ANNUAL SERVICE

Estimated duration: 4 - 8 hours • Frequency: every 12 months

Carry-forward: Includes all quarterly service tasks. Complete the quarterly service procedure first, then perform these additional items. See maptrack.com/templates/hvac-chiller-quarterly-service

Equipment Details

# Service Action (Annual Additional Items) Type Done Notes
Refrigerant System
1Full refrigerant leak test (electronic detector on all joints and fittings)TEST
2Update refrigerant register / F-gas logRECORD
3Verify safety data sheets for refrigerant on siteCHECK
Compressor
4Compressor oil analysis (send sample for acid test, moisture, metal content)SAMPLE
Heat Exchangers
5Eddy current test on condenser / evaporator tubes (water-cooled, if due per schedule)TEST
6Clean evaporator tubes (water-cooled)CLEAN
Instrumentation and Calibration
7Calibrate all temperature sensors and pressure transducersCALIBRATE
8Calibrate chilled water flow meterCALIBRATE
Variable Speed Drive (if Fitted)
9Inspect VFD / variable speed drive (fan, amps, fault log)INSPECT
Electrical
10Electrical insulation resistance test (megger on compressor motor windings)TEST
Performance Testing
11Full chiller performance test (measure COP / EER at design conditions)TEST
Valves and Compliance
12Inspect and exercise all isolation valvesINSPECT

Fluid Specifications (General Guide)

SystemType / GradeNotes
RefrigerantR-134a, R-410A, R-407C or as specifiedDo not top up without leak test
Compressor oilPOE or mineral per manufacturerOil sample required annually
Condenser water treatmentBiocide, anti-scale, corrosion inhibitorWater-cooled systems only

Specifications are general guidelines. Always refer to the chiller manufacturer's service manual for your specific make and model. Refrigerant handling requires an appropriate licence.

Parts / Consumables Required (Annual Additional)

#Part / ConsumablePart NumberQtyReady
1Oil sample kit (bottle, label, prepaid postage)1
2Calibration equipment (reference gauges, RTD)1 set
3Tube cleaning brushes / balls (water-cooled)As req.
4Replacement sensors (if failed during test)As req.
5Electronic refrigerant leak detector1
6Insulation resistance tester (megger)1

Notes / Defects Identified

Next Service Due

Technician