Skip to main content
Skip to download form

Free confined space management plan template

Free confined space management plan template (PDF-ready). Site-wide AS 2865, OSHA 1910.146 and UK CSR 1997 policy and procedure document. Download free.

Download free PDF template

Use in MapTrack →
FreePDFUpdated Oct 2026

Get your free template

Enter your email to download the confined space management plan template as a free PDF. No sign-up required to use it.

G2 rating 4.9 out of 5
Source: G2.com, Inc.
Capterra rating 5.0 out of 5GetApp rating 5.0 out of 5Software Advice rating 5.0 out of 5
All MapTrack reviews

Upload the PDF and MapTrack drafts the form for you. Free trial, no credit card needed.

Your info is secure. No spam, ever.

These templates are free general guides provided as-is. They do not constitute legal, safety or compliance advice. You are responsible for ensuring any form meets your specific workplace obligations, industry standards and applicable regulations.

G2 rating 4.9 out of 5
Source: G2.com, Inc.
Capterra rating 5.0 out of 5GetApp rating 5.0 out of 5Software Advice rating 5.0 out of 5
All MapTrack reviews

Trusted by teams across Australia and New Zealand

We respect your privacy. Unsubscribe anytime.

Updated 26 Oct 2026

Confined Space Management Plan

Site-wide WHS management system document covering every confined space on site.

Live form
0 of 21 checks

Site & space register

1Site address and PCBU details confirmed
2Confined space register attached and current
3Each space classified (permit-required / non-permit)
4Responsible person named per space
5Per-space risk assessment and rescue plan linked

Roles & duties

6PCBU and site manager duties documented
7Confined space supervisor and permit issuer roles set
8Entrant standby person and attendant duties set
9Rescue team composition and competency documented
10Induction and refresher training cycle defined

Permit system & gas testing

11Standard entry permit form attached
12Permit issuance approval and close-out workflow
13Gas detector calibration and bump test cadence set
14Action levels and alarm setpoints documented
15Continuous vs spot monitoring rule defined

Rescue arrangements

16Rescue arrangement type (in-house / outsourced / 000)
17Response time and equipment list documented
18Rescue drill cadence and evaluation method set
19Contractor pre-qualification and bridging procedure
20Audit cycle KPI set and executive reporting cadence
21PCBU and accountable manager signatures

How to use: download the PDF, print or complete digitally on any device.

  • PDF format, ready to print or fill on screen
  • Use as-is or customise to suit your operation
  • Go digital in MapTrack for photos, reminders and audit trails

Or set it up in MapTrack

  • Fill it in on a phone, attach photos to any check
  • Automatic reports and audit trails
  • Upload the PDF and MapTrack drafts the form for you

Free trial. No credit card. Personal email accepted.

Don't just download it - use it live. Start a free workspace, upload this confined space management plan template and MapTrack drafts it as a form your crew can run from a phone.

Jarrod Milford

Jarrod Milford

Co-Founder & Commercial Director

Updated 26 October 2026

Short answer

A confined space management plan sets out how a site identifies, registers and controls every confined space: roles, competency, entry permits, gas testing, rescue arrangements, contractors and audits. PCBUs keep it as a controlled document, reviewed on a set cycle and after incidents or changes. Part 4.3 of the model WHS Regulations sets the confined space duties, including written entry permits under regulation 67.

Checked against Model WHS Regulations as at 5 December 2025 (cited within as the Work Health and Safety Regulations 2011) on by the MapTrack templates team. How we check templates

Key takeaways

  • The MapTrack confined space management plan template contains 21 checks across 4 sections. Sections covered: Site & space register, Roles & duties, Permit system & gas testing, Rescue arrangements.
  • Regulation 67 of the model WHS Regulations: no worker is directed into a confined space without a written entry permit completed by a competent person.
  • Regulation 74 requires first aid and rescue procedures to be set up and practised, and rescue equipment kept in good working order.
  • Keep each risk assessment 28 days after the work and each permit until the work ends, or 2 years after a notifiable incident (reg 77).
  • In the US, 1910.146(c)(4) requires a written permit space program before employees enter, and 1910.146(d)(14) a review within a year after each entry.
  • A yearly site review can supplement required reviews; review sooner after an incident, a new space or changed rescue arrangements.

