WA Bridge Crossing Permits and Restricted Bridges

Lachlan McRitchie

Lachlan McRitchie

Co-Founder & GM of Operations

Published 25 November 2026

When WA restricted access and special purpose vehicles need a Main Roads bridge crossing permit: how to apply, restricted bridge lists and crossing rules.

In Western Australia, a Restricted Access Vehicle (RAV) or Special Purpose Vehicle (SPV) on a period permit needs a Main Roads bridge crossing permit to cross a bridge on that permit’s restricted list. The Class 1 RAV Low Loader Overmass Period Permit Operating Conditions (clause 9.5.2) and the SPV Standard Operating Conditions (clause 6.4.3) name the form to use.

Your permit’s own conditions come first. Where Main Roads’ documents differ, this guide says so: follow your permit and ask Main Roads Heavy Vehicle Services (HVS) on 138 486.

When You Need a Bridge Crossing Permit

You need one when your route crosses a bridge your permit restricts and you can’t avoid it. In the words of Main Roads’ SPV information sheet: “If a restricted structure cannot be avoided, you must apply for an SPV Bridge Crossing permit.”

Your permitRestricted bridgesTo cross oneSource
Class 1 RAV Low Loader Overmass period permitThose restricted for your category in the Class 1 RAV Low Loader Overmass Restricted StructuresA Bridge Crossing PermitD13#399261, clauses 9.4 and 9.5.2
Oversize single trip permit used with a low loader overmass period permitThe Class 1 list, unless the Single Trip Permit specifically allows the bridge, and bridges marked “Bridge not to be crossed” on 8 Tyre Per Axle networksA Bridge Crossing Permit, lodged with the single trip applicationD19#696602, clauses 1.2.2 and 1.2.3; D25#54014, clause 6.2.1.1
SPV State-Wide (Standard) period permitThe 2, 3 and 4 Axle SPV or All Terrain SPV listAn SPV Bridge Crossing Permit, before the tripD15#400816, clauses 6.4.1 and 6.4.3
SPV 12 month Motor Vehicle or Combination period permitThe individual Restricted Bridge list on your permitAn SPV Bridge Crossing PermitD25#1127968; D15#400816, clause 6.4.3

Planning a heavier single trip? All WA bridges are individually assessed for the specific vehicle configuration, and you can ask Main Roads’ Structures Engineering Branch for a Mass Only Assessment of your route and combination. It can take more than 4 weeks, and no fee applies (single trip guidelines, section 3).

How to Apply and When to Lodge

Use the form that matches your period permit, and list only the restricted bridges you’re crossing.

What it asksBridge Crossing PermitSPV Bridge Crossing Permit
FormBridge Crossing Permit Application, on the Oversize Overmass (OSOM) Single Trip Permits pageSPV Bridge Crossing Permit Application, on the Special Purpose Vehicle page
Who can applyA registered operator with Main Roads WAA registered operator, with each SPV registered; no WA Heavy Vehicle Accreditation needed
DetailsPeriod permit number, movement start date, registrations, the load, requested mass per axle group and axle spacingsCurrent period permit number, commencement date, registration or Department of Transport permit number, vehicle identification or chassis number, and a description such as crane
Return tripTick “Immediate Return Trip Required”Tick “Return Trip Required?”
Email it topermit.applications@mainroads.wa.gov.auhvospv@mainroads.wa.gov.au
  • With a single trip: lodge the Bridge Crossing Permit with the Specified Journey (Single Trip) Permit Application (clause 6.2.1.1). That goes in no more than one month ahead, and at least seven business days before a movement with a Traffic Escort Booking; the guidelines advise seven business days for others too (section 3).
  • SPVs: get the permit before you start the trip (Special Purpose Vehicle page).
  • Fees: Main Roads charges a fee for each crossing permit; check its current fee on the OSOM Single Trip Permits or Special Purpose Vehicle page. If you pay by electronic funds transfer or cheque, the permit isn’t issued until the payment is confirmed or the cheque clears (both forms).

Crossing restricted bridges? See how footage requests and permit records work in MapTrack.

Book a demo

30 minutes on Microsoft Teams

How Long a Crossing Permit Lasts

Main Roads’ documents don’t give one answer, so check the dates on your permit.

