Crane 500-Hour Service Procedure

Intermediate service - mobile crane, all-terrain and truck-mounted (all makes)

Your logo here
PAGE 1 OF 2
500-HOUR (INTERMEDIATE) SERVICE

Estimated duration: 4 - 6 hours • Frequency: every 500 engine hours

Carry-forward: This service includes all 250-hour tasks. Complete the 250-hour service procedure first, then perform these additional items. See maptrack.com/templates/crane-250-hour-service

Equipment Details

# Service Action Type Done Notes
Engine (additional to 250-hour)
1Replace fuel filter elementREPLACE
2Replace air filter elementREPLACE
Hydraulic System (additional to 250-hour)
3Replace hydraulic return filterREPLACE
4Take hydraulic oil sample for analysisSAMPLE
Wire Ropes and Rigging (additional to 250-hour)
5Measure wire rope diameter at 3 points and recordMEASURE
6Count and record broken wires per lay lengthMEASURE
7Inspect sheave grooves for wear (measure)MEASURE
Brakes and Winch (additional to 250-hour)
8Inspect hoist, slew and travel brakes - lining thickness and adjustmentINSPECT
9Inspect winch drum - rope winding and flangesINSPECT
Safety Systems (additional to 250-hour)
10Check LMI/RCI calibration - compare to load chartCHECK
Slew System (additional to 250-hour)
11Torque slew ring mounting boltsTORQUE
Carrier (additional to 250-hour)
12Inspect carrier - tyres, brakes, steering and suspensionINSPECT
Outriggers (additional to 250-hour)
13Check outrigger cylinder seals for leaksCHECK
Structural (additional to 250-hour)
14Inspect counterweight mountingINSPECT
15Check all safety decals are legibleCHECK

Fluid Specifications (General Guide)

SystemType / GradeApprox. Capacity
Engine oil15W-40 CI-4 / CK-415 - 30 L
Hydraulic oilISO VG 46 (AW 46)150 - 300 L (system)
Coolant50/50 ethylene glycol25 - 40 L
Slew ring gear greaseEP0 or EP1As required
Wire rope lubricantWire rope dressingAs required
GreaseEP2 lithium complexAs required

Specifications are general guidelines for typical mobile cranes (all-terrain and truck-mounted). Always refer to the manufacturer's service manual for your specific make and model. Capacities vary by crane class.

Parts / Consumables Required (500-hour additional items)

#Part / ConsumablePart NumberQtyReady
1Engine oil (15W-40)15-30 L
2Engine oil filter1
3Fuel filter element1
4Air filter element1
5Hydraulic return filter1
6Fuel/water separator element1
7EP2 grease cartridges4-6
8Wire rope lubricantAs req.
9Oil sample bottle (hydraulic)1
10Wire rope measurement log1
11Coolant (pre-mixed or concentrate)As req.
12Rags, drip tray, waste oil container-

Notes / Defects Identified

Next Service Due

Technician

Supervisor / Workshop Manager