CDM 2015 Pre-Construction Information

Regulation 4 - Pre-construction information pack for the principal designer and principal contractor.

Company logo

PAGE 1 OF 2

Project & Client Details

Pre-Construction Information Schedule

Complete each row with relevant project details. Attach supporting documents where indicated.

# Description Details / Notes
Project Description
1Brief description of the project and scope of works
2Programme and key project milestones
3Details of any phasing or sequencing requirements
Existing Drawings & Surveys
4Existing site layout drawings available
5Structural and geotechnical survey reports
6Topographical, utilities and services surveys
Health & Safety File for Existing Structure
7H&S file from previous construction work available
8Details of residual hazards from prior works
Existing Hazards
9Asbestos management survey / refurbishment and demolition survey
10Land contamination, ground conditions or groundwater issues
11Existing services (gas, electricity, water, telecoms, drainage)
12Other hazardous materials (lead paint, PCBs, biological agents)
CDM 2015 Pre-Construction Information - Page 2 of 2
Project
Date
Prepared by
# Description Details / Notes
Design & Construction Hazards
13Significant design assumptions and suggested work methods
14Arrangements for co-ordination of ongoing design work
15Known risks that could not be designed out
16Temporary works requirements and constraints
17Site access constraints, neighbouring properties, public interfaces
Environmental Considerations
18Ecological surveys (protected species, habitats, trees)
19Noise, vibration or dust restrictions and sensitive receptors
20Waste management requirements and disposal restrictions

Declaration

I confirm that this pre-construction information has been prepared in accordance with Regulation 4 of the Construction (Design and Management) Regulations 2015. The information provided is, to the best of my knowledge, accurate and sufficient to enable the principal contractor and designers to plan and manage the construction phase safely. This document shall be reviewed and updated as the project progresses.