The Main Roads WA Greenmount Hill permit checklist item by item, with the evidence, cameras and time bans, compared with Roelands and Bindoon.

The 36.5 metre Greenmount Hill Access Permit is the Main Roads WA permit that gives 36.5 metre A-Doubles and B-Triples specific access to Great Eastern Highway between the Northam Road Train Assembly Area and Roe Highway, Midvale. Applicants must meet every item on its eligibility checklist (D21#776458, 11 December 2024) and send the evidence with the application.

This guide sets out that checklist item by item and compares the other two hill permits on Main Roads’ Specific Access Permits page: the 36.5 metre Roelands Hill Permit and the temporary 53.5 metre Bindoon Hill Special Assistance Permit. All three are for Restricted Access Vehicle (RAV) combinations and ask for cameras on the prime mover.

The Three Hill Permits Compared

‘Not listed’ means the item isn’t on that permit’s checklist. ABS is an Antilock Braking System, EBS an Electronic Braking System, TEBS a Trailer Electronic Braking System, RSS a Rollover Stability System, CAN a Controller Area Network, ADR an Australian Design Rule, and HVS is Main Roads Heavy Vehicle Services.

RequirementGreenmount (36.5 m)Roelands (36.5 m)Bindoon (53.5 m)
CombinationsA-Doubles and B-TriplesCategory 7 AB-Triples and BA-TriplesTriple Road Trains
OperatorRegisteredRegisteredWA Heavy Vehicle Accredited
Load not contestable with railYesNot listedNot listed
Driver experience and National Police Clearance3 years in road trainsNot listed3 years in 53.5 m road trains
EngineADR 80/03 (Euro 5)Not listedADR 80/03 (Euro 5), at least 550 hp
Prime mover brakesABS or EBS, with a CAN / TEBS brake signalABS or EBSABS or EBS, with a CAN / TEBS brake signal
Trailer brakesTEBS, RSS and CANTEBS and RSSTEBS, RSS and CAN
Auxiliary braking systemPrime moversAll vehiclesPrime movers
Fatigue and distraction monitoringYesNot listedYes
Telematics unit with HVS accessPrime moversAll vehiclesPrime movers
Weekly brake-check and 40 km/h reportsYesYesNot listed
Cameras on the prime moverForward and rearForward and rearForward
Roll-coupled drawbar couplingNot listedBA-TriplesNot listed

Greenmount and Bindoon each have nine checklist items. Roelands has six.

The Greenmount Hill Checklist and the Evidence to Send

The 36.5 metre Greenmount Hill Access Permit Eligibility and Supporting Evidence Checklist lists nine pre-permit requirements, each with the evidence to attach.

ItemWhat the checklist asks forEvidence to send
LoadMoving the load by road must not be contestable with rail. Main Roads checks this with the Department of Transport when assessing the application.Written details of the transport task: origin, destination and the specific products carried. An issued permit lists the products.
DriversAt least 3 years’ experience driving road trains and a good driving record, with no serious traffic convictions. The operator keeps reporting driving convictions once a driver is on the permit.A National Police Clearance for each nominated driver, and the operator’s written confirmation of each one’s 3 years’ road train experience. An issued permit names the drivers.
Prime mover brakesABS or EBS, supplying a CAN / TEBS brake application signal.Written confirmation from the vehicle manufacturer.
Semi-trailer brakesTEBS with a fully functional RSS, and a compatible CAN bus connection linking all semi-trailers.Written confirmation from the trailer manufacturer.
EngineThe emission standards in the Vehicle Standard (Australian Design Rule 80/03 - Emission Control for Heavy Vehicles) 2006, equivalent to Euro 5.Written confirmation from the prime mover manufacturer or dealer.
Fatigue and distractionA driver fatigue and distraction monitoring system in the prime movers, with appropriate governance in place so events are managed effectively.Photos of the system fitted, with equipment details; the service provider who monitors it; and your company’s policy for managing events.
TelematicsAn in-vehicle telematics unit in the prime movers, with direct HVS access to the monitoring system. The telematics service provider must send weekly reports showing all vehicles stop in the mandatory stopping bay at the top of Greenmount Hill to check brakes and descend at no more than 40 km/h.Login details to the monitoring system for HVS, and your nominated service provider’s written confirmation that all prime movers have a unit and that it provides the weekly report.
Auxiliary brakesAn auxiliary braking system on the prime movers, used when descending the hill. Drivers must be familiar with operating it, with training records provided to HVS.The vehicle manufacturer’s written confirmation of the type fitted, plus training records and Standard Operating Procedures showing drivers are trained on it.
CamerasAt least one forward-facing and one rear-facing camera on the prime mover, operating to the RAV Video Recording Requirements, with the rear-facing camera on the driver’s side.Photos clearly showing the vehicle registration and the installed cameras, or written confirmation from the independent installer.

