CDM Construction Phase Plan

CDM 2015 Regulation 12 - Principal contractor construction phase health and safety plan.

Company logo

PAGE 1 OF 2

Project Details

Construction Phase Plan Sections

Complete each section below. Attach supporting documents (risk assessments, method statements, drawings) as appendices where referenced.

# Section Requirement Detail / Response Responsible Person
Project Description & Management
1Project descriptionBrief description of the construction work
2Management structureOrganisation chart: site manager, supervisors, H&S adviser
3Duty holder contactsClient, principal designer, principal contractor, key contractors
4Pre-construction infoSummary of key hazards from client / principal designer
Arrangements for Managing Significant Risks
5Working at heightScaffolding, edge protection, permits, rescue plan
6ExcavationsGround conditions, support, barriers, permits
7Confined spacesPermits, atmospheric testing, rescue arrangements
8DemolitionMethod statement, sequence, structural stability
9Temporary worksDesign, checking, installation and removal procedures
10Lifting operationsLift plans, crane positions, exclusion zones (LOLER)
11Hot worksPermits, fire watch, extinguisher provisions
12AsbestosSurvey findings, licensed removal, plan of work
13Electrical safetyIsolation procedures, overhead line proximity
14Traffic managementPedestrian / vehicle segregation, signage, routes
CDM Construction Phase Plan - Page 2 of 2
Project
Date
# Section Requirement Detail / Response Responsible Person
Site Rules & Welfare
15Site rulesMandatory PPE, access hours, prohibited activities
16Welfare facilitiesToilets, washing, changing, rest area, drinking water (Sched. 2)
17First aidFirst aiders, first aid room or box, defibrillator
Emergency Procedures
18Fire and evacuationAlarm type, evacuation routes, assembly point
19Emergency contactsSite emergency, 999, nearest A&E, HSE reporting
20RIDDOR reportingProcedure for reporting accidents and dangerous occurrences
Communication, Induction & Training
21Site inductionContent, frequency, who delivers, records kept
22Toolbox talksTopics, frequency, attendance records
23ConsultationHow workers are consulted on H&S matters
Monitoring & Review
24Plan review scheduleReview frequency, triggers for update, reviewer
25Site inspectionsFrequency, scope, who conducts, records
26Health and safety fileInformation to be provided for the H&S file
Appendices (attach separately)
A. Site layout drawing  ·  B. Organisation chart  ·  C. Emergency plan and evacuation routes  ·  D. Risk assessments and method statements  ·  E. Pre-construction information summary  ·  F. Contractor details register
Principal Contractor Sign-off
Signature
Print name
Position
Date
Client Acknowledgement
Signature
Print name
Date