API 6A aligned inspection record: wellhead and Christmas tree equipment
PAGE 1 OF 2
Inspection Items
Mark the applicable column for each item: P = Pass | F = Fail | N/A = Not applicable. Record notes for any F.
| # | Check | P | F | N/A | Notes / Action |
|---|---|---|---|---|---|
| Casing Head & Tubing Head | |||||
| 1 | Casing head: no external corrosion, erosion or mechanical damage | ||||
| 2 | Tubing head: no external corrosion, erosion or mechanical damage | ||||
| 3 | Casing hanger lockdown screws torqued and secure | ||||
| 4 | Casing annulus pressure within expected range, no sustained abnormal pressure | ||||
| Flanges, Ring Gaskets & Bolting | |||||
| 5 | Flange faces clean and undamaged at each connection | ||||
| 6 | Ring gasket type and material correct per API 6A specification | ||||
| 7 | No visible leaks at any flanged joint (hydrocarbon staining, drips, gas) | ||||
| 8 | Stud bolts and nuts: all present, correct length, proper nut engagement | ||||
| 9 | Stud bolts: no excessive corrosion, pitting or cross-threading | ||||
| Christmas Tree Valves | |||||
| 10 | Master valve: operates fully open to fully closed, no external leaks | ||||
| 11 | Wing valve(s): operate smoothly, position indicators correct | ||||
| 12 | Swab valve: operates fully, bonnet bolts secure | ||||
| 13 | Kill valve: operates fully, accessible and not obstructed | ||||
| 14 | Valve handwheels / actuators: undamaged, stems not bent | ||||
| 15 | Valve position indicators aligned with actual valve position | ||||
| # | Check | P | F | N/A | Notes / Action |
|---|---|---|---|---|---|
| Pressure Gauges & Choke | |||||
| 16 | Tubing, casing and annulus pressure gauges readable and functional | ||||
| 17 | Gauge calibration within date (check calibration sticker) | ||||
| 18 | Gauge isolation valves operate correctly | ||||
| 19 | Choke bean or adjustable choke: no erosion at choke body, correct setting | ||||
| Corrosion & Cathodic Protection | |||||
| 20 | External corrosion assessment: none / surface / pitting / severe | ||||
| 21 | Cathodic protection system status: anodes present / impressed current active | ||||
| 22 | CP test point cables intact, pipe-to-soil reading recorded (if accessible) | ||||
| 23 | Protective coating condition (painted surfaces, wraps): acceptable | ||||
| Wellhead Cellar & BOP Points | |||||
| 24 | Wellhead cellar clean and drained, no standing fluids | ||||
| 25 | No hydrocarbon accumulation or gas odour in cellar | ||||
| 26 | BOP flange condition (if applicable): stud holes aligned, ring groove undamaged | ||||
| 27 | Flange protectors in place when BOP not installed | ||||
| Safety Systems | |||||
| 28 | Surface safety valve (SSV): function test performed, closes on command | ||||
| 29 | Emergency shutdown (ESD) valve: responds within required time | ||||
| 30 | Fire loop / fusible plug: condition acceptable, not damaged or corroded | ||||
| 31 | SCADA communication confirmed: wellhead data transmitting to control room | ||||
| 32 | Wellhead identification plate legible and correct | ||||
Defects & Action Required (list any item marked F: reference item # from checklist)
| Item # | Defect description | Action taken / reported to | Rectified by / date |
|---|---|---|---|
Declaration
I declare that I have completed this wellhead inspection in accordance with API 6A requirements and the site integrity management plan. I have recorded all findings accurately and reported any defects or anomalies to the well operations supervisor and the integrity management team. Any critical defects affecting pressure containment or well control barriers have been escalated immediately. I understand that failure to complete inspections or report defects may breach regulatory obligations and the facility safety case.