Regulation 4 - Pre-construction information pack for the principal designer and principal contractor.
PAGE 1 OF 2
Pre-Construction Information Schedule
Complete each row with relevant project details. Attach supporting documents where indicated.
| # | Description | Details / Notes |
|---|---|---|
| Project Description | ||
| 1 | Brief description of the project and scope of works | |
| 2 | Programme and key project milestones | |
| 3 | Details of any phasing or sequencing requirements | |
| Existing Drawings & Surveys | ||
| 4 | Existing site layout drawings available | |
| 5 | Structural and geotechnical survey reports | |
| 6 | Topographical, utilities and services surveys | |
| Health & Safety File for Existing Structure | ||
| 7 | H&S file from previous construction work available | |
| 8 | Details of residual hazards from prior works | |
| Existing Hazards | ||
| 9 | Asbestos management survey / refurbishment and demolition survey | |
| 10 | Land contamination, ground conditions or groundwater issues | |
| 11 | Existing services (gas, electricity, water, telecoms, drainage) | |
| 12 | Other hazardous materials (lead paint, PCBs, biological agents) | |
| # | Description | Details / Notes |
|---|---|---|
| Design & Construction Hazards | ||
| 13 | Significant design assumptions and suggested work methods | |
| 14 | Arrangements for co-ordination of ongoing design work | |
| 15 | Known risks that could not be designed out | |
| 16 | Temporary works requirements and constraints | |
| 17 | Site access constraints, neighbouring properties, public interfaces | |
| Environmental Considerations | ||
| 18 | Ecological surveys (protected species, habitats, trees) | |
| 19 | Noise, vibration or dust restrictions and sensitive receptors | |
| 20 | Waste management requirements and disposal restrictions | |
Declaration
I confirm that this pre-construction information has been prepared in accordance with Regulation 4 of the Construction (Design and Management) Regulations 2015. The information provided is, to the best of my knowledge, accurate and sufficient to enable the principal contractor and designers to plan and manage the construction phase safely. This document shall be reviewed and updated as the project progresses.