BOP (Blowout Preventer) Inspection Checklist

API 53 aligned: visual inspection, function test and pressure test record

Company logo

PAGE 1 OF 2

Rig & BOP Details

Visual Inspection & Function Tests

Mark the applicable column for each item: P = Pass  |  F = Fail  |  N/A = Not applicable. Record notes for any F.

# Check P F N/A Notes / Action
Ram BOP - Visual Inspection
1Ram bodies: no corrosion, erosion, cracks or mechanical damage
2Bonnets and bonnet bolts: secure, torqued to specification, no visible damage
3Ring gaskets: seated correctly, no extrusion, cracking or damage
4Ram type matches drill string: pipe ram size correct for current drill pipe OD
5Blind / shear rams: rated to cut heaviest tubular in the hole
6Ram packers: condition acceptable, no excessive wear or damage
Annular Preventer
7Packing element: condition acceptable, wear within limits
8Closing pressure: within manufacturer specification
9Opening pressure: within manufacturer specification
10Body and housing: no cracks, corrosion or hydraulic leaks
Hydraulic Control System
11Hydraulic fluid level: correct in reservoir
12Control pods: functioning, no leaks or damage
13Pilot valves and shuttle valves: operating correctly
14Hydraulic hoses and fittings: no chafing, bulging, leaks or damage
15Primary control station: all functions operational
16Secondary (remote) control station: all functions operational
Function Test Results (record times in seconds)
17Ram BOP 1 close time (API 53 max: 30 sec)
18Ram BOP 2 close time (API 53 max: 30 sec)
19Annular preventer close time (per manufacturer spec)
20Choke and kill valves: full stroke confirmed
21Hydraulic connector: lock and unlock functions confirmed
BOP Inspection - Page 2 of 2
Rig
Date
Inspector
# Check P F N/A Notes / Action
Accumulator System
22Pre-charge pressure: each bottle within specification
23Total usable volume: sufficient to close all BOPs plus reserve per API 53
24Pump output rate: meets minimum specification
25Auto pump cut-in / cut-out: triggers at correct pressures
26Accumulator bottles: no visible damage, corrosion or leaks
Choke & Kill Manifold
27Manifold valves: operate freely, no leaks
28Choke: adjustable choke functions correctly, no wash-out
29Pressure gauges: accurate, readable, not damaged
30Line connections: secure, no leaks or damage at all fittings
Pressure Testing (record psi & hold time)
31Ram BOP 1 - low-pressure test (200-300 psi, 5 min hold)
32Ram BOP 1 - high-pressure test (rated WP, 5-10 min hold)
33Ram BOP 2 - low-pressure test (200-300 psi, 5 min hold)
34Ram BOP 2 - high-pressure test (rated WP, 5-10 min hold)
35Annular - low-pressure test (200-300 psi, 5 min hold)
36Annular - high-pressure test (rated WP, 5-10 min hold)
Emergency & Backup Systems
37Deadman system: activates BOP closing on comms loss
38Autoshear system (subsea): functions correctly
39Acoustic backup control: communicates with BOP stack
40Emergency disconnect sequence: verified (subsea)
Overall Result
PASS: all items satisfactory, BOP fit for service FAIL: defect(s) identified, see table below

Defects & Corrective Actions (list any item marked F: reference item # from checklist)

Item # Defect description Action taken / reported to Rectified by / date

Declaration

I declare that I have completed this BOP inspection and testing in accordance with API Standard 53 and applicable regulatory requirements. I have recorded all findings accurately and reported any defects or non-compliant items to the toolpusher / OIM. The BOP will not be returned to service until any faults affecting well control capability have been rectified and re-tested. I understand that failure to complete an inspection or report defects may breach company well control policy and regulatory obligations.

BOP Technician / Inspector Sign-off
Signature
Print name
Date & time
Toolpusher / OIM Acknowledgement
Signature
Print name
Date