Refrigeration Unit Annual Service Procedure

Annual service - cool room, cold room and freezer refrigeration unit

Your logo here
PAGE 1 OF 2
ANNUAL SERVICE

Estimated duration: 3 - 5 hours • Frequency: every 12 months

Carry-forward: Includes all quarterly service items. Complete the quarterly service procedure first, then perform these additional items. See maptrack.com/templates/refrigeration-quarterly-service

Equipment Details

# Service Action (Annual Additional Items) Type Done Notes
Refrigerant System
1Full refrigerant leak test (electronic detector on all joints, valves and fittings)TEST
Compressor
2Compressor oil analysis (send sample for acid, moisture and metal content)SAMPLE
Coil Cleaning
3Clean evaporator coil (chemical wash, rinse, sanitise)CLEAN
4Clean condenser coil (chemical wash or pressure wash)CLEAN
Controls and Calibration
5Calibrate temperature controllers (primary and backup)CALIBRATE
Electrical
6Inspect electrical contactors and wiring (pitting, heat damage, loose connections)INSPECT
Safety Devices
7Test high-pressure and low-pressure safety cutoutsTEST
Insulation and Structure
8Inspect insulation panels (damage, moisture ingress, ice behind panels)INSPECT
9Check floor drainage and falls (standing water, blockage)CHECK
10Inspect door hinges, closers and strikes (adjustment, wear)INSPECT
11Inspect strip curtains or air curtain (if fitted)INSPECT
Compliance and Documentation
12Compliance check per AS 1677 and food safety regulations (if food storage)VERIFY
13Update refrigerant register and service logRECORD

Fluid Specifications (General Guide)

SystemType / GradeNotes
RefrigerantR-134a, R-404A, R-407C or as specifiedDo not top up without leak test
Compressor oilPOE or mineral per manufacturerOil sample required annually
Coil cleaning chemicalsNon-acidic evaporator cleaner, condenser washFood-safe if food storage

Specifications are general guidelines. Always refer to the unit manufacturer's service manual. Refrigerant handling requires an appropriate licence (ARCTick in Australia).

Parts / Consumables Required (Annual Additional)

#Part / ConsumablePart NumberQtyReady
1Coil cleaning chemicals (evaporator and condenser)As req.
2Oil sample kit (bottle, label, prepaid postage)1
3Replacement contactors (if pitted)As req.
4Door gaskets (if leaking)As req.
5Calibration equipment (reference thermometers)1 set
6Electronic refrigerant leak detector1

Notes / Defects Identified

Next Service Due

Refrigeration Mechanic

Facilities Manager