Electrical Installation Safety Checklist

Inspection of fixed electrical installations per AS/NZS 3000 Wiring Rules

Company Logo
FORM-EINST-001
Installation Details

Inspect each item. Mark as Compliant (P), Non-Compliant (F), or N/A. Non-compliant items require corrective action.

# Inspection Item P F N/A Notes
Supply & Distribution
1Main switchboard accessible and clear of obstructions
2Switchboard labelling accurate and legible
3Main switch operational and clearly marked
4Switchboard enclosure secure (no missing covers or knockouts)
5No signs of overheating, discolouration or burning
Earthing & Bonding
6Main earthing conductor intact and connections tight
7Earth electrode accessible and in good condition
8Equipotential bonding in place (water, gas, structural steel)
9Earth continuity confirmed on exposed conductive parts
Circuit Protection
10Circuit breakers correctly rated for cable size
11RCDs installed on all socket outlet circuits (max 30 mA)
12RCD test button functional on all devices
13Surge protection installed where required
14No unauthorised modifications to protection devices
Wiring & Cables
15Cable insulation in good condition (no cracking, perishing)
16Cables adequately supported and protected from damage
17No extension leads used as permanent wiring
18Cable penetrations through walls/floors properly sealed
19Junction boxes accessible with covers intact
Compliance
20Electrical installation certificate of compliance on file
21Periodic inspection within required timeframe
22Defect notices from previous inspections addressed
23Emergency procedures signage displayed near switchboards

Declaration

I have inspected the electrical installation at the above premises and confirm the results as recorded. Any non-compliant items must be rectified by a licensed electrician before the installation is considered safe for continued use.

Licensed Electrical Inspector
Name / Licence No.
Signature
Date
Site Manager / Owner
Name
Signature
Date