Tick ‘Evidence attached’ on each row (the ‘Qualified’ column is for office use) and send the checklist with the application form, which also asks for:

  • Your Operator Number. You must be a registered operator with Main Roads WA, and every prime mover on the application must be registered with Main Roads.
  • Your telematics provider, from its ‘certified Service Provider’ drop-down list.
  • A permit period of 12 or 36 months. Check the current fee on the Specific Access Permits page.

Email the completed form to hvsnetworkaccess@mainroads.wa.gov.au.

Lining up a hill permit? See fatigue and distraction events, footage requests and permit files in MapTrack.

Book a demo

30 minutes on Microsoft Teams

What Cameras Each Hill Permit Needs

Greenmount and Roelands need a forward-facing and a rear-facing camera on the prime mover, with the rear camera on the driver’s side. Bindoon needs at least one forward-facing camera. Greenmount and Bindoon cameras must operate to the Restricted Access Vehicle Video Recording Requirements (D20#190415, 24 August 2021). Roelands names no standard, but says its cameras help Main Roads identify the cause of any incident.

Those requirements cover:

  • Forward camera (3.1): mounted inside or on the front of the vehicle, as close as practical to its horizontal centreline, with a clear view of the path in front.
  • Rear camera (3.2): mounted at the front of the vehicle on the driver’s side, with a clear view of the rear trailers and behind the combination.
  • Both: mounted to meet regulation 263 of the Road Traffic Code 2000, so drivers keep uninterrupted and undistracted views.
  • Picture (3.3): high definition, at least 1080p.
  • Before the vehicle goes onto the public road (4): the camera’s in good working order, recording, able to record continuously whenever the vehicle is on the road, and showing the correct time and date.

For how these rules sit beside Bridge Video Supervision (BVS), pilot vehicle and traffic management video, see Main Roads WA video recording requirements compared.

How the Roelands and Bindoon Permits Differ

The Roelands checklist (D21#135723, 16 October 2023) covers 36.5 metre Category 7 tandem drive AB-Triples and BA-Triples with a tri axle dolly and tri axle trailers, going down Roelands Hill on Coalfields Highway. It has no rail, driver, engine or fatigue item, but adds a roll-coupled drawbar for BA-Triples.

ItemWhat the checklist asks forEvidence to send
Roll-coupled drawbarBA-Triples need a roll-coupled drawbar coupling connection between the middle trailer and the rear dog trailer, with no more than ±2° of lash (maximum 4° total lash).Continuous video clearly showing the middle trailer and rear registrations and the coupling, and the trailer or roll coupling manufacturer’s written confirmation of the lash.
TelematicsAn in-vehicle telematics unit in all vehicles, with direct HVS access to the monitoring system. The telematics service provider must send weekly reports showing all vehicles stop in the mandatory stopping bay at the top of Roelands Hill to check brakes and descend at no more than 40 km/h.Login details to the monitoring system for HVS, and your nominated service provider’s written confirmation that all vehicles have a unit and that it can provide the report.
Auxiliary brakesAn auxiliary braking system on all vehicles, used when descending Roelands Hill. Drivers must be familiar with operating it.The vehicle manufacturer’s written confirmation of the type fitted, plus training records or Standard Operating Procedures showing drivers are trained on it.
Prime mover brakesABS or EBS.Written confirmation from the vehicle manufacturer.
Trailer brakesTEBS with RSS.Written confirmation from the trailer manufacturer.
CamerasOne forward-facing and one rear-facing camera on the prime mover, with the rear-facing camera on the driver’s side.Photos clearly showing the vehicle registration and the installed cameras, or written confirmation from the independent installer.

