In Western Australia, a Restricted Access Vehicle (RAV) or Special Purpose Vehicle (SPV) on a period permit needs a Main Roads bridge crossing permit to cross a bridge on that permit’s restricted list. The Class 1 RAV Low Loader Overmass Period Permit Operating Conditions (clause 9.5.2) and the SPV Standard Operating Conditions (clause 6.4.3) name the form to use.
Your permit’s own conditions come first. Where Main Roads’ documents differ, this guide says so: follow your permit and ask Main Roads Heavy Vehicle Services (HVS) on 138 486.
When You Need a Bridge Crossing Permit
You need one when your route crosses a bridge your permit restricts and you can’t avoid it. In the words of Main Roads’ SPV information sheet: “If a restricted structure cannot be avoided, you must apply for an SPV Bridge Crossing permit.”
| Your permit | Restricted bridges | To cross one | Source |
|---|---|---|---|
| Class 1 RAV Low Loader Overmass period permit | Those restricted for your category in the Class 1 RAV Low Loader Overmass Restricted Structures | A Bridge Crossing Permit | D13#399261, clauses 9.4 and 9.5.2 |
| Oversize single trip permit used with a low loader overmass period permit | The Class 1 list, unless the Single Trip Permit specifically allows the bridge, and bridges marked “Bridge not to be crossed” on 8 Tyre Per Axle networks | A Bridge Crossing Permit, lodged with the single trip application | D19#696602, clauses 1.2.2 and 1.2.3; D25#54014, clause 6.2.1.1 |
| SPV State-Wide (Standard) period permit | The 2, 3 and 4 Axle SPV or All Terrain SPV list | An SPV Bridge Crossing Permit, before the trip | D15#400816, clauses 6.4.1 and 6.4.3 |
| SPV 12 month Motor Vehicle or Combination period permit | The individual Restricted Bridge list on your permit | An SPV Bridge Crossing Permit | D25#1127968; D15#400816, clause 6.4.3 |
Planning a heavier single trip? All WA bridges are individually assessed for the specific vehicle configuration, and you can ask Main Roads’ Structures Engineering Branch for a Mass Only Assessment of your route and combination. It can take more than 4 weeks, and no fee applies (single trip guidelines, section 3).
How to Apply and When to Lodge
Use the form that matches your period permit, and list only the restricted bridges you’re crossing.
| What it asks | Bridge Crossing Permit | SPV Bridge Crossing Permit |
|---|---|---|
| Form | Bridge Crossing Permit Application, on the Oversize Overmass (OSOM) Single Trip Permits page | SPV Bridge Crossing Permit Application, on the Special Purpose Vehicle page |
| Who can apply | A registered operator with Main Roads WA | A registered operator, with each SPV registered; no WA Heavy Vehicle Accreditation needed |
| Details | Period permit number, movement start date, registrations, the load, requested mass per axle group and axle spacings | Current period permit number, commencement date, registration or Department of Transport permit number, vehicle identification or chassis number, and a description such as crane |
| Return trip | Tick “Immediate Return Trip Required” | Tick “Return Trip Required?” |
| Email it to | permit.applications@mainroads.wa.gov.au | hvospv@mainroads.wa.gov.au |
- With a single trip: lodge the Bridge Crossing Permit with the Specified Journey (Single Trip) Permit Application (clause 6.2.1.1). That goes in no more than one month ahead, and at least seven business days before a movement with a Traffic Escort Booking; the guidelines advise seven business days for others too (section 3).
- SPVs: get the permit before you start the trip (Special Purpose Vehicle page).
- Fees: Main Roads charges a fee for each crossing permit; check its current fee on the OSOM Single Trip Permits or Special Purpose Vehicle page. If you pay by electronic funds transfer or cheque, the permit isn’t issued until the payment is confirmed or the cheque clears (both forms).
Crossing restricted bridges? See how footage requests and permit records work in MapTrack.
