Excavation Safety Checklist

Pre-excavation and ongoing safety controls for trenching and earthworks

Company Logo
FORM-EXC-001
Excavation Details

Verify each item before and during excavation. Mark as Compliant (P), Non-Compliant (F), or N/A.

# Safety Item P F N/A Notes
Pre-Dig Checks
1Dial Before You Dig (DBYD) enquiry completed and plans obtained
2Underground service locator used to verify positions
3Geotechnical assessment reviewed (soil stability)
4Safe Work Method Statement (SWMS) completed and signed
5Adjacent structures assessed for undermining risk
Shoring & Battering
6Shoring, benching or battering system selected and installed
7Trench shield/box in place (if depth exceeds 1.5 m)
8Batter angles appropriate for soil type
9Spoil placed minimum 1 metre from excavation edge
Access & Egress
10Safe access/egress provided (ladder, ramp, steps)
11Access points within 9 metres of any worker in trench
12Edge protection/barriers around open excavation
13Warning signage in place (open excavation, no entry)
14Pedestrian and vehicle exclusion zones established
Monitoring
15Excavation inspected daily by competent person
16Inspected after heavy rain or significant change in conditions
17Groundwater/seepage monitored and pumped if required
18Atmospheric testing conducted (if confined space applies)
Services & Utilities
19Electrical cables identified and protected or isolated
20Gas mains identified and hand-dig zone observed
21Water and sewer pipes located and protected
22Telecommunications cables identified
23Service strike emergency procedure understood by all workers

Declaration

I have inspected the excavation and confirm all safety measures are in place. No person shall enter the excavation until this checklist is satisfactorily completed. Work must cease immediately if ground conditions change.

Competent Person
Name
Signature
Date
Site Supervisor
Name
Signature
Date