequent and regular inspections of the job sites, materials and equipment by competent persons the employer designates.

    How MapTrack keeps the record

    Site and equipment inspections run as forms against the site or the machine, signed by the person who did them, and the history stays on each record.

    Source: 29 CFR 1926.20, General safety and health provisions (US Occupational Safety and Health Administration, checked 26 Oct 2026)

Equipment inventory
The usual US word for the list of equipment a business owns and where it is, the list Australians call an asset register.

United Kingdom

LOLER regulation 9, Work at Height Regulations reg 12

Pricing is quoted in your currency, pounds sterling.

  • United Kingdom, lifting equipment and lifting accessories

    LOLER 1998, regulation 9, thorough examination and inspection

    What it asks for

    Lifting equipment exposed to conditions that cause deterioration is thoroughly examined at least every 6 months if it lifts people or is a lifting accessory, and at least every 12 months otherwise, or to an examination scheme, plus after anything exceptional. A competent person inspects it between examinations where that suits, and equipment going to another business carries evidence of its last thorough examination.

    How MapTrack keeps the record

    Cranes, lifting beams and accessories carry their thorough examination dates and reports on their records, on a 6 or 12 month schedule.

    Source: Lifting Operations and Lifting Equipment Regulations 1998 (LOLER), regulation 9 (legislation.gov.uk (The National Archives), checked 26 Oct 2026)

  • Great Britain, work equipment for work at height

    Work at Height Regulations 2005, regulation 12, inspection of work equipment

    What it asks for

    Equipment that deteriorates is inspected at suitable intervals and after anything exceptional. A construction working platform someone could fall 2 metres or more from is inspected in position within the previous 7 days, and the inspector's report reaches the person it was done for within 24 hours. Results are kept until the next inspection, and reports stay on site until the work is finished, then at an office for 3 months.

    How MapTrack keeps the record

    Each scaffold and platform is a record at its site. The 7-day inspection is a form with the inspector's signature, saved as a PDF on that record, and anything past 7 days shows as overdue.

    Source: Work at Height Regulations 2005, regulation 12 (legislation.gov.uk (The National Archives), checked 26 Oct 2026)

LOLER thorough examination
A detailed examination of lifting equipment by a competent person: at least every 6 months for gear that lifts people and for lifting accessories, at least every 12 months for other lifting equipment, or to an examination scheme.

MapTrack keeps the records these rules ask you to keep. It does not do the inspection or testing, certify your work or make you compliant, and the current text of each instrument is the authority.

Want to see how these records would look for your own gear? We'll show you in a demo.

Book a demo

30 minutes on Microsoft Teams

Stop the loss

Equipment loss and unplanned downtime are the two biggest controllable costs in infrastructure asset management

MapTrack gives your project team the visibility, accountability and maintenance triggers to cut both without adding headcount or replacing your existing telematics.

Frequently asked questions

Common questions from infrastructure project teams.

Infrastructure asset management software is a platform that helps project teams, tier 1–3 contractors and asset owners track, manage and maintain tools, plant, equipment and vehicles across large-scale infrastructure programmes. It replaces spreadsheets, paper compliance folders and disconnected point solutions with a single source of truth for where assets are, who has them, what their compliance status is and when they're due for service. MapTrack combines asset tracking (QR codes, barcodes, GPS and OEM telematics), pre-start and inspection forms, maintenance scheduling and work orders, and reporting, all on mobile in the field.

Yes. MapTrack is built for multi-contractor environments where multiple packages, subcontractors and project teams share and transfer assets. Role-based access control (RBAC) lets you restrict visibility by package, contractor or project role. Assets can be assigned and transferred between parties with a clear chain of custody, so accountability is always documented even when dozens of contractors operate across the same programme.

Yes. MapTrack supports mixed asset types in a single platform. Use QR or barcode labels for hand tools, power tools, formwork and smaller equipment. Use GPS tracking or OEM telematics data for heavy plant, earthmoving equipment and fleet where devices or integrations are in place. All asset types - regardless of how they're tracked. Live in the same system alongside their compliance records, maintenance history and assignments.

