To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

Excavator Daily Pre-Start Checklist

Excavator daily inspection: complete before first use each shift

Company logo

PAGE 1 OF 2

Excavator & Operator Details

Inspection Items

Circle or mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Walk-Around
1General condition: clean, no visible damage
2No visible leaks: oil, coolant, fuel, hydraulic
3Ground conditions: stable, suitable for operation
Engine & Fluids
4Engine oil: correct level
5Coolant: correct level, no leaks
6Hydraulic oil: correct level
7Fuel: sufficient for shift
8DEF / AdBlue: level adequate (if fitted)
9Air filter indicator: in acceptable range
Undercarriage / Tracks
10Track tension: correct, even both sides
11Sprockets: no excessive wear or damage
12Rollers and idlers: rotate freely, no leaks
13Track pads / shoes: condition acceptable, no missing
14No debris wrapped around tracks or undercarriage
Boom, Stick & Bucket
15Pins and bushes: no excessive wear or play
16Bucket teeth and cutting edge: condition acceptable
17Hydraulic cylinders: no leaks, no scoring
18Hoses: secure, no leaks, no chafing or bulging
19Quick hitch: locked, safety pin in place (if fitted)
Excavator Pre-Start Checklist - Page 2 of 2
Asset ID
Date
Operator
# Check P F N/A Notes / Action
Cab & Controls
20ROPS / FOPS: integrity, no damage or modifications
21Seatbelt: working, not frayed or damaged
22Mirrors: clean, correctly adjusted
23Wipers and washers: operational
24Horn: audible
25Reversing camera / alarm: operational (if fitted)
26Joystick / control operation: smooth, responsive
27Gauges and displays: functioning correctly
Safety Devices
28Fire extinguisher: present, in date, accessible
29First aid kit: present and stocked
30Emergency stops: tested, accessible
31Swing lock: engages and holds
32Boom lock: engages and holds
33Travel lock: engages and holds
Lights & Electrics
34Headlights and work lights: operational
35Beacon: operational (if fitted)
36Indicators: operational
37Battery: terminals secure, no corrosion
Attachments
38Attachment secured: correct pins, retainers in place
39Hydraulic hoses connected: no leaks at couplings
Overall Result
PASS: all items satisfactory, excavator fit for use FAIL: defect(s) identified, see table below

Defects & Action Required  (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this excavator pre-start inspection before using this excavator. I have reported any defects or non-compliant items to my supervisor and will not use this excavator until any defects that affect safety have been rectified. I understand that failure to complete a pre-start check or to report defects may breach company policy and WHS obligations.

Operator Sign-off
Signature
Print name
Date & time
Supervisor / Reviewer Acknowledgement
Signature
Print name
Date