Enter your email below to download this confined space management plan template as a ready-to-use PDF.

Used by construction, mining and field service teams

Saunders InternationalMineral ResourcesSupagasHacer GroupMetro TunnelUltrabuilt

What is a confined space management plan template?

A confined space management plan is the strategic site-wide policy and procedure document that governs every confined space on a property. It sits above any individual entry permit or per-space risk assessment and defines how the duty holder identifies registers controls and manages confined spaces across the entire site, who holds each role, what competency is required, how rescue is arranged and how the program is audited. The plan is the upstream governance document that shows how an organisation meets the confined space requirements in WHS Regulations 2011 Chapter 4 Part 4.3 (confined spaces), AS 2865-2009 (Confined spaces - clauses 2.1 and 2.2 management responsibilities), Safe Work Australia Code of Practice on Confined Spaces, OSHA 29 CFR 1910.146 (Permit-required confined spaces - paragraph (c) employer duties, including a written permit space program where employees enter permit spaces) and UK Confined Spaces Regulations 1997 with HSE L101 Approved Code of Practice.

The management plan is distinct from a per-space risk assessment (which scores hazards for one space) and from a confined space entry permit (which authorises one specific entry). The plan covers every confined space on the site at portfolio level: it carries the confined space register, the classification of each space, the responsible person network, the entry permit issuance procedure, the atmospheric monitoring regime, the rescue capability standards (in-house team or outsourced rescue service), the training and competency framework, the contractor management requirements, the change-control rules for new or modified spaces and the audit cycle. Major-project HSE managers, facilities owners and PCBUs at processing plants, water utilities, mining sites, marine yards, construction principals and council depots commission a confined space management plan as the foundation document under their WHS management system, then attach individual space risk assessments rescue plans and permits beneath it. Without the management plan the duty holder has no single document showing an Australian regulator how it meets the confined space duties in Part 4.3 of the WHS Regulations (the risk assessment under regulation 66, entry permits under regulation 67 and training under regulation 76), or showing OSHA the written permit space program 1910.146(c)(4) requires, and individual permits issued downstream lack the governance framework regulators expect to see during an investigation.

Learn more about compliance and inspections in MapTrack.

Get the free template

Enter your email above to download the full confined space management plan template as a PDF.

Benefits of using this confined space management plan template

  • Site-wide governance: a documented plan satisfies the WHS Regulations 2011 Chapter 4 Part 4.3 and OSHA 1910.146(c)(4) requirement for a written confined space program that covers every space on the site not just the one being entered today.
  • Confined space register: a controlled inventory of every confined space classification and responsible person prevents the recurring failure mode where a space is entered for years without being formally identified as confined.
  • Role and competency clarity: defined duties for the PCBU site manager confined space supervisor entrant standby person rescue team and permit issuer satisfies AS 2865 clause 2.2 and OSHA 1910.146(g) training requirements.
  • Rescue capability standard: the plan documents whether the rescue arrangement is in-house team outsourced service or local emergency service and sets the response time training and equipment standard rescuers must meet under AS 2865 and OSHA 1910.146(k).
  • Contractor management: a written contractor section ensures visiting contractors operate to the host site standard not their own which is the most common gap regulators find after a contractor confined space fatality.
  • Audit and continuous improvement: a fixed review cycle and KPI set (permits issued atmospheric anomalies near-misses rescue drills competency currency) makes the program visible to the executive and defensible to a regulator.