Book a demo30 minutes on Microsoft Teams
How Long a Crossing Permit Lasts
Main Roads’ documents don’t give one answer, so check the dates on your permit.
| Permit | How long it lasts | Return trip |
|---|---|---|
| SPV Bridge Crossing Permit | “valid for 1 month” (Special Purpose Vehicle page) or a 30-day validity (application form) | Completed within the permit’s validity (form) |
| Bridge Crossing Permit | An application “for a single movement” (OSOM Single Trip Permits page). Neither the page nor the form states a validity period. | Tick “Immediate Return Trip Required” |
| Specified Journey (Single Trip) Permit lodged with it | One movement within one month, “from the date of issue” (guidelines, section 3) or “beginning from the movement start date” (clause 6.2.3) | Where the permit specifies it, not for a platform trailer, and not added later (section 3; clause 7.3) |
On a single trip permit, an immediate return trip must come back to the departure address with the same configuration, load, dimensions and mass, and the guidelines say there are no extensions if it isn’t completed within the permit timeframe (clause 6.6.8).
Where the Restricted Bridge Lists Are
The standard lists are PDFs on Main Roads’ website, and they’re also in the RAV Mapping Tool. The Class 1 and SPV operating conditions say list changes take effect from the Wednesday after an amendment (clauses 10.2.2 and 4.2.2), so check the current list in the route check both require before departure (clauses 9.2 and 6.3.1).
| List | Document and date | Where to find it |
|---|---|---|
| Class 1 RAV Low Loader Overmass Restricted Structures, Categories 1, 2 and 3 | D20#609225, 17 November 2026 | OSOM Period Permits page and the RAV Mapping Tool |
| 2, 3 and 4 Axle Special Purpose Vehicles Restricted Structures | D20#609223, 11 March 2025 | Special Purpose Vehicle page and the RAV Mapping Tool |
| All Terrain Special Purpose Vehicles Restricted Structures | D20#609224, 11 March 2025 | Special Purpose Vehicle page and the RAV Mapping Tool |
| Individual Restricted Bridge list, for SPV 12 month Motor Vehicle or Combination permits | On your permit | Not on the map; search each bridge number on the RAV Mapping Tool |
What Counts as a Bridge, and Finding Its Number
More than the word suggests: culverts count.
| Document | Its definition of a bridge |
|---|---|
| Single trip guidelines, D25#54014 (January 2025), section 2 | “A structure that can be driven over and includes a bridge, overpass, ramp, tunnel, culvert, or similar infrastructure that is identified on the ‘Drive Over Structures’ layer on the RAV Mapping Tool.” |
| Bridge Video Supervision (BVS) Audit Requirements, D20#357426 (June 2020), section 2 | “A structure that can be driven over and includes a bridge, overpass, ramp, tunnel, culvert, causeway or similar infrastructure.” |
To find a bridge’s number, look it up on the restricted list, where each row starts with it, or on the RAV Mapping Tool: Drive Over Structures under Points of Interest shows every structure, and you can search by number (SPV information sheet). The BVS Audit Requirements (section 12) also point to Main Roads’ Structures Web App and Road Information Mapping System. On a BVS permit, the operating conditions name the bridges that need video, one by one or as a range, such as all bridges within a region (BVS commonly asked questions, April 2018, question 6). Number formats vary: the BVS page writes #977 where the Class 1 list writes 0977.
Default Bridge Crossing Conditions
Your permit’s conditions come first; the OSOM Single Trip Permits page says bridge crossing operating conditions are provided with the issued permit. These are the defaults in Main Roads’ standard documents.
