To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

Dust Collector Inspection Checklist

Monthly inspection record for baghouse, cartridge and cyclone dust collection systems

Company logo

PAGE 1 OF 2

System & Inspector Details
Differential Pressure Reading

Inspection Items

Mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Filters
1Filter bags or cartridges: no visible tears, holes or damage (visual from access door)
2Filter media: no moisture staining, chemical discolouration or blinding
3Filter cages (baghouse): not bent, corroded or dislodged from tube sheet
4Tube sheet or mounting plate: seals intact, no dust bypass around filter seats
Pulse-Jet Cleaning System
5Pulse valves: all firing consistently during manual cleaning cycle
6Compressed air pressure at manifold: within specification (typically 400-600 kPa)
7Compressed air quality: no oil or moisture at drain point
8Timer or controller: settings correct, sequence cycling as programmed
9Air manifold and piping: no leaks, connections secure
Housing & Hopper
10Collector housing: no corrosion, dents, weld cracks or structural damage
11Access doors: seals and gaskets intact, doors close securely
12Hopper: no material bridging or blockage, walls clear
13Discharge mechanism (airlock / screw / dump valve): rotating freely, seals intact
14Airlock drive: chain or belt tension correct, motor running smoothly
Ductwork & Hoods
15Capture hoods: correctly positioned, no damage, adequate capture velocity
16Duct joints and flexible connections: no leaks, tears or disconnections
17Dampers: set to correct positions, operating freely
18Duct condition: no dents, holes, excessive wear or dust accumulation inside
Dust Collector Inspection - Page 2 of 2
Asset ID
Date
Inspector
# Check P F N/A Notes / Action
Fan & Motor
19Fan vibration: reading within acceptable limits, no abnormal noise
20Fan bearings: temperature acceptable, no excessive heat or noise
21Fan wheel: no build-up, erosion, cracks or imbalance
22Drive belts (if belt-driven): correct tension, no fraying, cracking or glazing
23Motor current draw: within nameplate rating, no overload
24Fan inlet and outlet: no obstructions, inspection doors secure
Explosion Protection
25Explosion vent panels: intact, unobstructed, rupture indicator not tripped
26Isolation valves (flap or chemical): in service, within test date
27Suppression system (if fitted): armed, canisters within service date
28Grounding and bonding: earth connections intact on collector, ductwork and hoods
29Spark arrestor (if fitted): condition acceptable, no blockage
Monitoring Instruments
30Magnehelic or digital DP gauge: calibrated, reading correctly
31Broken bag detector (triboelectric or opacity): functional, alarm set-point verified
32Stack emissions monitor (if required): operational, within calibration date
Housekeeping & General
33No accumulated dust on collector exterior, surrounding floors, beams or ledges
34Dust disposal: collection bin or bag not overfull, disposed of correctly
35Warning signs and labels: legible, in place (hazard, explosion risk, PPE)
Overall Result
PASS: all items satisfactory, system fit for continued operation FAIL: defect(s) identified, see table below

Defects & Action Required (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this dust collector inspection in accordance with site procedures and relevant Australian Standards. I have recorded all findings accurately and reported any defects or non-compliant items to my supervisor. The dust collection system will not be returned to service until any faults that affect worker health, safety or environmental compliance have been rectified. I understand that failure to complete scheduled inspections or report defects may breach company policy and WHS obligations.

Inspector Sign-off
Signature
Print name
Date & time
Supervisor / Maintenance Manager Acknowledgement
Signature
Print name
Date