To save as PDF: use your browser's PrintSave as PDF. This form prints as A4.

Plumbing System Maintenance Checklist

Scheduled maintenance for commercial and industrial plumbing systems

Company Logo
FORM PL-001
Property Details

Mark P (Pass), F (Fail), or N/A for each item. Record defects and remedial actions in the Notes column.

# Inspection Item P F N/A Notes
Hot Water System
1Temperature and pressure relief valve tested
2Hot water delivery temperature 60-65C at unit
3Anode rod condition checked (if applicable)
4No leaks at connections, valves, or tank base
5Tempering valves delivering max 50C at outlets
Fixtures & Fittings
6All taps operating smoothly, no dripping
7Toilet cisterns filling and flushing correctly
8Isolating valves accessible and operational
9Hose taps and external fittings sealed
Drainage
10Floor drains clear and water sealed
11Grease traps cleaned and maintained
12Sewer vent pipes clear and unobstructed
13Stormwater drains flowing freely
14No odours indicating blocked or dry traps
Backflow Prevention
15Backflow prevention devices installed as required
16Annual testing current (test tag or certificate)
17Reduced pressure zone devices functioning
18Air gaps maintained at required distances
Compliance
19Water efficiency ratings current (WELS)
20Thermostatic mixing valves within test date
21Fire sprinkler isolation valves tagged and sealed
22Water meter accessible and reading correctly
23Copper pipe insulation intact (hot and cold)
24Legionella risk management plan current

Declaration

I confirm this plumbing maintenance has been completed in accordance with the Plumbing Code of Australia, relevant Australian Standards, and site-specific requirements. All findings are accurately recorded and any non-compliant items have been reported to the building manager.

Licensed Plumber
Signature
Printed Name
Date
Building / Facilities Manager
Signature
Printed Name
Date