| Rule | Applies to | Source |
|---|---|---|
| No more than 25 km/h, in the centre of the traffic lanes in your direction of travel, unless the permit sets a lower speed or another position for that bridge | Overmass RAVs on Single Trip OSOM permits | D19#696602, clauses 8.5.1 and 8.5.2 |
| On a bridge that isn’t restricted, the most centre part of the lane, or the centre of multiple lanes in your direction | Class 1 RAV Low Loader Overmass permits | D13#399261, clause 9.5.1 |
| At least 200 metres behind any other heavy vehicle on a bridge | Class 1 RAV Low Loader Overmass permits | D13#399261, clause 9.6 |
| At least 200 metres behind any other RAV on a bridge, despite the 100 metre convoy spacing | SPVs travelling in convoy | D15#400816, clauses 12.9.12 and 12.9.13 |
| No Metropolitan Area bridge in peak hours if you must cross in its centre | SPVs over statutory mass limits | D15#400816, clause 13.2.3 |
Main Roads’ Bridge Supervision Conditions video, linked from its BVS page, sets out a crossing under a permit’s bridge crossing conditions:
- As close as practicable to the centre of the bridge, unless otherwise specified for that bridge.
- All other traffic excluded from the bridge, unless otherwise specified for that bridge.
- No more than 10 km/h, or 5 km/h for a RAV with a platform trailer with more than 16 axles and/or more than 12 tyres per axle.
- At least two licensed pilots managing traffic.
- Video recorded under the BVS Audit Requirements.
That 5 km/h limit appears in the video’s description but in none of the written documents under Sources, so check your permit and ask HVS. The March 2026 SPV conditions (revision 5) removed the general 25 km/h and centre movement bridge rules for SPVs; follow what your permit sets.
Central movement over bridges on Great Eastern Highway between Roe Highway (Midvale) and Yilgarn Avenue (Northam) needs at least three pilot vehicles, and on Tonkin Highway north of Roe Highway at least two follow to manage traffic from the rear (Single Trip OSOM clauses 13.7.4 and 13.7.7; SPV clauses 12.7.5 and 12.7.8). More in WA pilot and escort vehicle requirements.
Named Bridges With a Set Position
Main Roads’ BVS page links short videos for named bridges, each for a condition your permit can specify. The positions below are copied from the videos’ descriptions; watch the video before you cross. A general video covers divided carriageway bridges: central movement in the direction of travel only, with traffic in that direction excluded.
| Bridge | Number | Position or condition | Source |
|---|---|---|---|
| Stirling Bridge, Stirling Highway, East Fremantle | #0942 | Central movement in the direction of travel only, excluding traffic in the direction of travel, or in both directions under the other condition | 4 videos, northbound and southbound |
| Causeway East Flyover Bridge, Canning Highway over Albany Highway, Victoria Park | #0954 | As for Stirling Bridge | 4 videos, westbound and eastbound |
| Ewing Street Railway Bridge, Leach Highway, Welshpool | #977 | As close to the centre median as practicable | 2 videos, northbound and southbound |
| Bushmead Road Bridge over Roe Highway, Hazelmere | #1188 | Westbound: central movement in the direction of travel, within the marked lane. Eastbound: as close as possible to the footpath. Traffic excluded in both directions. | 2 videos, westbound and eastbound |
| Reid Highway Bridge over Mitchell Freeway, Balcatta | #1202 | Westbound: within the left hand traffic lane | 1 video, westbound |
| Port Bouvard Bridge, Dawesville | #1224 | As for Stirling Bridge | 2 videos |
| Ord Diversion Dam, Victoria Highway, Kununurra | #1242 | As close as possible to the southern kerb. Over 3.5 metres wide, notify the Water Corporation Dam’s Controller at least 24 hours before crossing. | 1 video; D19#696602, clause 6.4 |
When Bridge Video Supervision (BVS) Is Added
Main Roads’ BVS page says BVS conditions are applied to permits when the route needs a bridge crossing and the combination’s mass means the crossing has to be video supervised. BVS lets operators cross without a Main Roads officer physically supervising (BVS Audit Requirements, section 1; BVS questions, question 1). The BVS questions (question 2) list four permits that can carry it, the Bridge Crossing Permit among them.
Height can add it too: where a load can’t keep a 300 mm safety buffer under a structure such as a bridge, the Oversize Vehicle Route Survey Audit Regime (clause 2.4) says to state that in the Oversize Permit application, and additional BVS conditions are then applied.
