MapTrack
Product
Solutions
Industries
Resources
Pricing
Sign inStart free trial
MapTrack

Australian-founded in 2012.

Track, maintain and manage every asset across every site. Built for field teams.

Product

  • All features
  • QR label store
  • Asset tracking
  • Maintenance & work orders
  • Compliance & inspections
  • GPS & fleet tracking
  • OEM integrations
  • Pricing
All features

Solutions

  • Contractor tool tracking
  • Multi-site asset management
  • Equipment maintenance
  • Compliance & inspections
  • Asset lifecycle & depreciation
  • Small business
  • Enterprise
  • For operations managers
  • For safety managers
  • For field teams
All solutions

Industries

  • Construction
  • Civil contractors
  • Plumbing contractors
  • Electrical contractors
  • HVAC contractors
  • Landscaping
  • Building services
  • Mining & resources
  • Oil & gas
  • Industrial maintenance
  • Facilities services
  • Fleet & transport
  • Government & councils
  • Manufacturing
  • Energy & utilities
  • Infrastructure
  • Healthcare
  • Education
  • IT assets
  • Aviation
  • Fire safety & protection
More industries

Resources

  • Resource centre
  • Customer stories
  • Glossary
  • Blog
  • Templates
  • Tools
  • Industry statistics
  • ROI Calculator
  • Help & FAQ
  • API documentation
  • Compare MapTrack
  • Alternatives
  • Software guides
  • Use cases
  • Sitemap
  • Book a demo

Company

  • About
  • Contact
  • Refer a friend
Help & FAQSecurity & privacyPrivacy policyTerms of service
© 2026 MapTrack. All rights reserved.
Resources/The Fastest Way to Reduce Project Delays Using GPS
Industry guide10 min read

The Fastest Way to Reduce Project Delays Using GPS

Utilities field crew with GPS-tracked vehicles on a power infrastructure project

Field project delays in utilities and energy infrastructure almost always trace back to the same cause: not knowing where equipment is or where crews are when a schedule changes. GPS tracking closes that visibility gap. This guide shows how utilities project managers deploy GPS to cut delays, improve crew coordination and stop hire equipment from running over time.

Start free trial

In this guide

  1. 1.Why GPS reduces project delays in utilities
  2. 2.The real cost of project delays in utilities
  3. 3.Equipment categories GPS tracks for utilities
  4. 4.Before and after: GPS on a utilities infrastructure project
  5. 5.How MapTrack supports utilities project teams
  6. 6.Getting GPS deployed fast
  7. 7.Key takeaways for utilities project managers

See how MapTrack manages your assets

Join teams across Australia and New Zealand tracking, maintaining and managing assets in the field, with one platform built for real-world operations.

Start free trial
  • No credit card required
  • 30 days free trial
  • Cancel anytime

Why GPS Reduces Project Delays in Utilities

Most delays on utilities field projects are not caused by technical failures or weather. They are caused by information gaps: a crew arrives at a site and the required plant is not there, or a project manager needs to redirect resources but cannot confirm where they are. These delays are small individually but compound across a programme of concurrent works.

The traditional response to these gaps is phone calls, radio checks and self-reported timesheets. These methods work for a single crew on a single site. They break down when a project manager is responsible for five concurrent HV line maintenance programmes across different regions. The volume of coordination required exceeds what voice communication can reliably deliver.

GPS tracking replaces the information gap with a live map. Every vehicle, piece of plant and specialist trailer has a confirmed location at any moment. When a schedule change requires redirecting a crew or reassigning plant between sites, GPS visibility makes that decision in under a minute rather than through a series of phone calls that may take twenty minutes to resolve.

The Real Cost of Project Delays in Utilities

Utilities network maintenance programmes operate under contractual service windows and regulatory performance obligations. A delayed planned outage that runs past its agreed reinstatement window can generate a compliance incident for the network operator and a penalty exposure for the contractor. These costs are not hypothetical. Australian network service providers report on reliability metrics that directly affect their regulatory standing.

Labour cost is the most immediate financial impact of a delayed project. Crew idle time, when a gang of four technicians waits forty-five minutes for plant that has not arrived at the site, is billed at award rates regardless of whether productive work is happening. Across a programme of thirty concurrent works, that idle time adds up quickly.

Hire equipment overruns are a third cost category that GPS tracking eliminates directly. An excavator hired for a two-week cable installation programme that sits idle on site for three extra days because nobody was watching the return date represents a cost that should never have occurred. Asset register management with hire return alerts prevents that from happening.

Reputation and contract risk compound the financial impact over time. A utilities contractor that consistently overruns project schedules loses confidence from network operators at renewal. The cost of a single lost contract renewal dwarfs any investment in GPS tracking that could have prevented the performance issues.

