CDM 2015 Health & Safety File

Regulation 12 - Health and safety file for the completed structure.

Company logo

PAGE 1 OF 2

Project Details

Health & Safety File Contents

Complete each row with relevant information for the finished structure. Attach referenced documents to this file.

# Category Details
Description of Work Carried Out
1Brief description of the construction work completed
2Nature and extent of any demolition work undertaken
Residual Hazards & Risks
3Residual hazards and how they have been dealt with (e.g. buried services, fragile materials)
4Hazards associated with future maintenance, repair or renovation
Key Structural Principles
5Key structural design principles and safe working loads
6Pre-stressed or post-tensioned elements and locations
7Retaining wall and basement waterproofing details
Hazardous Materials
8Location and type of hazardous materials used or left in situ
9Asbestos register or confirmation of asbestos-free status
CDM 2015 Health & Safety File - Page 2 of 2
Project
Date
Compiled by
# Category Details
Cleaning & Maintenance Information
10Safe methods for cleaning windows, facades and at-height surfaces
11Maintenance access provisions (anchor points, cradles, walkways)
12Planned preventive maintenance schedules and frequencies
As-Built Drawings Register
13As-built architectural drawings (reference numbers and locations)
14As-built structural drawings (reference numbers and locations)
15As-built M&E services drawings (reference numbers and locations)
Services Information
16Locations and details of buried services and utilities
17Fire safety systems installed (alarms, sprinklers, compartmentation)
18Specialist equipment manuals and operating instructions

Declaration

I confirm that this health and safety file has been prepared in accordance with Regulation 12 of the Construction (Design and Management) Regulations 2015. The information is accurate to the best of my knowledge and provides sufficient detail for future construction work, maintenance and cleaning to be carried out safely. This file must be kept by the client and made available to anyone who needs it for future work on the structure.

Compiled By (Principal Designer)
Signature
Print name
Date
Received By (Client)
Signature
Print name
Date