To save as PDF: use your browser's PrintSave as PDF or Print to PDF. This checklist prints as 2 pages (A4).

Cherry Picker Pre-Start Checklist

EWP / cherry picker daily pre-start inspection: complete before first use each shift

Company logo

PAGE 1 OF 2

EWP & Operator Details

Inspection Items

Mark the applicable column: P = Pass | F = Fail | N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Boom and Knuckle
1Boom sections free from cracks, dents and structural damage
2Boom extends, retracts and articulates smoothly
3Knuckle/jib boom pins and retainers secure
4Turntable rotation smooth, no abnormal noise
Basket / Platform
5Platform floor free from damage, debris and slipping hazards
6Guardrails, mid-rails and toe boards secure and undamaged
7Entry gate/chain closes securely and latches
8Harness anchor point secure and rated
Hydraulic System
9Hydraulic fluid level within operating range
10No visible hydraulic leaks at hoses, fittings or cylinders
11Hydraulic hoses free from abrasion, bulging and chafing
Outriggers / Stabilisers
12Outrigger legs extend and retract smoothly
13Outrigger pads present and in good condition
14Outrigger interlocks functional (prevent operation if not deployed)
Cherry Picker Pre-Start - Page 2 of 2
Asset ID
Date
Operator
# Check P F N/A Notes / Action
Controls (Ground and Platform)
15Ground controls operational and clearly labelled
16Platform controls operational and clearly labelled
17Ground override controls functional (supervisor access)
18All gauges, displays and warning lights functioning
Safety Devices
19Horn / audible alarm operational
20Tilt alarm / level sensor functional
21Limit switches prevent operation beyond rated capacity
22Emergency stop buttons accessible at ground and platform
Emergency Descent
23Emergency descent (manual lowering) system tested and functional
24Emergency descent instructions legible and displayed on machine
25Rescue plan documented and all operators briefed
Overall Result
PASS: all items satisfactory, EWP fit for use FAIL: defect(s) identified, see table below

Defects & Action Required  (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this cherry picker / EWP pre-start inspection before using this machine. I have reported any defects or non-compliant items to my supervisor and will not use this EWP until any defects that affect safety have been rectified.

Operator Sign-off
Signature
Print name
Date & time
Supervisor / Reviewer Acknowledgement
Signature
Print name
Date