Equipment Categories GPS Tracks for Utilities

Utilities field operations run across a broad range of equipment types, each with different tracking requirements. The priority order below reflects where GPS tracking delivers the fastest reduction in project delays for energy and network maintenance teams.

Fleet Vehicles and Work Trucks

Line trucks, EWP-mounted vehicles, cable fault response units and service vans carry the crews whose location drives schedule performance. Knowing where every vehicle is at any moment allows project managers to dispatch the nearest available crew to an urgent fault or redirect a team from a completed task to the next priority without a radio chain.

Fleet vehicle GPS also feeds engine hour-based maintenance scheduling for the vehicles that carry the most critical crews. An EWP-mounted vehicle that misses a scheduled service and fails on site during a transmission line maintenance window creates a delay that ripples across the entire programme.

Heavy Plant and Machinery

Excavators, cable ploughs, directional boring rigs and trenchers are the high-value shared plant that move between concurrent works across a programme. Without GPS, the question “where is the boring rig right now?” requires a phone call chain that may take twenty minutes to resolve. With GPS, the answer is visible on a map in seconds.

Hired heavy plant is a particular focus. GPS utilisation data shows how many hours a hired machine actually ran each day against the hire period. When utilisation is low, the project manager has objective data to support an early return request, avoiding unnecessary hire costs and freeing the equipment for another programme.

Specialist Field Equipment

Cable reel trailers, cable pulling equipment, transformer dollies, conductor stringing sets and similar specialist assets move between depots and project sites throughout a programme. These items are expensive to hire as replacements when they cannot be located. GPS or QR location records on each item show the last confirmed site without a physical search.

Mobile Generators and Compressors

Temporary power supplies, portable compressors and pneumatic tool kits support works at sites without mains power or compressed air infrastructure. These assets move frequently and are regularly left on remote sites between works. Battery-powered GPS trackers on each unit provide location confirmation and after-hours geofence alerts for theft prevention.

Safety and Traffic Management Assets

Traffic management equipment, barricades, variable message signs and hazard lighting deployed across road-affecting utility works require clear accountability records. Site clearance audits that confirm all safety equipment has been recovered at works completion protect the contractor from liability and satisfy regulatory requirements for road network reinstatement.

Before and After: GPS on a Utilities Infrastructure Project

The scenario below reflects outcomes observed across Australian utilities contractors that have moved from manual fleet coordination to digital GPS tracking. The figures represent patterns reported by project managers running network maintenance and infrastructure works programmes.

Before GPS tracking. A mid-sized network maintenance contractor managing eight concurrent HV line works across a regional area coordinated fleet and plant through radio and a shared spreadsheet updated each morning. A hired cable plough ran eighteen days past its agreed return date before the overrun was caught at invoice reconciliation. Two crew deployments per week were delayed by an average of forty minutes because plant confirmed as “on site” by the previous shift could not be located on arrival.

After GPS tracking. The same contractor deployed GPS tracking on all fleet vehicles and hired and owned heavy plant. Crew deployment delays dropped to under five minutes per incident in the first month. The live map confirmed plant location before crews departed the depot. The hire return alert system prevented any overruns in the following quarter, saving more than $12,000 in unnecessary hire charges against a programme of sixteen concurrent works.

The implementation required no changes to existing work procedures. GPS hardware was installed across the primary fleet over a single weekend. Battery-powered trackers on trailers and generators were fitted by field supervisors in under five minutes each, with no specialist installation required.

How MapTrack Supports Utilities Project Teams

MapTrack integrates GPS tracking directly into the asset register, so location data, maintenance history and check-in/out logs all sit on the same record. There is no separate fleet tracking system to manage alongside the asset register, so everything is visible from a single platform available on desktop and the mobile app field crews already use.

Live map view. The web dashboard and mobile app display the current location of all GPS-tracked assets on a map. Project managers can confirm plant is on the correct site without making a phone call. If an asset moves outside a geofence during non-working hours, the relevant contacts are notified immediately.

Engine hours into maintenance scheduling. For hardwired GPS units on vehicles and plant, engine hour data flows automatically into the maintenance module. Service due dates update dynamically as usage data comes in. When a vehicle is approaching its service interval, the system generates an alert and, optionally, a draft work order, without anyone needing to check the hours manually.

Hire equipment management. Hired assets can be flagged with their hire company, daily rate, start date and return date. The system sends alerts before the hire period expires and generates a utilisation report showing actual operating hours against the hire period, the information needed for invoice reconciliation and early return decisions.

Geofencing for remote site security. Define a virtual boundary around remote work sites, depots or restricted zones. An asset that moves outside its assigned geofence after hours triggers an immediate alert. For plant left on a remote transmission line site over a long weekend, a geofence exit at night is an unambiguous signal that supports a fast response.

Getting GPS Deployed Fast

Deploying GPS across a utilities field fleet does not require a lengthy procurement or IT project. Most utilities contractors have their primary fleet tracked and operational within two weeks. The rollout below is designed for an operation starting from no existing GPS hardware.

