H2S Safety Equipment Inspection Checklist

Hydrogen sulfide safety equipment inspection per API RP 55.

Company logo

PAGE 1 OF 2

Site & Inspector Details

Inspection Items

Mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Personal H2S Monitors
1Monitor calibrated within manufacturer-specified interval
2Daily bump test performed and documented before use
3Low alarm setpoint confirmed at 10 ppm
4High alarm setpoint confirmed at 15 ppm (or site-specific threshold)
5Sensor within manufacturer replacement life, no drift observed
Fixed Gas Detectors
6Fixed detectors operational and displaying readings
7Calibration current per manufacturer schedule (certificate on file)
8Detector placement per API RP 55 (downwind, breathing zone height)
9Alarm relays and control panel communication verified
Wind Socks / Direction Indicators
10Wind socks installed at all required locations and visible
11Wind socks in good condition, not torn or faded beyond recognition
12Wind direction indicators operational (if electronic type installed)
SCBA Equipment
13SCBA units staged at designated safe briefing areas (SBAs)
14Air cylinders fully charged (min. 2,216 psi / 4,500 psi per type)
15Face seals, straps, and regulators in good working order
16SCBA hydrostatic test current (cylinder within test date)
H2S Safety Equipment Inspection - Page 2 of 2
Site
Date
Inspector
# Check P F N/A Notes / Action
Breathing Air Stations
17Cascade system or breathing air compressor operational
18Air quality tested and meets Grade D breathing air standard
19Supply hoses and fittings inspected, no leaks or damage
Warning Systems
20Audible alarm systems tested and functional (horns, sirens)
21Visual alarm indicators operational (strobes, beacon lights)
22H2S warning signs posted at all entry points and hazard areas
Emergency Shutdown
23Emergency shutdown stations identified, accessible and labeled
24ESD valves functional and fail-safe position verified
Overall Result
PASS: all H2S safety equipment satisfactory FAIL: deficiency identified, see table below

Deficiencies & Corrective Actions  (list any item marked F: reference item # from checklist)

Item # Deficiency description Corrective action / reported to Corrected by / date

Declaration

I declare that I have completed this H2S safety equipment inspection in accordance with API Recommended Practice 55 and applicable site-specific H2S contingency plan requirements. All deficiencies have been reported to the responsible party. Equipment found non-functional must be replaced or repaired before personnel enter the H2S-classified area.

Inspector Sign-off
Signature
Print name
Date & time
Site Safety Supervisor Acknowledgment
Signature
Print name
Date