3-monthly service - EWP and boom lift (diesel and electric, all makes)
Estimated duration: 2 - 3 hours • Frequency: every 3 months or 150 operating hours
Equipment Details
| # | Service Action | Type | Done | Notes |
|---|---|---|---|---|
| Engine / Power (Diesel Models) | ||||
| 1 | Drain and replace engine oil (10W-30 or 15W-40) | DRAIN/FILL | ☐ | |
| 2 | Replace engine oil filter | REPLACE | ☐ | |
| Battery / Power (Electric Models) | ||||
| 3 | Check battery electrolyte level and specific gravity | CHECK | ☐ | |
| 4 | Check battery charger operation and connections | CHECK | ☐ | |
| Hydraulic System | ||||
| 5 | Check hydraulic oil level in sight glass | CHECK | ☐ | |
| 6 | Inspect hydraulic hoses, fittings and cylinders for leaks | INSPECT | ☐ | |
| Controls and Functions | ||||
| 7 | Test all platform controls (drive, steer, boom up/down, telescope, rotate) | TEST | ☐ | |
| 8 | Test all ground controls (same functions) | TEST | ☐ | |
| 9 | Test emergency descent/lowering (manual pump or gravity valve) | TEST | ☐ | |
| Turntable and Boom | ||||
| 10 | Inspect turntable bearing for play and noise | INSPECT | ☐ | |
| 11 | Grease all boom pivot pins | GREASE | ☐ | |
| 12 | Grease turntable bearing | GREASE | ☐ | |
| 13 | Grease slew ring | GREASE | ☐ | |
| Tyres, Outriggers and Chassis | ||||
| 14 | Check tyre pressures and condition (all positions) | CHECK | ☐ | |
| 15 | Inspect outriggers/stabilisers (extend, retract, pads) | INSPECT | ☐ | |
| Safety Systems | ||||
| 16 | Test load sense/overload system | TEST | ☐ | |
| 17 | Check platform floor condition | CHECK | ☐ | |
| 18 | Inspect guardrails and mid-rails | INSPECT | ☐ | |
| 19 | Test horn and motion alarms | TEST | ☐ | |
| 20 | Inspect harness anchor points on platform | INSPECT | ☐ | |
| 21 | Check control labels and safety decals | CHECK | ☐ | |
Fluid Specifications (General Guide)
| System | Type / Grade | Approx. Capacity |
|---|---|---|
| Engine oil (diesel) | 10W-30 or 15W-40 | 6 - 12 L |
| Hydraulic oil | ISO VG 32 or 46 | 40 - 80 L (system) |
| Grease | EP2 lithium complex | As required |
| Battery water (electric) | Distilled water | As required |
Specifications are general guidelines for typical boom lifts and EWPs (diesel and electric). Always refer to the manufacturer's service manual for your specific make and model. Capacities vary by machine size and configuration.
Parts / Consumables Required
| # | Part / Consumable | Part Number | Qty | Ready |
|---|---|---|---|---|
| 1 | Engine oil filter (diesel) | 1 | ☐ | |
| 2 | Engine oil (10W-30 or 15W-40, diesel) | 6-12 L | ☐ | |
| 3 | EP2 grease cartridges | 2-4 | ☐ | |
| 4 | Battery water - distilled (electric) | As req. | ☐ | |
| 5 | Hydraulic oil for top-up | As req. | ☐ | |
| 6 | Rags, drip tray, waste oil container | - | ☐ |
Notes / Defects Identified
Next Service Due
Technician
Supervisor / Workshop Manager