To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

Piling Rig Daily Pre-Start Checklist

Piling rig daily inspection: complete before first use each shift

Company logo

PAGE 1 OF 2

Piling Rig & Operator Details

Inspection Items

Circle or mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Walk-Around
1General condition: no visible damage or deterioration
2No visible leaks: oil, coolant, fuel, hydraulic
3Ground conditions: stable, level, suitable for piling
Cab & Visibility
4Cabin access and housekeeping: clean, seatbelt working
5Horn: audible
6Mirrors / camera: clean, correctly adjusted
7Windscreen and wipers: clean, operational
8Sunroof / windows: clean, unobstructed
9Gauges and displays: functioning correctly
Engine & Fluids
10Engine oil: correct level
11Coolant: correct level, no leaks
12Hydraulic oil: correct level
13Fuel: sufficient for shift
14Batteries: terminals secure, no corrosion, charge adequate
Tracks & Undercarriage
15Track tension: correct, even both sides
16Pads / shoes: condition acceptable, no missing
17Rollers and idlers: rotate freely, no leaks
18Guards and covers: secure, not damaged
19No debris wrapped around tracks or undercarriage
Piling Rig Pre-Start Checklist - Page 2 of 2
Asset ID
Date
Operator
# Check P F N/A Notes / Action
Mast & Leaders
20Mast pins and bolts: secure, no play or cracking
21Leader guides / rails: condition acceptable, no excessive wear
22Winch and wire ropes: no fraying, kinks or damage
23Hammer / auger attachment: secure, connections tight
24Kelly bar / auger flights: condition acceptable, no damage
25Crowd system: operational, no leaks or binding
Hydraulics
26Rams and cylinders: no leaks or scoring
27Hoses: secure, no chafing, bulging or leaks
28Connections and couplings: tight, no weeping
29Hydraulic gauges: reading within normal range
Safety Devices
30Fire extinguisher: present, in date, accessible
31First aid kit: present and stocked
32Emergency stops: tested, accessible
33Guards and handrails: secure, not damaged
34Beacon / strobe / track alarm: operational
Electrical
35Headlights and work lights: operational
36Indicators: operational
37Beacon: operational (if separate from strobe)
Crane Functions (if fitted)
38Slew operation: smooth, no unusual noise
39Boom operation: smooth, no unusual noise
40LMI / RCI: operational, calibrated
Overall Result
PASS: all items satisfactory, piling rig fit for use FAIL: defect(s) identified, see table below

Defects & Action Required  (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this piling rig pre-start inspection before using this piling rig. I have reported any defects or non-compliant items to my supervisor and will not use this piling rig until any defects that affect safety have been rectified. I understand that failure to complete a pre-start check or to report defects may breach company policy and WHS obligations.

Operator Sign-off
Signature
Print name
Date & time
Supervisor / Reviewer Acknowledgement
Signature
Print name
Date