How to save as PDF: Use your browser's Print menu (Ctrl+P / Cmd+P), then select Save as PDF as the destination. This template is sized for A4 paper.

Fire Extinguisher Inspection Tag and Record

Routine six-monthly service and monthly inspection per AS 1851-2012, one row per unit

Company
logo

PAGE 1 OF 2

Details
# Location / point no. Type & serial Date Result (P/F) Inspector Notes / next due
GROUND FLOOR AND ENTRIES
1 Main entry - dry powder ABE, gauge, pin, seal, access
2 Reception / foyer - CO2, hose, nozzle, mounting
3 Front office - water or foam, body condition, signage
4 Ground stairwell - dry powder, pressure, clear access
5 Rear exit - foam, seal intact, correctly mounted
6 Kitchen / tea room - wet chemical, weight check, gauge
WORKSHOP AND PLANT AREAS
7 Workshop bay 1 - dry powder ABE, body, hose, pin
8 Workshop bay 2 - CO2, gauge in green, access clear
9 Welding bay - dry powder, no corrosion, seal intact
10 Compressor / plant room - CO2, mounting, signage
11 Fuel / chemical store - foam, weight, tamper seal
12 Battery / charging area - CO2, gauge, clear access
13 Store / loading dock - dry powder, hose, nozzle
UPPER FLOORS AND OFFICES
14 Level 1 corridor - dry powder, gauge, pin, seal
15 Level 1 office - CO2, body condition, mounting
16 Level 1 stairwell - foam, access clear, signage
17 Level 2 corridor - dry powder, pressure, seal
18 Level 2 office - CO2, hose and nozzle condition
19 Level 2 stairwell - foam, correctly mounted, in date
EXTERNAL AND VEHICLES
20 Yard / hardstand - dry powder, weatherproof housing
21 Site vehicle 1 - dry powder ABE, bracket secure
22 Site vehicle 2 - dry powder ABE, gauge, seal
23 Generator / genset - CO2, mounting, access clear
24 Fuel bowser / diesel tank - foam, signage, in date
Declaration & Sign-Off

I confirm that all items have been inspected/completed as indicated above. Any defects or concerns have been noted and reported.

Completed By
Reviewed / Approved By