Pressure Relief Valve Inspection and 5-Year Overhaul Record

Annual visual inspection and periodic bench test per AS 1271 and AS 3788

Your logo here
PAGE 1 OF 2
ANNUAL INSPECTION + 5-YEAR OVERHAUL

Estimated duration: ~20 min (annual visual) / ~2-4 hours (5-year bench test) • Full bench test is required every 5 years

Important: Annual visual inspections confirm PRV external condition and basic operability. The full 5-year bench test requires removal from service, disassembly, set pressure verification, and overhaul of internals. Only qualified personnel with appropriate test equipment should perform bench testing. Set pressure tolerances per AS 1271 are +/-3%.

Equipment and Inspection Details

# Inspection Item Method P / F / NA Notes
1. Documentation Review
1PRV data sheet available and currentREVIEW
2Previous inspection/test records reviewedREVIEW
3Piping and instrumentation diagram (P&ID) reference confirmedVERIFY
4Maintenance history reviewedREVIEW
2. Annual Visual Inspection
5Body and bonnet condition (corrosion, erosion)INSPECT
6Inlet/outlet piping conditionINSPECT
7Discharge piping unobstructedINSPECT
8Body drain clearINSPECT
9Cap/lever guard intactINSPECT
10Lock wire/seal intactVERIFY
11No evidence of leakage (weeping)INSPECT
12Isolation valve position correct (locked open)VERIFY
3. Operational Checks - Annual
13Lifting lever operates freelyTEST
14Valve reseats after manual liftTEST
15No audible seat leakageINSPECT
16Inlet pressure reading within normal rangeVERIFY
4. 5-Year Bench Test - Disassembly
17PRV removed from service (isolation confirmed)VERIFY
18Inlet/outlet blanked on vesselVERIFY
19Visual condition of internalsINSPECT
20Spring condition and free lengthMEASURE
21Seat and disc condition (lapping marks, erosion, corrosion)INSPECT
5. 5-Year Bench Test - Set Pressure Verification
22Test medium appropriate (air/nitrogen/water as applicable)VERIFY
23Set pressure achieved within tolerance (+/-3% per AS 1271)TEST
24Blowdown within acceptable limitsTEST
25Reseat pressure verifiedTEST
26Repeat test (minimum 3 lifts for consistency)TEST
6. 5-Year Overhaul - Repair/Replace
27Seat lapped or replacedINSPECT
28Spring replaced if corroded or fatiguedINSPECT
29O-rings and soft goods replacedVERIFY
30Body cleaned and inspected (NDT if suspect)NDT
7. Post-Overhaul Certification
31Final set pressure test passedTEST
32Valve tag updated with new test dateVERIFY
33Calibration certificate issuedVERIFY
34Valve reinstalled correctly (torque values applied)VERIFY
35Isolation valve returned to locked-open positionVERIFY

Set Pressure Test Results

Test No. Set Pressure Target (kPa) Actual Pop Pressure (kPa) Deviation (%) Blowdown Pressure (kPa) Reseat Pressure (kPa) PASS / FAIL
1
2
3

Defects, Recommendations and Corrective Actions

Next Inspection Due

Inspector / Technician

Plant Engineer / Manager