Benefits of digitising forms in MapTrack

When you move your plans from paper to MapTrack, you get:

  • Field users can easily scan a QR code to complete a form on mobile. Unlimited users.
  • Email the right people when a form is submitted, with an automation you set up.
  • File every completed form against the asset, location or person it covers.
  • Download any completed form as a PDF, with failed answers listed at the top.
  • Fill in forms offline; they upload when the device is back online.
  • Build conditional logic (show or hide questions based on answers).
  • Take pictures or attach photos. Not possible with a paper-based form.
  • Electronic signatures.
  • Edit forms later without reprinting.
  • Set who can view, fill in or edit forms with user roles.
  • Upload a paper form (PDF, Word, Excel or a photo) and MapTrack's AI builds a digital version for you to check.
  • Email safety managers when a hazard report is submitted, with an automation you set up.
  • Keep every hazard and incident report against the site it came from, with photos.
  • Turn a hazard report into a corrective-action work order with its own review step.

Book a demo to see how MapTrack handles plans.

Try MapTrack free

Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.

  • No credit card required

1-2 days/week saved

“Bloody amazing! We used to spend 1-2 days a week tracking and managing our generators alone.”
Saunders International

Steve McAllister

Asset Coordinator, Saunders International

What to include in a confined space management plan template

This confined space management plan template covers 10 key areas:

  • Plan ownership and scope: site or portfolio name address PCBU details document owner version control validity period and the buildings or assets covered.
  • Confined space register: a controlled list of every confined space on site with unique ID classification entry frequency typical hazards responsible person and the latest risk assessment and rescue plan attached.
  • Definitions and classification: written definitions of confined space versus enclosed work area aligned to AS 2865 clause 1.5 and OSHA 1910.146 paragraph (b) plus the classification system (permit-required versus non-permit) used on site.
  • Roles and responsibilities: PCBU site manager confined space supervisor permit issuer entrant standby person attendant entry rescue team and contractor representative with reporting lines and decision authority.
  • Competency and training framework: induction content refresher cycle rescue drill cadence assessment method record retention period and the qualifications expected of each role under AS 2865 and OSHA 1910.146(g).
  • Entry permit system: how permits are raised approved monitored closed out and audited the standard permit form the maximum permit duration the renewal rules and the integration with hot work LOTO and isolation permits.
  • Atmospheric monitoring regime: gas detector standards calibration cadence bump test rules action levels alarm setpoints continuous versus spot monitoring and the data retention requirement.
  • Rescue arrangement: in-house team or outsourced service contact details response time equipment list training currency drill cadence and the formal evaluation method required under OSHA 1910.146(k).
  • Contractor management: pre-qualification competency verification site induction rescue arrangement bridging document and the audit cadence for visiting contractor work.
  • Change control and audit: how new spaces are identified and added to the register how modifications are managed the audit cycle for the plan and the KPI set reported to the executive and the WHS committee.

How to use this confined space management plan template

  1. Map every confined space on the site and build the controlled register: walk the property with the facilities asset and process teams identify every space that meets the AS 2865 or OSHA 1910.146 definition assign a unique confined space ID classify each space (permit-required or non-permit) and capture entry frequency typical hazards responsible person and link to its current risk assessment and rescue plan.
  2. Define roles competencies and the training and drill program: document the PCBU site manager confined space supervisor permit issuer entrant standby person attendant entry rescue team and contractor responsibilities the qualifications expected of each role the induction and refresher cycle and the rescue drill cadence (minimum annual per OSHA 1910.146(k) plus realistic-scenario drills).
  3. Build the entry permit and atmospheric monitoring procedure: write the standard permit form the issuance approval monitoring close-out and audit workflow define the gas detector calibration and bump test rules set the action levels and alarm setpoints set the continuous versus spot monitoring rule and define how permit hot work LOTO and isolation interact when overlapping.
  4. Document the rescue capability standard and contractor management framework: decide whether rescue is in-house outsourced or relies on local emergency service set the response time training equipment drill and evaluation requirements per OSHA 1910.146(k) write the contractor pre-qualification site induction and bridging document procedure and define how the host site verifies contractor competency on arrival.
  5. Define change control audit cycle KPIs and sign off: write the procedure for adding new spaces or recording modifications set the plan review cycle (typically annual) and the trigger criteria for interim review define the KPI set reported to the executive (permits issued atmospheric anomalies near-misses rescue drill performance training currency) and have the PCBU and senior accountable manager sign the plan.

