Contractor Management Checklist

WHS Act 2011 / WHS Regulations 2011 contractor management and oversight.

Company logo

PAGE 1 OF 2

Contractor & Project Details

Contractor Management Items

Mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Pre-Qualification
1Contractor pre-qualification questionnaire completed and reviewed
2WHS management system or safety plan reviewed and accepted
3Previous safety performance and incident history assessed
Insurance Verification
4Public liability insurance current and adequate (min $20M)
5Workers compensation insurance current for all workers
6Professional indemnity insurance current (where applicable)
Licence & Competency Checks
7Relevant trade licences verified (electrical, plumbing, building)
8High risk work licences sighted for all relevant personnel
9White/blue cards (construction induction) verified for all workers
Induction Requirements
10Site-specific induction completed and signed off
11Emergency procedures, muster points and first aid explained
12Hazard and incident reporting procedures communicated
Contractor Management Checklist - Page 2 of 2
Contractor
Date
Assessor
# Check P F N/A Notes / Action
SWMS Review
13SWMS provided for all high risk construction work (WHS Reg 291)
14SWMS reviewed and accepted by principal contractor / PCBU
15All workers signed on to relevant SWMS before commencing work
Supervision Arrangements
16Competent supervisor nominated and present on site
17Communication and coordination arrangements established
18Subcontractor management plan in place (if subcontractors used)
Performance Monitoring
19Regular safety inspections and audits scheduled and documented
20Non-conformances and corrective actions tracked to closure
Incident Reporting
21Incident and near-miss reporting process agreed and understood
22Notifiable incident reporting obligations to the regulator understood

Declaration

I confirm that the above contractor management checks have been completed in accordance with the Work Health and Safety Act 2011 and WHS Regulations 2011. Where items are marked as Fail, corrective actions must be completed before the contractor commences work. This checklist forms part of the PCBU's due diligence obligations under Section 27 of the WHS Act.

Assessor Sign-off (PCBU Representative)
Signature
Print name
Date
Contractor Acknowledgement
Signature
Print name
Date