Pallet Racking Annual Compliance Audit (AS 4084:2023)

Formal annual inspection by competent person per AS 4084:2023 Section 9

Your logo here
PAGE 1 OF 3
ANNUAL COMPLIANCE AUDIT

Estimated duration: ~2-4 hours per aisle (depending on rack size) • Must be performed by a competent person

Important: AS 4084:2023 requires a formal annual inspection by a competent person in addition to regular user inspections. Any RED-classified damage requires immediate unloading of affected bays and cordoning off the area. Do not reload until repairs are completed by the rack manufacturer or a qualified structural engineer.

Facility and Audit Details

# Inspection Item Method P / F / NA Notes
1. Documentation and Signage
1Load rating signs displayed at each aisle endVERIFY
2Load configuration diagrams currentREVIEW
3Design certification availableREVIEW
4Modification records (if any)REVIEW
5Floor plan/layout drawing currentVERIFY
6Safety alert notices displayedVERIFY
2. Upright Frames
7Uprights plumb (max 1:500 deviation)MEASURE
8Base plate condition and anchor bolt integrityINSPECT
9Bracing connections secureINSPECT
10Bracing members straight (no bowing)INSPECT
11Front-to-back ties/spacers present and secureINSPECT
12Surface damage assessment per damage classification tableINSPECT
13Corrosion assessmentINSPECT
14Footing slab condition around base platesINSPECT
3. Beams and Connectors
15Beam deflection within limits (max L/200 under load)MEASURE
16Beam connector engagement (safety clips present)INSPECT
17Beam surface damage or dentsINSPECT
18Beam connector condition (no cracks or deformation)INSPECT
19Load distribution even across beam pairINSPECT
20Mixed beam sizes identified and flaggedVERIFY
21Welded vs clip-in connector conditionINSPECT
4. Damage Classification
22GREEN - no action required (damage within manufacturer tolerance)INSPECT
23AMBER - remedial action needed within 4 weeks (monitor and report)INSPECT
24RED - immediate unloading required (cordon off bay)INSPECT
25Damaged components tagged and recorded on registerVERIFY
26Previous AMBER items reviewed for deteriorationREVIEW
5. Floor and Environment
27Floor flatness adequate for forklift stabilityINSPECT
28Floor joints not causing rack settlementINSPECT
29Adequate clearance around rack perimeterMEASURE
30Lighting sufficient for inspections and operationsINSPECT
31Roof leak or water damage affecting rack componentsINSPECT
6. Operational Compliance
32Pallets in good condition (no broken boards in rack)INSPECT
33Loads not overhanging beam facesINSPECT
34No side-loading of selective rackVERIFY
35Rack protection (column guards, end-of-aisle barriers) in placeINSPECT
36Forklift damage reporting procedure in placeREVIEW
7. Seismic Requirements (if applicable)
37Seismic bracing installed per designINSPECT
38Connections to building structure verifiedVERIFY
39Base fixings adequate for seismic zoneINSPECT
40Post-earthquake inspection procedure availableREVIEW

Damage Register

Bay Ref Level Component Damage Description Class (G/A/R) Action Required Target Date Completed

Audit Summary

Total Bays Inspected
Green Items
Amber Items
Red Items

Auditor Recommendations and Notes

Next Audit Due

Auditor

Warehouse Manager