To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

Grout Plant Daily Pre-Start Checklist

Grout plant daily inspection: complete before first use each shift

Company logo

PAGE 1 OF 2

Grout Plant & Operator Details

Inspection Items

Circle or mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Walk-Around
1General condition: no visible damage
2No visible leaks: oil, hydraulic, grout
3Ground conditions: stable, suitable for operation
Engine & Fluids
4Engine oil: correct level
5Hydraulic oil: correct level
6Fuel: sufficient for shift
7Coolant: correct level (if water-cooled)
Hydraulic System
8ON/OFF detent: functions correctly
9Rams / cylinders: no leaks
10Hoses: secure, no chafing or bulging
11Connections and couplings: secure, no leaks
Electrical
12Battery: mount secure, connections tight
13Isolator switch: operational
14Ignition / start system: operational
Grout Plant Pre-Start Checklist - Page 2 of 2
Asset ID
Date
Operator
# Check P F N/A Notes / Action
Structure & Guarding
15Panels, covers and grates: in place, secure
16Guards: secure, not damaged or removed
17Frame: no damage, cracks or distortion
Mixer & Agitator
18Paddle / agitator: condition acceptable, no excessive wear
19Grate interlock: grate cannot open while paddle is turning
20Hopper: condition acceptable, no blockages
21Water supply: connected, adequate flow
Pump System
22Grout pump: condition acceptable, no leaks
23Delivery lines and couplings: secure, no wear or cracks
24Pressure gauges: readable, functioning
Safety Devices
25Fire extinguisher: present, in date, accessible
26Emergency stops: tested, accessible
27LOTO points: identified, accessible
28Guards: in place, secure
Overall Result
PASS: all items satisfactory, grout plant fit for use FAIL: defect(s) identified, see table below

Defects & Action Required  (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this grout plant pre-start inspection before using this grout plant. I have reported any defects or non-compliant items to my supervisor and will not use this grout plant until any defects that affect safety have been rectified. I understand that failure to complete a pre-start check or to report defects may breach company policy and WHS obligations.

Operator Sign-off
Signature
Print name
Date & time
Supervisor / Reviewer Acknowledgement
Signature
Print name
Date