PermitHow long it lastsReturn trip
SPV Bridge Crossing Permit“valid for 1 month” (Special Purpose Vehicle page) or a 30-day validity (application form)Completed within the permit’s validity (form)
Bridge Crossing PermitAn application “for a single movement” (OSOM Single Trip Permits page). Neither the page nor the form states a validity period.Tick “Immediate Return Trip Required”
Specified Journey (Single Trip) Permit lodged with itOne movement within one month, “from the date of issue” (guidelines, section 3) or “beginning from the movement start date” (clause 6.2.3)Where the permit specifies it, not for a platform trailer, and not added later (section 3; clause 7.3)

On a single trip permit, an immediate return trip must come back to the departure address with the same configuration, load, dimensions and mass, and the guidelines say there are no extensions if it isn’t completed within the permit timeframe (clause 6.6.8).

Where the Restricted Bridge Lists Are

The standard lists are PDFs on Main Roads’ website, and they’re also in the RAV Mapping Tool. The Class 1 and SPV operating conditions say list changes take effect from the Wednesday after an amendment (clauses 10.2.2 and 4.2.2), so check the current list in the route check both require before departure (clauses 9.2 and 6.3.1).

ListDocument and dateWhere to find it
Class 1 RAV Low Loader Overmass Restricted Structures, Categories 1, 2 and 3D20#609225, 17 November 2026OSOM Period Permits page and the RAV Mapping Tool
2, 3 and 4 Axle Special Purpose Vehicles Restricted StructuresD20#609223, 11 March 2025Special Purpose Vehicle page and the RAV Mapping Tool
All Terrain Special Purpose Vehicles Restricted StructuresD20#609224, 11 March 2025Special Purpose Vehicle page and the RAV Mapping Tool
Individual Restricted Bridge list, for SPV 12 month Motor Vehicle or Combination permitsOn your permitNot on the map; search each bridge number on the RAV Mapping Tool

What Counts as a Bridge, and Finding Its Number

More than the word suggests: culverts count.

DocumentIts definition of a bridge
Single trip guidelines, D25#54014 (January 2025), section 2“A structure that can be driven over and includes a bridge, overpass, ramp, tunnel, culvert, or similar infrastructure that is identified on the ‘Drive Over Structures’ layer on the RAV Mapping Tool.”
Bridge Video Supervision (BVS) Audit Requirements, D20#357426 (June 2020), section 2“A structure that can be driven over and includes a bridge, overpass, ramp, tunnel, culvert, causeway or similar infrastructure.”

To find a bridge’s number, look it up on the restricted list, where each row starts with it, or on the RAV Mapping Tool: Drive Over Structures under Points of Interest shows every structure, and you can search by number (SPV information sheet). The BVS Audit Requirements (section 12) also point to Main Roads’ Structures Web App and Road Information Mapping System. On a BVS permit, the operating conditions name the bridges that need video, one by one or as a range, such as all bridges within a region (BVS commonly asked questions, April 2018, question 6). Number formats vary: the BVS page writes #977 where the Class 1 list writes 0977.

Default Bridge Crossing Conditions

Your permit’s conditions come first; the OSOM Single Trip Permits page says bridge crossing operating conditions are provided with the issued permit. These are the defaults in Main Roads’ standard documents.

RuleApplies toSource
No more than 25 km/h, in the centre of the traffic lanes in your direction of travel, unless the permit sets a lower speed or another position for that bridgeOvermass RAVs on Single Trip OSOM permitsD19#696602, clauses 8.5.1 and 8.5.2
On a bridge that isn’t restricted, the most centre part of the lane, or the centre of multiple lanes in your directionClass 1 RAV Low Loader Overmass permitsD13#399261, clause 9.5.1
At least 200 metres behind any other heavy vehicle on a bridgeClass 1 RAV Low Loader Overmass permitsD13#399261, clause 9.6
At least 200 metres behind any other RAV on a bridge, despite the 100 metre convoy spacingSPVs travelling in convoyD15#400816, clauses 12.9.12 and 12.9.13
No Metropolitan Area bridge in peak hours if you must cross in its centreSPVs over statutory mass limitsD15#400816, clause 13.2.3

Main Roads’ Bridge Supervision Conditions video, linked from its BVS page, sets out a crossing under a permit’s bridge crossing conditions:

  1. As close as practicable to the centre of the bridge, unless otherwise specified for that bridge.
  2. All other traffic excluded from the bridge, unless otherwise specified for that bridge.
  3. No more than 10 km/h, or 5 km/h for a RAV with a platform trailer with more than 16 axles and/or more than 12 tyres per axle.
  4. At least two licensed pilots managing traffic.
  5. Video recorded under the BVS Audit Requirements.

That 5 km/h limit appears in the video’s description but in none of the written documents under Sources, so check your permit and ask HVS. The March 2026 SPV conditions (revision 5) removed the general 25 km/h and centre movement bridge rules for SPVs; follow what your permit sets.

