# Check P F N/A Notes / Action
Compressor Units
1Compressor operating within rated pressure and temperature limits
2Oil levels checked and within specification
3Air / gas filters inspected, cleaned or replaced as required
4Abnormal noise, vibration or leaks investigated and recorded
Cooling Systems
5Intercooler and aftercooler fins clean, free from fouling or damage
6Coolant levels checked, no leaks in cooling circuit
7Cooling fans and motors operating correctly
Piping & Valves
8Suction and discharge piping inspected for corrosion, leaks or vibration damage
9Isolation valves, check valves and drain valves operational
10Pipe supports and hangers secure, no excessive movement
Instrumentation
11Pressure gauges, temperature gauges and transmitters calibrated and reading correctly
12Flow meters and level indicators functional
13SCADA / PLC communication verified, alarms tested
Compressor Station Inspection - Page 2 of 2
Station
Date
Inspector
# Check P F N/A Notes / Action
Electrical
14MCC and switchgear enclosures secure, ventilation adequate
15Motor insulation resistance tested and within limits
16Cable trays, conduits and junction boxes in good condition
Safety Systems (ESD & Gas Detection)
17Emergency shutdown (ESD) system tested and functional
18Gas detectors calibrated, alarm and trip setpoints verified
19Fire detection and suppression systems inspected and serviceable
20Pressure relief valves within test date and set pressures confirmed
Foundations & Vibration
21Compressor skid and foundation bolts secure, no cracking
22Vibration readings taken and within acceptable limits
Environmental Controls
23Oil / condensate drains and separators functioning, no spills observed
24Noise attenuation measures in place, boundary noise levels compliant
Overall Result
PASS: all items satisfactory, station fit for continued operation FAIL: deficiency identified, see table below

Deficiencies & Corrective Actions  (list any item marked F: reference item # from checklist)

Item # Deficiency description Corrective action / reported to Rectified by / date

Declaration

I declare that I have completed this compressor station inspection in accordance with site operating procedures, applicable Australian Standards and OEM maintenance requirements. All deficiencies identified have been recorded and reported to the responsible person. Safety-critical defects must be rectified before continued operation of the station.

Inspector Sign-off
Signature
Print name
Date & time
Operations / Plant Manager Acknowledgment
Signature
Print name