The Bindoon checklist (D26#442283, April 2026) is for WA Heavy Vehicle Accredited Operators running 53.5 metre Triple Road Trains on Great Northern Highway between Muchea and Wubin. It drops the rail item, the rear camera and the weekly reports, adds a minimum engine power, and repeats several Greenmount items word for word.

ItemWhat the checklist asks forEvidence to send
EngineADR 80/03 emission standards, equivalent to Euro 5.Written confirmation from the prime mover manufacturer or dealer.
Engine powerAt least 550 hp.Written confirmation from the prime mover manufacturer or dealer.
Prime mover brakesABS or EBS, supplying a CAN / TEBS brake application signal.Written confirmation from the vehicle manufacturer.
Semi-trailer brakesTEBS with a fully functional RSS, and a compatible CAN bus connection linking all semi-trailers.Written confirmation from the trailer manufacturer. An issued permit lists the trailers.
Fatigue and distractionAs for Greenmount.As for Greenmount.
TelematicsA unit in the prime movers, with direct HVS access to the monitoring system to view speed and position records. No weekly report is listed.Login details to the monitoring system for HVS, and your nominated service provider’s written confirmation that all prime movers have a unit and a login set up.
Auxiliary brakesAs for Greenmount.As for Greenmount.
DriversAt least 3 years’ experience driving 53.5 m road trains. Otherwise as for Greenmount.As for Greenmount: a National Police Clearance for each nominated driver and the operator’s written confirmation. An issued permit names the drivers.
CameraAt least one forward-facing camera on the prime mover, operating to the RAV Video Recording Requirements.Photos clearly showing the vehicle registration and the installed camera, or written confirmation from the independent installer.

Send each checklist with its own form: the Roelands application form or the Bindoon application form.

When and Where the Permits Let You Travel

Main Roads’ Specific Access Permits page sets where each permit applies. Its only time limit is Greenmount’s westbound ban. Your permit’s own conditions apply too.

PermitWhereTime limits on Main Roads’ pagePermit period
GreenmountGreat Eastern Highway between the Northam Road Train Assembly Area and Roe Highway, MidvaleNo westbound travel on Greenmount Hill 6:00am-10:00am or 2:00pm-8:00pm12 or 36 months
RoelandsDown Roelands Hill on Coalfields HighwayNone listed12 or 36 months
BindoonGreat Northern Highway between Wubin and MucheaNone listedTemporary: every permit issued expires on 31 December 2026
  • Greenmount time ban: no westbound travel on Greenmount Hill is permitted between 6:00am and 10:00am, and between 2:00pm and 8:00pm. Westbound, that leaves 10:00am to 2:00pm and 8:00pm to 6:00am. The page lists no eastbound time ban.
  • Left-hand lane: on the Greenmount permit, RAVs must travel in the left-hand lane at all times, unless avoiding an obstruction, obeying a traffic-control signal, or moving into another lane first because that’s needed to turn off the carriageway safely.
  • Mass: all three allow up to Accredited Mass Management Scheme (AMMS) Level 3 mass limits. Roelands and Bindoon must be used with a valid AMMS Permit when operating at AMMS mass limits. Greenmount may be used with a valid AMMS Period Permit.

Bridges on the route are a separate question: see WA bridge crossing permits and restricted bridges.

How Long Footage Is Kept and What Main Roads Can Ask For

The transport operator or permit holder is responsible for the camera, the recordings and handing them over (section 2 of the RAV Video Recording Requirements).

