Concrete Pump Daily Pre-Start Checklist

Concrete pump daily inspection: complete before first use each shift

Company logo

PAGE 1 OF 2

Concrete Pump & Operator Details

Inspection Items

Circle or mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Cab & Vehicle
1Cabin access, seating and seatbelt
2Horn: audible
3Brakes: parking brake and foot brake operational
4Air conditioning: operational
5Gauges and warning lights: functioning correctly
Tyres & Wheels
6Tyre condition and pressure: adequate
7Wheel nuts and indicators: secure
8Mud flaps and guards: intact
9Spare tyre: present and serviceable (if fitted)
Engine & Fluids
10Engine oil: correct level
11Coolant: correct level, no leaks
12Hydraulic oil: correct level
13Fuel: sufficient for shift
14Window wash fluid: adequate
Visibility & Electrical
15Windscreen and wipers: clean, operational
16Mirrors: clean, correctly adjusted
17Headlights and tail lights: operational
18Beacon and reverse alarm: operational
19Indicators: operational
Concrete Pump Pre-Start Checklist - Page 2 of 2
Asset ID
Date
Operator
# Check P F N/A Notes / Action
Boom & Pipework
20Boom sections: condition acceptable, no cracks or damage
21Boom fold/unfold operation: smooth, no binding
22Delivery pipes and couplings: secure, no wear or cracks
23Rubber hoses and clamps: condition acceptable, secure
24Boom rest / cradle: secure, no damage
25Remote control unit: operational, batteries charged
26Pipework clamps: secure, no loose fittings
Outriggers
27Outrigger legs: extend and retract smoothly
28Pads / feet: condition acceptable, no damage
29Pins and locks: secure, in place
30Ground conditions: adequate for outrigger setup
Hopper & Concrete System
31Hopper grate: secure, interlocks functional
32Agitator: operational
33Water pump / wash-out system: operational
34Concrete valve / S-valve: condition acceptable
Safety Devices
35Fire extinguisher: present, in date, accessible
36First aid kit: present and stocked
37Emergency stops: tested, accessible
38LOTO points: identified, accessible
39Guards and covers: in place, secure
Overall Result
PASS: all items satisfactory, concrete pump fit for use FAIL: defect(s) identified, see table below

Defects & Action Required  (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this concrete pump pre-start inspection before using this concrete pump. I have reported any defects or non-compliant items to my supervisor and will not use this concrete pump until any defects that affect safety have been rectified. I understand that failure to complete a pre-start check or to report defects may breach company policy and WHS obligations.

Operator Sign-off
Signature
Print name
Date & time
Supervisor / Reviewer Acknowledgement
Signature
Print name
Date