Lockout Tagout Procedure

Energy isolation and equipment lockout procedure record

Company Logo
DOC-LOTO-001
Equipment Identification

Mark each step as completed (P), not completed (F), or not applicable (N/A). All steps must be completed in sequence.

# Procedure Step P F N/A Notes
Energy Sources
1All energy sources identified (electrical, hydraulic, pneumatic, thermal, mechanical, gravitational)
2Isolation points documented on equipment-specific procedure
3Stored/residual energy hazards identified
4Affected personnel notified of shutdown
Lockout Steps
5Equipment shut down using normal stopping procedure
6All energy-isolating devices moved to OFF/SAFE position
7Personal lock applied to each isolation point
8Danger tag attached with worker details and date
9Stored energy dissipated (capacitors, springs, pressure, elevated parts)
10Multi-lock hasp used (if multiple workers involved)
Verification
11Attempted start-up to confirm isolation effective
12Voltage/pressure/flow tested at zero
13Controls returned to OFF after verification
14Area safe for maintenance to commence
Removal Procedure
15Work completed and tools/materials cleared
16Guards and safety devices reinstalled
17All personnel clear of equipment danger zones
18Each worker removes own lock only (one person, one lock, one key)
19Danger tags removed by authorised person
20Affected personnel notified before re-energisation
21Equipment tested for correct operation after restart
22LOTO register updated with completion details

Declaration

I confirm that all energy sources have been identified, isolated and verified. I accept responsibility for maintaining lockout integrity for the duration of this work. No person shall remove another worker's lock without formal authorisation from the site supervisor.

Authorised Person (Issuer)
Name
Signature
Date / Time
Worker Performing Lockout
Name
Signature
Date / Time