To save as PDF: use your browser's PrintSave as PDF. This form prints as A4.

Hot Work Permit

Welding, cutting, grinding and open flame work authorisation

Company Logo
PERMIT No. ________
Work Details

Mark each item: Pass (P), Fail (F), or N/A. Record notes for any failed items.

# Inspection Item P F N/A Notes
Fire Prevention
1Combustible materials cleared within 11 metres of work area
2Floor swept clean of dust, shavings and debris
3Fire-resistant blankets or screens in place
4Fire extinguisher (appropriate class) within 5 metres
5Sprinkler system operational (or compensating measures)
6Fire watch assigned and briefed (minimum 30 min post-work)
7Wall/floor openings sealed to prevent spark migration
Personal Protection
8Welding helmet/face shield with correct shade lens
9Fire-resistant clothing (no synthetic fabrics)
10Welding gloves in good condition
11Safety boots with steel cap and metatarsal guard
12Hearing protection provided (if noise exceeds 85 dB)
13Respiratory protection provided (fume extraction or mask)
Atmospheric Testing
14Oxygen level tested (19.5% - 23.5%)
15Flammable gas reading below 10% LEL
16Toxic gas levels within safe limits
17Ventilation adequate for work area size
18Gas monitor calibrated and within service date
Completion & Sign-off
19Area inspected 30 minutes after work ceased
20Area inspected 60 minutes after work ceased
21All hot work equipment switched off and secured
22No evidence of smouldering, hot spots or smoke
23Fire watch released and permit closed out

Declaration

I confirm that I have inspected the work area, verified all precautions listed above, and authorise the hot work described. The permit holder must carry this permit while work is in progress and surrender it upon completion.

Issuing Authority
Name
Signature
Date / Time
Permit Holder (Operator)
Name
Signature
Date / Time
Fire Watch Officer
Name
Signature
Date / Time