Fire pump assembly inspection per NFPA 25, Chapter 8.
PAGE 1 OF 2
Inspection Items
Mark the applicable column for each item: P = Pass | F = Fail | N/A = Not applicable. Record notes for any F.
| # | Check | P | F | N/A | Notes / Action |
|---|---|---|---|---|---|
| Pump Assembly | |||||
| 1 | Pump shaft alignment within manufacturer tolerance | ||||
| 2 | Packing glands adjusted, slight drip present (not excessive) | ||||
| 3 | Bearings lubricated, no unusual noise or heat during run | ||||
| 4 | Pump casing free of leaks, corrosion and physical damage | ||||
| 5 | Coupling guard in place and securely fastened | ||||
| Controller | |||||
| 6 | Controller in automatic mode, pilot lights functional | ||||
| 7 | Pressure switch set point correct per design | ||||
| 8 | Controller enclosure clean, ventilated, no moisture intrusion | ||||
| 9 | Alarm and supervisory circuits tested and functional | ||||
| Power Supply (Electrical) | |||||
| 10 | Electrical supply disconnect accessible and locked on | ||||
| 11 | Voltage and amperage readings within rated parameters | ||||
| 12 | Transfer switch operational (where applicable) | ||||
| Suction & Discharge | |||||
| 13 | Suction valve fully open, sealed or locked | ||||
| 14 | Discharge valve fully open, sealed or locked | ||||
| 15 | Suction strainer clean, no blockage or debris | ||||
| 16 | Check valve operating correctly, no backflow | ||||
| # | Check | P | F | N/A | Notes / Action |
|---|---|---|---|---|---|
| Pressure Gauges | |||||
| 17 | Suction gauge readable and within expected range | ||||
| 18 | Discharge gauge readable and within expected range | ||||
| 19 | Gauge calibration current (replaced or tested within 5 years) | ||||
| Flow Test Results | |||||
| 20 | No-flow (churn) test completed, pressure recorded | ||||
| 21 | Peak-flow (150% rated) test completed, pressure recorded | ||||
| 22 | Test results within 95% of original acceptance test curve | ||||
| Fuel System (Diesel Pumps Only) | |||||
| 23 | Fuel tank level at minimum 2/3 full | ||||
| 24 | Fuel lines and connections free of leaks | ||||
Deficiencies & Corrective Actions (list any item marked F: reference item # from checklist)
| Item # | Deficiency description | Corrective action / reported to | Corrected by / date |
|---|---|---|---|
Declaration
I declare that I have completed this fire pump inspection in accordance with NFPA 25, Chapter 8 requirements. All deficiencies have been reported to the building owner or designated representative. Any impairments to the fire pump system have been documented and the impairment procedures per NFPA 25, Section 15.5 have been followed.