In MapTrack, you can digitise safety inspections and compliance forms. Each submission is stored as a timestamped PDF against the asset record.

Get the free templateEnter your email above to download the full confined space management plan template as a PDF.Back to download form

How often should you complete this plan?

The confined space management plan is a controlled WHS management system document with a fixed review cycle plus event-driven triggers. This template reviews the plan at least annually. The Safe Work Australia Code of Practice: Confined spaces sets no fixed interval, but says control measures should be regularly reviewed, and regulation 38 sets when a review must happen. OSHA 1910.146(d)(14) requires the permit space program to be reviewed, using cancelled permits, within one year after each entry, and 1910.146(d)(13) requires entry operations to be reviewed when there is reason to believe the program may not protect employees, for example after an unauthorised entry, a change in the use of a space or a near-miss. The UK HSE L101 Approved Code expects review when work content premises or arrangements change. Event-driven triggers include a confirmed or near-miss confined space incident regulator notice atmospheric anomaly above action level introduction of a new confined space on site change in rescue arrangement change in legislation or standard and any change in the people holding key roles. Material modification of a confined space (size shape ventilation contents access) also triggers a plan review even if the per-space risk assessment is current. Major-project HSE managers typically schedule the annual review against the WHS committee calendar and the rescue drill so the plan refresh draws on real performance data. In MapTrack the plan is attached at site level and linked to every confined space asset record so the next review and the rescue drill due date are scheduled automatically.

Try MapTrack free

Full access to every feature. No credit card required. Per-asset pricing so you scale as your fleet grows.

  • No credit card required

Frequently asked questions

Is a written confined space management plan legally required?

Yes. WHS Regulations 2011 Chapter 4 Part 4.3 requires the PCBU to manage confined space risks and Safe Work Australia Code of Practice for Confined Spaces expects a written program of management. AS 2865-2009 clauses 2.1 and 2.2 set the management responsibilities and the program elements. OSHA 29 CFR 1910.146(c)(4) explicitly requires employers in the US to develop and implement a written permit-required confined space program before any entry. UK Confined Spaces Regulations 1997 and HSE L101 Approved Code of Practice impose equivalent duties on the duty holder. Without a written plan the duty holder cannot demonstrate to a regulator that the program exists as a system rather than ad-hoc permit issuance.

How is the management plan different from a risk assessment or entry permit?

The management plan is the site-wide governance document covering every confined space on the property the roles competencies rescue capability and audit cycle. A confined space risk assessment scores the hazards for one specific space against AS 2865 Appendix B. A confined space entry permit is the per-task authorisation issued at the start of a single entry. The plan is the policy the assessment is the analysis and the permit is the authorisation. The plan sits at site level the assessment at space level and the permit at entry level. A site needs all three together; one does not replace another.

What rescue capability standard must the plan describe?

AS 2865 and OSHA 1910.146(k) both require the duty holder to ensure a rescue capability is in place before entry. The plan must document the chosen arrangement: in-house rescue team outsourced rescue service or reliance on local emergency service. For each arrangement the plan records the response time the equipment available the training currency of rescuers the drill cadence and the formal evaluation method. OSHA 1910.146(k)(1) requires the employer to evaluate a prospective rescuer or rescue service for timely response and proficiency before selecting it. Relying on local 000 or 911 emergency response is acceptable only where the service has been specifically informed of the confined spaces and the response time is documented as adequate.

Who should write and sign the confined space management plan?

The plan is owned by the PCBU at site level under section 19 of the WHS Act 2011 and is typically authored by a competent person such as a chartered WHS practitioner, major-project HSE manager, confined space specialist or industrial hygienist. The senior accountable manager (general manager, facility manager or operations director) signs the plan to confirm the program is funded and supported. The confined space supervisor, permit issuer and contractor representatives are consulted under WHS Act 2011 Section 47 because they operate the plan in the field. The plan is reviewed and signed at least annually plus event-driven triggers.

