FMEA Worksheet

Failure Mode and Effects Analysis - AIAG 4th Edition format (RPN method)

Company
logo

PAGE 1 OF 2

FMEA Header
# Process Step / Function Potential Failure Mode Potential Effect(s) of Failure S Potential Cause(s) O Current Controls (Prevention) Current Controls (Detection) D RPN Recommended Action Resp. Target Date
1
2
3
4
5
6
7
8
9
10
11
12

FMEA Worksheet

Results of actions and rating reference scales

Company
logo

PAGE 2 OF 2

Results of Actions (post-implementation)
# Action Taken Date Completed S O D Revised RPN Notes
1
2
3
4
5
6
AIAG 4th Edition Rating Reference Scales

Severity (S)

RatingEffect
10Hazardous without warning
9Hazardous with warning
8Very high (inoperable, 100% scrap)
7High (reduced performance)
6Moderate (partial malfunction)
5Low (reduced performance, noticed)
4Very low (minor, noticed by most)
3Minor (noticed by some)
2Very minor (noticed by few)
1None (no discernible effect)

Occurrence (O)

RatingProbability
10Very high (≥ 1 in 2)
9Very high (1 in 3)
8High (1 in 8)
7High (1 in 20)
6Moderate (1 in 80)
5Moderate (1 in 400)
4Moderate (1 in 2,000)
3Low (1 in 15,000)
2Low (1 in 150,000)
1Remote (≤ 1 in 1,500,000)

Detection (D)

RatingLikelihood of Detection
10Almost impossible to detect
9Very remote
8Remote
7Very low
6Low
5Moderate
4Moderately high
3High
2Very high
1Almost certain to detect
RPN Calculation: Risk Priority Number = Severity (S) × Occurrence (O) × Detection (D). Range: 1 to 1,000. Higher values indicate greater risk. Failure modes with RPN > 100 or Severity ≥ 9 should receive priority action.
Review and Approval

This FMEA worksheet has been prepared in accordance with the AIAG FMEA Reference Manual 4th Edition methodology. All failure modes have been assessed by the cross-functional team listed above. Recommended actions have been assigned with responsible persons and target completion dates. This document should be reviewed and updated whenever the process, design or controls change.

Prepared By
Responsible Engineer
Quality Manager