Central movement over bridges on Great Eastern Highway between Roe Highway (Midvale) and Yilgarn Avenue (Northam) needs at least three pilot vehicles, and on Tonkin Highway north of Roe Highway at least two follow to manage traffic from the rear (Single Trip OSOM clauses 13.7.4 and 13.7.7; SPV clauses 12.7.5 and 12.7.8). More in WA pilot and escort vehicle requirements.

Named Bridges With a Set Position

Main Roads’ BVS page links short videos for named bridges, each for a condition your permit can specify. The positions below are copied from the videos’ descriptions; watch the video before you cross. A general video covers divided carriageway bridges: central movement in the direction of travel only, with traffic in that direction excluded.

BridgeNumberPosition or conditionSource
Stirling Bridge, Stirling Highway, East Fremantle#0942Central movement in the direction of travel only, excluding traffic in the direction of travel, or in both directions under the other condition4 videos, northbound and southbound
Causeway East Flyover Bridge, Canning Highway over Albany Highway, Victoria Park#0954As for Stirling Bridge4 videos, westbound and eastbound
Ewing Street Railway Bridge, Leach Highway, Welshpool#977As close to the centre median as practicable2 videos, northbound and southbound
Bushmead Road Bridge over Roe Highway, Hazelmere#1188Westbound: central movement in the direction of travel, within the marked lane. Eastbound: as close as possible to the footpath. Traffic excluded in both directions.2 videos, westbound and eastbound
Reid Highway Bridge over Mitchell Freeway, Balcatta#1202Westbound: within the left hand traffic lane1 video, westbound
Port Bouvard Bridge, Dawesville#1224As for Stirling Bridge2 videos
Ord Diversion Dam, Victoria Highway, Kununurra#1242As close as possible to the southern kerb. Over 3.5 metres wide, notify the Water Corporation Dam’s Controller at least 24 hours before crossing.1 video; D19#696602, clause 6.4

When Bridge Video Supervision (BVS) Is Added

Main Roads’ BVS page says BVS conditions are applied to permits when the route needs a bridge crossing and the combination’s mass means the crossing has to be video supervised. BVS lets operators cross without a Main Roads officer physically supervising (BVS Audit Requirements, section 1; BVS questions, question 1). The BVS questions (question 2) list four permits that can carry it, the Bridge Crossing Permit among them.

Height can add it too: where a load can’t keep a 300 mm safety buffer under a structure such as a bridge, the Oversize Vehicle Route Survey Audit Regime (clause 2.4) says to state that in the Oversize Permit application, and additional BVS conditions are then applied.

Where BVS is on the permit, the Single Trip OSOM and SPV conditions (clauses 8.5.3 and 6.4.2) point to the BVS Audit Requirements. Section 6 asks for a driver statement before each day’s travel, a wait for the lead pilot to confirm the bridge is secured, continuous recording from the approach until the combination is fully clear, and no more than 10 km/h until it’s clear or the rear pilot says so. BVS needs at least two licensed pilots, and more where two can’t control approaching traffic in every direction (BVS questions 7-9; that April 2018 document says “accredited and authorised” pilots). The operator keeps each recording for at least 12 months from the permit’s expiry and enters every BVS permit in Main Roads’ BVS Register Template, used or not (section 4, items 9 and 19).

More in Main Roads WA video recording requirements compared and Bridge Video Supervision (BVS) for Main Roads WA.

What MapTrack Does and Doesn’t Do

MapTrack is an asset management platform that also supplies AI dash cams. It’s the platform behind 600,000+ assets tracked since 2012.

Running AI dash cams in MapTrack? Account owners can request footage from a trip, with faces and number plates blurred. Blur is an option on each request. Camera footage and safety events are shown to account owners. See video telematics for how footage requests work.

  • Keep each permit and its operating conditions on the truck’s record as files.
  • Put the camera check and the BVS training sign-off on a phone as forms, with photos and a drawn signature.
  • Track each permit’s expiry and keep-until dates in the free BVS records log. It sits beside Main Roads’ BVS Register, never instead of it.
  • Keep the BVS procedures, roles and training sign-offs in the free Bridge Video Supervision training register.

Where it stops:

  • It isn’t a Main Roads approval, and nothing on this page is endorsed by Main Roads.
  • Keep the camera’s original recordings for at least 12 months after the permit expires. Don’t use a requested clip as your BVS record unless you’ve checked it has the date, time, speed and audio and is in its original, compatible format.
  • A request can’t replace a crossing that wasn’t recorded.
  • Permit applications, route checks, and the speed, position and pilots on the day are still on the operator and the driver.