Where BVS is on the permit, the Single Trip OSOM and SPV conditions (clauses 8.5.3 and 6.4.2) point to the BVS Audit Requirements. Section 6 asks for a driver statement before each day’s travel, a wait for the lead pilot to confirm the bridge is secured, continuous recording from the approach until the combination is fully clear, and no more than 10 km/h until it’s clear or the rear pilot says so. BVS needs at least two licensed pilots, and more where two can’t control approaching traffic in every direction (BVS questions 7-9; that April 2018 document says “accredited and authorised” pilots). The operator keeps each recording for at least 12 months from the permit’s expiry and enters every BVS permit in Main Roads’ BVS Register Template, used or not (section 4, items 9 and 19).
More in Main Roads WA video recording requirements compared and Bridge Video Supervision (BVS) for Main Roads WA.
What MapTrack Does and Doesn’t Do
MapTrack is an asset management platform that also supplies AI dash cams. It’s the platform behind 600,000+ assets tracked since 2012.
Running AI dash cams in MapTrack? Account owners can request footage from a trip, with faces and number plates blurred. Blur is an option on each request. Camera footage and safety events are shown to account owners. See video telematics for how footage requests work.
- Keep each permit and its operating conditions on the truck’s record as files.
- Put the camera check and the BVS training sign-off on a phone as forms, with photos and a drawn signature.
- Track each permit’s expiry and keep-until dates in the free BVS records log. It sits beside Main Roads’ BVS Register, never instead of it.
- Keep the BVS procedures, roles and training sign-offs in the free Bridge Video Supervision training register.
Where it stops:
- It isn’t a Main Roads approval, and nothing on this page is endorsed by Main Roads.
- Keep the camera’s original recordings for at least 12 months after the permit expires. Don’t use a requested clip as your BVS record unless you’ve checked it has the date, time, speed and audio and is in its original, compatible format.
- A request can’t replace a crossing that wasn’t recorded.
- Permit applications, route checks, and the speed, position and pilots on the day are still on the operator and the driver.
Forwarding this to whoever signs off on permits? The tables and Sources are Main Roads’ own documents, and a demo is 30 minutes on Microsoft Teams.
Sources
Every rule here comes from these Main Roads WA documents and pages, checked on 25 November 2026.
- Class 1 RAV Low Loader Overmass Period Permit Operating Conditions, D13#399261, revision 11, July 2026.
- Single Trip OSOM Vehicle Standard Operating Conditions, D19#696602, revision 27, June 2026.
- Special Purpose Vehicle Standard Operating Conditions, D15#400816, revision 5, March 2026, and the Special Purpose Vehicle (SPV) Permits Operator Information Sheet, D25#1127968, June 2026.
- Guidelines: How to Complete a Specified Journey (Single Trip) Permit Application, D25#54014, January 2025.
- Bridge Crossing Permit Application form (no document number; file dated 4 June 2025) and the Special Purpose Vehicle Bridge Crossing Permit Application form (no document number; file dated 9 September 2024).
- Restricted Structures lists: Class 1 RAV Low Loader Overmass, D20#609225, 17 November 2026; 2, 3 and 4 Axle Special Purpose Vehicles, D20#609223, and All Terrain Special Purpose Vehicles, D20#609224, both 11 March 2025.
- Bridge Video Supervision Audit Requirements, D20#357426, version 1, June 2020, and the BVS commonly asked questions, D18#303618, April 2018.
- Oversize Vehicle Route Survey Audit Regime, D19#691324, revision 3, August 2025.
- Web pages, fetched 25 Nov 2026: Oversize Overmass (OSOM) Single Trip Permits, Oversize Overmass (OSOM) Period Permits, Special Purpose Vehicle (SPV) and Bridge Video Supervision (BVS), plus Main Roads WA’s bridge supervision videos on its YouTube channel (published September 2023, linked from the BVS page).
This guide summarises Main Roads WA’s documents as of November 2026, and your permit and Main Roads’ current documents govern.
