Dozer 1000-Hour Service Procedure

Major service - crawler dozer (all makes)

Your logo here
PAGE 1 OF 2
1000-HOUR (MAJOR) SERVICE

Estimated duration: 6 - 10 hours • Frequency: every 1,000 engine hours

Carry-forward: This service includes all 500-hour tasks. Complete the 500-hour service procedure first, then perform these additional items. See maptrack.com/templates/dozer-500-hour-service

Equipment Details

# Service Action Type Done Notes
Engine (additional to 500-hour)
1Replace inner air filter elementREPLACE
2Check/clean injectors or send for testingINSPECT
3Inspect turbocharger for play and oil leaksINSPECT
4Inspect exhaust manifold and gasketsINSPECT
Hydraulic System (additional to 500-hour)
5Drain and replace full hydraulic oil (ISO VG 46)DRAIN/FILL
6Replace hydraulic suction strainerREPLACE
7Inspect hydraulic pump for noise/pressure/wearINSPECT
8Test blade lift, tilt, angle and ripper relief pressuresTEST
Drivetrain (additional to 500-hour)
9Drain and replace final drive oil (both sides, 80W-90)DRAIN/FILL
10Drain and replace transmission oilDRAIN/FILL
11Inspect torque converter stall speedTEST
12Check steering clutch pack operation and adjustmentADJUST
Cooling System (additional to 500-hour)
13Drain, flush and replace coolant (50/50 EG)FLUSH/FILL
14Pressure test cooling systemTEST
15Replace thermostat (if due per manufacturer)REPLACE
Undercarriage (additional to 500-hour)
16Full undercarriage measurement report (all components)MEASURE
17Assess undercarriage rebuild/replacement scheduleINSPECT
Structural and Blade (additional to 500-hour)
18Inspect mainframe welds, push arm welds and ripper mountsINSPECT
19Measure blade cutting edge and end bit wearMEASURE
20Inspect ripper shank and tip conditionINSPECT

Fluid Specifications (General Guide)

SystemType / GradeApprox. Capacity
Engine oil15W-40 CI-4 / CK-418 - 30 L
Hydraulic oilISO VG 46 (AW 46)80 - 180 L (full change)
Coolant50/50 ethylene glycol20 - 40 L (full system)
Final drive oil80W-90 GL-56 - 12 L per side
Transmission oilTO-4 or manufacturer spec30 - 60 L
GreaseEP2 lithium complexAs required

Specifications are general guidelines for typical crawler dozers (D4 - D8 class). Always refer to the manufacturer's service manual for your specific make and model. Capacities vary by machine size. At the 1,000-hour interval, hydraulic oil, coolant, final drive oil and transmission oil are fully drained and replaced.

Parts / Consumables Required (1000-hour additional items)

#Part / ConsumablePart NumberQtyReady
1Engine oil (15W-40)18-30 L
2Engine oil filter1
3Inner air filter element1
4Outer air filter element1
5Fuel filter element1
6Fuel/water separator element1
7Hydraulic return filter1
8Hydraulic suction strainer1
9Hydraulic oil (ISO VG 46)80-180 L
10Final drive oil (80W-90)12-24 L
11Transmission oil (TO-4)30-60 L
12Coolant (pre-mixed or concentrate)20-40 L
13Thermostat (if replacing)1
14EP2 grease cartridges2-4
15Rags, drip trays, waste oil containers-

Notes / Defects Identified

Next Service Due

Technician

Supervisor / Workshop Manager