Forwarding this to whoever signs off on permits? The tables and Sources are Main Roads’ own documents, and a demo is 30 minutes on Microsoft Teams.

Sources

Every rule here comes from these Main Roads WA documents and pages, checked on 25 November 2026.

This guide summarises Main Roads WA’s documents as of November 2026, and your permit and Main Roads’ current documents govern.

Running bridge crossing permits? See it on your own trucks

Request footage from a trip and keep each truck’s permits, camera checks and sign-offs on its record in MapTrack.

  • No credit card required

About the author

Lachlan McRitchie

Lachlan McRitchie

Co-Founder & GM of Operations

Lachlan leads operations at MapTrack, bringing 10+ years of enterprise technology experience across mining, construction and heavy industry. Before MapTrack, he held senior roles at Workato (integration and automation) and AppDynamics/Cisco (application performance), working directly with ASX-listed organisations to modernise their technology stacks. His deep understanding of field operations and blue-collar workflows shapes how MapTrack solves real problems for asset-intensive teams.

View LinkedIn profile →

FAQ

Do I need a bridge crossing permit in WA?

Yes, if your Restricted Access Vehicle (RAV) or Special Purpose Vehicle (SPV) has to cross a bridge its period permit restricts. The Class 1 RAV Low Loader Overmass Period Permit Operating Conditions (clause 9.5.2) point you to the Bridge Crossing Permit Application form, and the SPV Standard Operating Conditions (clause 6.4.3) say you must get an SPV Bridge Crossing Permit. Check your route against the current restricted list first.

How do I apply for an SPV bridge crossing permit?

Fill in Main Roads’ Special Purpose Vehicle Bridge Crossing Permit Application form and email it to hvospv@mainroads.wa.gov.au before the trip. It asks for your current period permit number, the vehicle’s registration or Department of Transport permit number, its vehicle identification number (VIN) or chassis number, a description such as crane, and only the bridge numbers you’re crossing from your Restricted Bridge List.

How long is an SPV bridge crossing permit valid?

About a month, but Main Roads words it two ways. The SPV Bridge Crossing Permit Application form gives the permit a 30-day validity, and any return trip must be completed within it. Main Roads’ Special Purpose Vehicle page says it’s valid for 1 month. Follow the dates on your permit, and ask Main Roads Heavy Vehicle Services on 138 486 if they’re unclear.

Do I lodge the bridge crossing permit with my single trip application?

Yes, when you’re using an oversize single trip permit with a period permit such as the Class 1 RAV Low Loader Overmass and crossing that period permit’s restricted bridges. Main Roads’ single trip guidelines (D25#54014, January 2025, clause 6.2.1.1) say the Bridge Crossing Permit must be lodged at the same time as the Specified Journey (Single Trip) Permit Application.

Where do I find the restricted bridge lists?

On Main Roads’ website and its RAV Mapping Tool. The Class 1 RAV Low Loader Overmass Restricted Structures list is on the Oversize Overmass (OSOM) Period Permits page, and the 2, 3 and 4 Axle and All Terrain SPV lists are on the Special Purpose Vehicle page. A 12 month SPV Motor Vehicle or Combination permit has its own list on the permit, as the SPV information sheet (D25#1127968) explains.

Does a culvert count as a bridge?

Yes. Main Roads’ single trip guidelines (D25#54014, January 2025) define a bridge as a structure that can be driven over, including a bridge, overpass, ramp, tunnel, culvert or similar infrastructure on the RAV Mapping Tool’s Drive Over Structures layer. The Bridge Video Supervision Audit Requirements (D20#357426, June 2020) use a similar definition that also names causeways.

How fast can I cross a bridge on a BVS permit?

No faster than 10 km/h for the whole crossing, until the vehicle is fully clear of the bridge or the rear pilot advises it’s clear, under section 6 of the Bridge Video Supervision (BVS) Audit Requirements. Main Roads’ Bridge Supervision Conditions video sets 5 km/h for a platform trailer with more than 16 axles and/or more than 12 tyres per axle. Your permit’s conditions come first.

Does BVS mean no Main Roads officer at the crossing?

Yes. Bridge Video Supervision (BVS) lets operators cross structures without a Main Roads officer physically supervising the crossing, as section 1 of the BVS Audit Requirements (D20#357426) and question 1 of Main Roads’ BVS questions explain. The crossing is video recorded instead, with at least two licensed pilots, and the operator keeps each recording for at least 12 months from the permit’s expiry date.