  • Keeping it (5.1): every recording, for at least 30 days from the date the journey ended.
  • Format (5.2): available for audit in a format compatible with standard Microsoft Windows applications.
  • Audits (6.1 to 6.3): on-road compliance audits, periodic random audits, and triggered audits when Main Roads has reason to believe an operator hasn’t followed the requirements or an on-road incident has occurred.
  • Handing it over (6.4): in a random or triggered audit, the requested recordings, unedited, within the timeframe in the request.
  • Non-compliance (7): Main Roads has the discretion to issue an infringement or start court proceedings, or to suspend the issue of any permits subject to video requirements.

Telematics data goes to Main Roads too: all three application forms say HVS receives reports from your nominated service provider with vehicle position, time and speed data against your permit conditions, and that Authorised Officers have access to the information you provide for compliance and enforcement purposes.

Bridge crossings and pilot vehicles have their own video rules: see Bridge Video Supervision (BVS) and WA pilot and escort vehicle requirements.

Where the Main Roads Documents Differ

The checklists and forms don’t always match.

  • Greenmount braking. The checklist asks for ABS or EBS plus a CAN / TEBS brake application signal. Item 3 on the form says ABS and EBS, with no signal.
  • Bindoon drivers. The checklist asks for 3 years driving 53.5 m road trains. Item 8 on the form says 3 years driving road trains.
  • Roelands telematics. The checklist puts a telematics unit in all vehicles. The form’s tick box says the prime mover.
  • Roelands video. Neither the Roelands checklist nor its form names the RAV Video Recording Requirements, which set the 1080p, recording and 30-day rules for the other two.
  • Training evidence. Greenmount and Bindoon ask for training records and Standard Operating Procedures. Roelands asks for either.
  • Telematics providers. The Greenmount and Roelands forms ask for a ‘certified’ provider without saying who certifies providers. The Bindoon form asks only for a ‘Service Provider’.

Where they differ, follow your permit, and ask Main Roads Heavy Vehicle Services (HVS) on 138 486 or at hvs@mainroads.wa.gov.au before you apply.

What MapTrack Does and Doesn’t Do

Using MapTrack isn’t a Main Roads approval. Main Roads sets these permit conditions and audits them, and nothing on this page is endorsed by Main Roads.

MapTrack is an asset management platform that also supplies AI dash cams. It’s the platform behind 600,000+ assets tracked since 2012. Here’s where it fits:

  • Fatigue and distraction. On MapTrack’s AI dash cams, driver monitoring (fatigue, distraction, phone use, seatbelt and smoking) needs a driver-facing camera and the Advanced plan. Each event opens in MapTrack with its clip, the trip, the speed and the place. Camera footage and safety events are shown to account owners.
  • Footage for an audit. Account owners can request footage from a trip, with faces and number plates blurred. Blur is an option on each request. An audit asks for unedited recordings, so keep the camera’s original recordings for at least 30 days from the end of the journey and send those.
  • Permit evidence. Keep each prime mover’s permit, manufacturer letters, camera photos and training records on its record as files, so the checklist evidence is in one place for your next application, and run the pre-trip camera check on a phone as a form, with photos and a drawn signature.

Not claimed here: a monitoring service for fatigue events, the weekly brake-check and 40 km/h reports, HVS login access to a telematics system, or a rear-facing camera on the driver’s side. The reports and the login come from your nominated telematics service provider. Check any camera, ours included, against the RAV Video Recording Requirements, and don’t rely on a time-lapse: the rules ask for continuous recording whenever the vehicle is on the road. See video telematics for how footage requests work.

Forwarding this to whoever signs off on the application? The checklist tables and Sources are Main Roads’ own documents, and a demo is 30 minutes on Microsoft Teams.

Sources

Every rule here comes from these Main Roads WA documents, each fetched on 25 November 2026.

This guide summarises Main Roads WA’s documents as of November 2026. Your permit and Main Roads’ current documents govern.

Applying for a hill permit? See it on your own trucks

Fatigue and distraction events, footage requests from a trip, and each prime mover’s permit files on its record in MapTrack.

