To save as PDF: use your browser's PrintSave as PDF. This form prints as A4.

Emergency Evacuation Drill Checklist

Planning, execution and review of emergency evacuation exercises

Company Logo
DRILL No. ________
Drill Details

Assess each item during the drill. Mark as Satisfactory (P), Unsatisfactory (F), or N/A.

# Assessment Item P F N/A Notes
Pre-Drill Planning
1Emergency plan current and distributed to wardens
2Wardens briefed on roles and responsibilities
3Assembly points confirmed and signposted
4Visitors and contractors included in headcount procedure
5Persons with disability or mobility needs identified and assisted
Alarm Activation
6Alarm activated and audible throughout the building
7Visual alarm indicators operational (strobe lights)
8PA announcement clear and understood by occupants
9Fire panel checked and zone identified correctly
Evacuation Process
10Occupants ceased work immediately on alarm
11Exit routes clear and unobstructed
12Emergency exit doors opened easily (no locks, no propping)
13Wardens swept floors and confirmed all clear
14Lifts not used during evacuation
15Emergency lighting functional in stairwells
Assembly Point
16All personnel reported to designated assembly point
17Headcount completed and reconciled with sign-in register
18Missing persons reported to chief warden promptly
19Assembly area safe distance from building (minimum 20 m)
Post-Drill Review
20All-clear announced and personnel returned to building
21Debrief conducted with wardens (within 24 hours)
22Corrective actions documented and assigned
23Drill results reported to management and WHS committee

Drill Outcome Summary

Overall evacuation time: _______ minutes _______ seconds. Target met: Yes / No. Number of corrective actions raised: _______. Next drill scheduled: _______________.

Chief Warden
Name
Signature
Date
WHS Manager / Observer
Name
Signature
Date