LOTO / Isolation Checklist

Complete before commencing any maintenance, repair or inspection on isolated equipment

Company logo

PAGE 1 OF 2

Isolation Details
Personnel

Energy Source Identification

List every energy source. Document the isolation point, method, lock number and tag number for each.

# Energy Type Isolation Point Isolation Method Lock # Tag #
1
2
3
4
5
6
7
8

Pre-Isolation Checklist

Mark each item: P = Pass  |  F = Fail  |  N/A = Not applicable.

# Check P F N/A Notes / Action
1All energy sources identified
2Affected personnel notified
3Equipment shut down in normal sequence
4All isolation points locked and tagged
5Stored/residual energy dissipated or blocked
6Zero energy verification completed (try test)
7Isolation register updated
8LOTO signage in place
LOTO / Isolation Checklist — Page 2 of 2
Permit #
Date
Overall Result
PASS — all items verified, isolation confirmed ACTION REQUIRED — items to rectify FAIL — do not proceed, report immediately
Isolation Verification

Re-Energisation Checklist

Complete all items before removing locks and returning equipment to service.

# Check P F N/A Notes / Action
1All tools and materials removed from equipment
2All guards and covers replaced
3All personnel clear of equipment
4Locks and tags removed by authorised person only
5Affected personnel notified of re-energisation
6Equipment restarted and tested

Declaration

I declare that all energy sources have been identified, isolated, locked and tagged in accordance with the organisation's isolation procedure. Zero energy verification has been completed. All personnel have been notified. This checklist has been completed accurately and to the best of my knowledge.

Isolation Officer Sign-off
Signature
Print name
Date & time
Supervisor Sign-off
Signature
Print name
Date