  • No credit card required

About the author

Lachlan McRitchie

Lachlan McRitchie

Co-Founder & GM of Operations

Lachlan leads operations at MapTrack, bringing 10+ years of enterprise technology experience across mining, construction and heavy industry. Before MapTrack, he held senior roles at Workato (integration and automation) and AppDynamics/Cisco (application performance), working directly with ASX-listed organisations to modernise their technology stacks. His deep understanding of field operations and blue-collar workflows shapes how MapTrack solves real problems for asset-intensive teams.

View LinkedIn profile →

FAQ

What is the Greenmount Hill permit?

It’s the 36.5 metre Greenmount Hill Access Permit from Main Roads WA. It gives 36.5 metre A-Doubles and B-Triples specific access to Great Eastern Highway between the Northam Road Train Assembly Area and Roe Highway, Midvale, up to Accredited Mass Management Scheme (AMMS) Level 3 concessional mass limits. You apply with its eligibility checklist (D21#776458, December 2024) and evidence for every item.

What do I need to get a Greenmount Hill permit?

Main Roads’ checklist (D21#776458) has nine items: a load that isn’t contestable with rail, drivers with 3 years’ road train experience and a National Police Clearance, anti-lock or electronic braking on the prime mover, electronic braking with rollover stability on the semi-trailers, a Euro 5 equivalent engine, fatigue and distraction monitoring, telematics with Heavy Vehicle Services access and weekly reports, an auxiliary braking system, and forward and rear cameras.

What cameras do the hill permits need?

Greenmount and Roelands each need a forward-facing and a rear-facing camera on the prime mover, with the rear camera on the driver’s side. Bindoon needs at least one forward-facing camera. The Greenmount and Bindoon checklists apply Main Roads’ Restricted Access Vehicle Video Recording Requirements (D20#190415): at least 1080p, recording whenever the vehicle is on the road, with the correct time and date.

What are the Greenmount Hill time restrictions?

Main Roads’ Specific Access Permits page says no westbound travel on Greenmount Hill is permitted between 6:00am and 10:00am, and between 2:00pm and 8:00pm. Westbound, that leaves 10:00am to 2:00pm and 8:00pm to 6:00am. The page lists no eastbound time ban. Restricted Access Vehicles on the permit must also keep to the left-hand lane, with three exceptions, and your permit’s own conditions apply.

How long do we keep the camera footage?

At least 30 days from the date the journey ended, under section 5.1 of Main Roads’ Restricted Access Vehicle Video Recording Requirements (D20#190415). The transport operator keeps every recording, available for audit in a format compatible with standard Microsoft Windows applications. In a random or triggered audit, send the requested recordings unedited, within the timeframe in the request.

Do the hill permits need certified telematics?

None of the three checklists (D21#776458, D21#135723 and D26#442283) names a telematics certification. They ask for an in-vehicle telematics unit with direct Heavy Vehicle Services access, plus weekly brake-check and 40 km/h reports for Greenmount and Roelands. Those two application forms ask for a ‘certified’ service provider from a drop-down list without saying who certifies providers. The Bindoon form asks only for a ‘Service Provider’.

How is the Roelands Hill permit different from Greenmount?

The 36.5 metre Roelands Hill Permit checklist (D21#135723, October 2023) has six items, not nine. It covers AB-Triples and BA-Triples down Roelands Hill on Coalfields Highway, adds a roll-coupled drawbar coupling for BA-Triples, and puts telematics and an auxiliary braking system on all vehicles. It has no rail, driver experience, engine emission or fatigue monitoring item, but still needs forward and rear cameras.

Is the Bindoon Hill permit temporary?

Yes. Main Roads describes the 53.5 metre Bindoon Hill Special Assistance Permit as temporary, and every permit issued expires on 31 December 2026. It’s for WA Heavy Vehicle Accredited Operators running 53.5 metre Triple Road Trains on Great Northern Highway between Muchea and Wubin, with nine checklist items (D26#442283, April 2026), including at least one forward-facing camera.

Ready to get started?