What KPIs should the plan report?

A defensible plan reports a balanced KPI set to the WHS committee and the executive including number of permits issued by space and by activity number of atmospheric anomalies recorded number of near-misses and incidents rescue drill performance against scenario competency currency for entrant standby person and rescue team contractor entries audited and any non-conformance raised during internal audit. Trend analysis across the register often reveals which spaces drive most of the entry volume which in turn supports investment decisions in permanent ventilation engineering controls or elimination of entry by remote inspection technology.

Applicable regulatory standards

This template is a starting point. Check the current requirements that apply to your equipment, work and location. The template alone does not establish compliance.

  • Model Work Health and Safety Regulations

    Edition: Model WHS Regulations as at 5 December 2025 (cited within as the Work Health and Safety Regulations 2011)

    Confined space duties: entry permits, emergency procedures, worker training and its 2-year record, and keeping assessments and permits. Model law: check your state's version.

    • Part 4.3: Confined spaces: entry permits, signage, atmosphere controls, communication, emergency procedures and record keeping.
    • reg 67: A PCBU must not direct a worker into a confined space without a written entry permit, completed by a competent person, naming the space, entrants, period and controls.
    • reg 74: Confined space emergency procedures, including rescue and first aid, must be in place and practised.
    • reg 77: Keep the confined space risk assessment for 28 days after the work and the permit until the work ends, or 2 years after a notifiable incident.
    • reg 76(1): Workers who could enter, work in or support confined space work, and their supervisors, must get information, training and instruction on hazards, controls, PPE, permits and emergency procedures.
    • reg 76(2): A record of all confined space training given to a worker under reg 76 must be kept for 2 years.

    Safe Work Australia (drafted by the Parliamentary Counsel's Committee)

  • Confined spaces

    Edition: AS/NZS 2865:2009 (incl. Amd 1:2025)

    Planning to manage confined spaces, training records, emergency response planning and document control, the plan's core sections.

    • 2.1: Planning to manage and control confined spaces.
    • 2.6: Training and competency for confined space work, including records of training.
    • 2.8: Confined space emergency response planning, response and procedures.
    • 2.9: Documentation, document control and record keeping for confined space work.

    Standards AustraliaSold by the publisher

  • Model Code of Practice: Confined spaces

    Edition: November 2024 version

    Model Code guidance on managing confined space risks. It has legal effect only where a jurisdiction has approved it.

    Safe Work Australia

  • 29 CFR Part 1910, Occupational Safety and Health Standards

    Edition: Current eCFR text, up to date as of 2026-10-22 (read 2026-10-26)

    US general industry: written permit space program where employees enter, its contents and review, and rescue services.

    • 1910.146(c): General requirements: evaluate the workplace for permit spaces, warn employees, and develop a written programme if employees will enter.
    • 1910.146(d): Sets what the permit space programme must include, from acceptable entry conditions and testing to attendants, rescue and review.
    • 1910.146(k): Rescue and emergency services: evaluating and preparing designated rescuers, and retrieval systems for entrants.

    US Occupational Safety and Health Administration (text via eCFR)

  • The Confined Spaces Regulations 1997

    Edition: Current revised version as at 2026-10-26 (legislation.gov.uk)

    Great Britain: avoid entry where possible, use a safe system of work, and arrange rescue before anyone enters.

    • reg 4: Restricts entry to confined spaces where avoidable and requires a safe system of work otherwise.
    • reg 5: Requires suitable and sufficient emergency and rescue arrangements before anyone enters a confined space.

    legislation.gov.uk (The National Archives)

  • Safe work in confined spaces. Confined Spaces Regulations 1997. Approved Code of Practice, Regulations and guidance

    Edition: L101, 3rd edition (December 2014)

    HSE Approved Code of Practice and guidance for the Confined Spaces Regulations 1997.