Hardware selection. Choose hardwired GPS units for fleet vehicles and heavy plant with a constant power source. Use battery-powered trackers for trailers, generators, portable compressors and any plant that moves between sites without a direct power connection. A battery-powered tracker reporting every four hours provides sufficient location data for field operations at a fraction of the cost of real-time hardwired units.

Installation timeline. A hardwired GPS unit on a fleet vehicle takes thirty to ninety minutes to install. Across a fleet of thirty vehicles, a single vehicle electrician can complete the programme over two to three days. Battery-powered trackers require no specialist installation; field supervisors can fit them to trailers and portable plant in under five minutes each.

Platform configuration and training. Set up the MapTrack platform with asset names, geofences and maintenance intervals in parallel with hardware installation. Training for project managers and field supervisors on the dashboard and mobile app takes under thirty minutes per person. Most utilities operations complete their first full GPS-informed crew dispatch within the first week of deployment.

Key Takeaways for Utilities Project Managers

Project delays in utilities field operations are predictable and preventable. The delays that generate the most cost (crews waiting for plant that cannot be located, hire equipment overruns that are not caught until invoice reconciliation, schedule changes that take twenty minutes of phone calls to action) all share the same root cause. No live visibility over where equipment and crews are at any moment.

GPS tracking resolves the information gap that causes crew idle time. When a project manager can see every vehicle and piece of plant on a live map, schedule changes become a one-minute decision rather than a twenty-minute coordination effort. That speed advantage compounds across a programme of concurrent works, delivering measurable improvements to on-time project completion.

Hire equipment management is the fastest financial return. Setting return-date alerts and reviewing weekly utilisation reports prevents the idle hire overruns that accumulate quietly on long programmes. Most utilities contractors recover the cost of their GPS programme within the first two quarters through hire cost savings alone.

Start with fleet vehicles and primary plant, then extend to specialist trailers and portable equipment. The live map view and geofence alerts deliver the majority of the scheduling improvement within the first month. Utilities project teams that run the tightest programmes are the ones who know exactly where every vehicle and piece of plant is, and can act on that information immediately.

FAQ

How does GPS tracking directly reduce project delays on utilities and infrastructure works?
Most field project delays trace back to two root causes: not knowing where equipment is and not being able to coordinate crews efficiently across dispersed sites. GPS gives project managers a live map of every vehicle and piece of plant, so equipment can be redirected to where it is needed without radio calls or phone chains. When a crew arrives at a site and the required plant is already confirmed on location, the work starts on time rather than waiting for an equipment search to resolve.
Which field equipment types should utilities teams prioritise for GPS tracking?
Start with fleet vehicles: line trucks, EWP-mounted vehicles and cable fault response units. These carry crews, so their location directly drives schedule performance. Next, add heavy plant: excavators, cable ploughs, directional boring rigs and trenchers that are shared across multiple concurrent works. Once primary fleet and plant are tracked, extend to specialist trailers, mobile generators and temporary power supplies used across network maintenance programmes.
How quickly can GPS tracking be deployed across a utilities maintenance fleet?
A fleet of thirty vehicles and pieces of plant can be GPS-equipped and operational within two weeks. Hardwired units on vehicles typically take thirty to ninety minutes to install each. Battery-powered trackers on trailers, generators and portable plant take under five minutes. Platform configuration (geofences, alert contacts, maintenance triggers) runs in parallel with hardware installation and adds no additional time to the rollout.
Can GPS tracking reduce our hire equipment costs on infrastructure projects?
Hired plant is one of the most significant sources of avoidable cost on utilities infrastructure projects. GPS utilisation data shows exactly how many hours a hired excavator or cable plough ran each day, making it straightforward to identify underutilised machines and arrange early return before the next billing period. Return-date alerts set three to five days before hire expiry give enough notice to extend or return equipment without paying for unnecessary days.
Is MapTrack suitable for utilities contractors managing multiple concurrent field crews?
Multi-crew, multi-site utilities operations are exactly the environment where GPS tracking delivers the most value. A project manager overseeing five concurrent HV line maintenance programmes across different regions can see the location of every vehicle, crew and piece of plant from a single dashboard. When a schedule change requires redirecting a crew or reassigning plant between sites, the live map view provides the situational awareness to make that decision in under a minute rather than through a series of phone calls.

Related guides

ROI guide

How Construction Firms Improve ROI with GPS Tracking

Best practices

Maintenance Scheduling Best Practices for Heavy Equipment

Compliance guide

Oil & Gas Safety Compliance Through Asset Management

Explore

  • Resources
  • Blog
  • Pricing
  • Features
  • Templates

Ready to get started?

See how MapTrack helps teams track, maintain and manage assets in the field.

Start free trialBook a demo