# Item OK AR N/A Pri Notes
Mechanical Systems
1Pumps: running smoothly, no unusual noise or vibration, seals intact
2Compressors: pressure within range, auto drain working, no leaks
3Motors: bearings quiet, no overheating, alignment checked
4Belts and drives: tension correct, no cracking, wear or fraying
5Bearings: no excessive play, noise or heat; lubricated per schedule
6Lubrication: grease points serviced, oil levels correct, no leaks
Electrical Systems
7Distribution boards: labelled, clear access, no signs of overheating
8Transformers: operating temperature normal, oil level correct (if applicable)
9UPS / backup power: batteries charged, transfer switch tested
10Cable trays and conduits: secure, no damage, covers in place
11Earthing and bonding: connections tight, no corrosion, tested per schedule
Plumbing & Water
12Mains supply: isolation valves accessible and labelled, no leaks
13Hot water systems: temperature correct, TPR valve accessible and tagged
14Backflow prevention: tested within compliance period, tags current
15Drains and pits: clear, no blockages, grates in place
16Grease traps: cleaned per schedule, no overflow or odour
HVAC & Ventilation
17Air handling units (AHUs): filters clean, belts intact, no unusual noise
18Chillers: operating within parameters, refrigerant levels correct
19Cooling towers: water treatment current, drift eliminators intact
20BMS / controls: alarms reviewed, setpoints correct, sensors calibrated
21Ductwork: no visible damage, dampers operational, insulation intact
Facility Maintenance Checklist - Page 2 of 2
Facility
Date
Inspector
# Item OK AR N/A Pri Notes
Lighting
22Interior lighting: all working, no flickering, diffusers clean
23Exterior lighting: all working, sensors and timers functional
24Emergency lighting: tested, battery backup functional, lamps working
25Motion sensors and timers: responding correctly, zones calibrated
Fire & Life Safety
26Detection system: panel clear of faults, detectors unobstructed
27Suppression system: gauges correct, valves locked open, no leaks
28Fire extinguishers: in place, tagged, pressure gauge in green zone
29Hydrants and hose reels: accessible, tested per schedule, signage visible
30Evacuation: plans current, paths clear, assembly points marked
Building Envelope
31Roof: no visible damage, ponding, rust or loose sheeting
32Walls and cladding: no cracks, corrosion, damage or water ingress
33Windows and glazing: intact, seals in good condition, locks working
34Doors (roller, personnel, fire): operating correctly, seals intact
35Weatherseals and loading docks: no gaps, bumpers and levellers functional
Grounds & Car Park
36Surfaces: no potholes, cracking or trip hazards on paths and hardstand
37Stormwater drainage: pits clear, grates in place, no pooling
38Bollards and barriers: in place, no damage, reflectors visible
39Line marking: visible, compliant with traffic plan
40External lighting: working, adequate coverage, no dark spots

Action Summary  (list items marked AR with priority and assigned person)

Item # Action Description Priority Assigned To Due Date
Inspector Sign-off
Signature
Print name
Date
Facility Manager Sign-off
Signature
Print name
Date