    Health and Safety Executive (HSE)

Each source was read at its publisher and the page checked on 26 October 2026. The publisher's current text is the authority.

Confined space management plan template preview

Confined space management plan template template preview showing fields and layout

The numbers behind this confined space management plan template

The pages below gather the figures behind this kind of check. Each figure on them carries its source and date, so you can quote it in a toolbox talk, a budget case or a board paper without chasing the original report.

Get the free template

Enter your email above to download the full confined space management plan template as a PDF.

Embed this free template on your website

Run an industry blog, trade association site, or training resource? Drop a preview of this free confined space management plan template straight into your page. The snippet is self-contained, needs no scripts, and links readers back to the full free template.

<div style="max-width:480px;font-family:system-ui,-apple-system,'Segoe UI',Roboto,sans-serif;border:1px solid #E5E7EB;border-radius:12px;padding:20px;background:#ffffff;">
  <p style="font-size:12px;font-weight:700;letter-spacing:0.05em;text-transform:uppercase;color:#071D49;margin:0;">Free template</p>
  <p style="font-size:18px;font-weight:700;color:#071D49;margin:6px 0 0;">Confined space management plan template</p>
  <ul style="margin:12px 0 0;padding-left:18px;color:#374151;font-size:14px;line-height:1.6;">
    <li style="margin:4px 0;">Plan ownership and scope: site or portfolio name address PCBU details document owner version control validity period and the buildings or assets covered.</li>
    <li style="margin:4px 0;">Confined space register: a controlled list of every confined space on site with unique ID classification entry frequency typical hazards responsible person and the latest risk assessment and rescue plan attached.</li>
    <li style="margin:4px 0;">Definitions and classification: written definitions of confined space versus enclosed work area aligned to AS 2865 clause 1.5 and OSHA 1910.146 paragraph (b) plus the classification system (permit-required versus non-permit) used on site.</li>
    <li style="margin:4px 0;">Roles and responsibilities: PCBU site manager confined space supervisor permit issuer entrant standby person attendant entry rescue team and contractor representative with reporting lines and decision authority.</li>
    <li style="margin:4px 0;">Competency and training framework: induction content refresher cycle rescue drill cadence assessment method record retention period and the qualifications expected of each role under AS 2865 and OSHA 1910.146(g).</li>
    <li style="margin:4px 0;">Entry permit system: how permits are raised approved monitored closed out and audited the standard permit form the maximum permit duration the renewal rules and the integration with hot work LOTO and isolation permits.</li>
  </ul>
  <p style="font-size:13px;color:#6B7280;margin:14px 0 0;padding-top:12px;border-top:1px solid #E5E7EB;">Free <a href="https://www.maptrack.com/templates/confined-space-management-plan-template" style="color:#071D49;font-weight:600;text-decoration:none;">Confined space management plan template</a> by MapTrack</p>
</div>

Free to reuse, including commercially. This template is published under a Creative Commons Attribution 4.0 licence. Copy it, adapt it, put it on your own site or in your own docs. All we ask is that you credit MapTrack with a link back to this page. The snippet above already includes that credit, so if you use it as-is you’re covered.

Cite this template

Writing about this topic? You’re welcome to quote this checklist. Here’s the wording to use so your readers can find the original.

The MapTrack confined space management plan template contains 21 checks across 4 sections.

Short attribution
MapTrack Confined space management plan template, https://www.maptrack.com/templates/confined-space-management-plan-template
Reference list
MapTrack. (2026). Confined space management plan template [Checklist template]. Retrieved from https://www.maptrack.com/templates/confined-space-management-plan-template

Free to reuse with credit under a Creative Commons Attribution 4.0 licence. If you’d rather link straight to it, the page is https://www.maptrack.com/templates/confined-space-management-plan-template.

Need to digitise safety inspections and compliance forms?

Register every asset in MapTrack, attach digital forms, and get a complete history of every inspection, service and compliance record.

Compliance and inspections · All templates · Pricing · Book a demo