To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

EWP / Boom Lift Pre-Start Checklist

Elevated work platform daily inspection: complete before first use

Company logo

PAGE 1 OF 2

EWP & Operator Details

Inspection Items

Circle or mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Pre-Operational Checks
1Operator's manual available and accessible
2Rated capacity known: load chart visible and legible
3Exclusion zone established / barricades in place
Structural
4Boom sections: no cracks, bends or visible damage
5Turntable / slew ring: secure, no excessive play
6Platform / basket: floor secure, no damage
7Guardrails: top rail, mid rail secure; no bends
8Toe boards: in place, secure
9Gate / chain: closes and latches securely
Controls
10Ground controls: all functions operate correctly
11Platform controls: all functions operate correctly
12Emergency stop: tested from ground and platform
13Emergency descent: operates correctly
14Function labels: legible and in place
Hydraulics
15Hydraulic cylinders: no leaks, no damage
16Hoses and fittings: secure, no leaks, no chafing
EWP / Boom Lift Pre-Start Checklist - Page 2 of 2
Asset ID
Date
Operator
# Check P F N/A Notes / Action
Electrical
17Battery: charge level adequate
18Warning lights: operational
19Alarms: motion alarm and tilt alarm working
Tyres / Wheels or Tracks
20Tyre condition: no cuts, bulges or excessive wear
21Tyre pressure: correct (pneumatic); tracks tensioned (tracked)
22Wheel nuts: tight, no missing
Outriggers / Stabilisers
23Outrigger pads: present, no damage
24Outrigger pins: secure
25Outrigger operation: extends and retracts correctly
Safety Equipment
26Harness anchor points: secure, no damage
27Lanyard attachment: secure, in date
28Wind speed indicator: fitted and functional (if applicable)
Engine / Power
29Engine oil: correct level (IC engines)
30Coolant: correct level
31Fuel: sufficient for shift
32Belts: no cracks, correct tension
Overall Result
PASS: all items satisfactory, EWP fit for use FAIL: defect(s) identified, see table below

Defects & Action Required  (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this EWP / boom lift pre-start inspection before using this elevated work platform. I have reported any defects or non-compliant items to my supervisor and will not use this EWP until any defects that affect safety have been rectified. I understand that failure to complete a pre-start check or to report defects may breach company policy and WHS obligations.

Operator Sign-off
Signature
Print name
Date & time
Supervisor / Reviewer Acknowledgement
Signature
Print name
Date