MapTrack is built for field use with offline support. Field crews can scan assets, complete pre-start forms, update work orders and record meter readings in areas with no connectivity. Data syncs automatically when the device comes back online. This is critical for remote infrastructure corridors, tunnel environments and greenfield sites where cellular coverage is limited or absent.

Yes. Meter-based maintenance triggers (runtime hours, engine hours, odometer) drive work orders in MapTrack. Where you have OEM or telematics integrations (Caterpillar, Komatsu, Hitachi, John Deere, JCB, Teletrac Navman, Geotab and others), meter data feeds in automatically so you're servicing based on real usage. Not just the calendar. Manual meter readings are also supported where telematics is not present.

MapTrack helps infrastructure teams meet WHS and principal contractor compliance obligations by keeping pre-start records, inspection certificates and maintenance evidence attached to each asset. This includes daily plant pre-starts required under WHS Regulations, design registration and inspection requirements for registered plant, lifting equipment and pressure vessel certifications, and project-specific compliance registers required by the principal contractor or client. All evidence is searchable and exportable for audits. Failed pre-start items can automatically trigger work orders so defects are tracked from identification through to rectification.

Yes. MapTrack supports role-based access control and single sign-on for enterprise and large project deployments. RBAC lets you scope visibility by package, site, contractor or project role, so each team only sees the assets relevant to them. SSO integration simplifies onboarding across large workforces. Combined with unlimited user licensing, you can give access to every worker, supervisor and project manager without per-seat cost growth.

Use bulk scanning (QR or barcode) to verify what's on a specific project site or allocated to a package (through its project site). MapTrack records each asset scanned, when it was scanned and who scanned it. You can compare scanned results to expected asset lists and immediately see what's missing, unscanned or unaccounted for. Reports by project, package or asset class give you audit-ready evidence. Stocktakes that used to take a full shift with clipboards now take a fraction of the time on mobile.

MapTrack uses per-asset pricing with unlimited users included. Not per-seat licensing. You can give access to every field worker, supervisor, operator, site engineer and project manager without your costs growing as the team does. This is a significant advantage on infrastructure projects where crew sizes vary, subcontractors rotate through packages, and you may need hundreds of people to be able to complete forms or scans. Pricing scales with the number of assets you track, not the size of your workforce.

Most infrastructure teams are running on MapTrack within one to two weeks. The typical approach is to start with one asset class or one project package: import or scan in assets, set up your first workflows (usually pre-starts or audits), and roll out to field crews. MapTrack's onboarding team supports you through setup and training at no additional cost. For larger rollouts across multiple packages or programmes, a phased approach works well: get adoption solid on one workflow, then expand to more asset types and packages.

Put every machine on the project register, whoever owns it, and label it. Each operator does the pre start on their phone against that machine, and the completed form saves to its record with any fault photo and the fix beside it. A completed form downloads as a PDF for the principal contractor, and hired plant can be archived when it goes back.

A register that holds owned and hired plant together, pre starts and inspections on the phone that save to each machine, servicing on the hours, the latest GPS position where there's a tracker, and roles that control who can view, edit and sign gear out. MapTrack covers those with per-asset pricing and unlimited users.

Got a question we haven't answered here? Ask it in a demo.

Book a demo

30 minutes on Microsoft Teams

Get MapTrack pricing for Infrastructure teams

Tell us about your operations. Our team will share per-asset pricing tailored to your infrastructure asset mix and a rollout plan - within one business day.

Per-asset pricing. Unlimited users. Primary database hosted in Sydney.

Infrastructure teams start tracking today

Join infrastructure teams across Australia using MapTrack to track assets, run digital pre-starts and keep plant maintained, all in one platform.

Pre · Maintenance · Asset tracking · Civil · Compare

Tools from $1 · Machines from $12View pricing