NFPA 25 Standpipe System Inspection Checklist

Standpipe and hose system inspection per NFPA 25, Chapter 6.

Company logo

PAGE 1 OF 1

Building & Inspector Details

Inspection Items

Mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Standpipe Risers
1Risers in good condition, no visible corrosion or physical damage
2Standpipe caps in place, secured and undamaged
3Control valves accessible, sealed or locked in the open position
Hose Connections
4Hose connections accessible (no obstructions within 36 in.)
5Hose connection threads in good condition, no cross-threading
6Caps and plugs present, gaskets intact
Hose Valves
7Hose valves not leaking, handwheels intact and operable
8Pressure-reducing valves set to correct downstream pressure
9Hose valve cabinets in good condition, doors open freely
Fire Department Connections (FDC)
10FDC visible, accessible and properly identified
11FDC couplings undamaged, caps or plugs in place
12FDC check valve (clapper) operates freely, no debris
13FDC drain valve functioning, piping drains properly
Pressure Gauges
14System pressure gauge(s) present, readable and within range
15Gauge calibration current (replaced or tested within 5 years)
Flow Tests
16Flow test conducted per required frequency (5-year cycle)
17Flow and pressure results meet minimum design requirements
18Test results documented with static, residual and flow readings
Signage & Identification
19Standpipe system identification signs posted per code
20Floor-level identification and stairwell signage visible
Overall Result
PASS: all items satisfactory, system compliant FAIL: deficiency found, see corrective actions

Deficiencies & Corrective Actions  (list any item marked F: reference item # from checklist)

Item # Deficiency description Corrective action / reported to Corrected by / date

Declaration

I declare that I have completed this standpipe system inspection in accordance with NFPA 25, Chapter 6 requirements. All deficiencies have been reported to the building owner or designated representative. Any impairments to the standpipe system have been documented and the appropriate fire department has been notified where required.

Inspector Sign-off
Signature
Print name
Date & time
Building Owner / Manager Acknowledgment
Signature
Print name
Date