Boiler Annual Service Procedure

Annual service - steam and hot water boilers (gas and oil fired)

Your logo here
PAGE 1 OF 2
ANNUAL SERVICE

Estimated duration: 6 - 10 hours (plus cool-down time) • Frequency: every 12 months

Carry-forward: Includes all monthly service tasks. Boiler must be shut down and cooled for internal inspection. Complete the monthly service procedure first, then perform these additional items. See maptrack.com/templates/boiler-monthly-service

Equipment Details

# Service Action (Annual Additional Items) Type Done Notes
Internal Inspection
1Full internal inspection (open manhole / handhole, inspect tubes, shell, fireside, waterside for scale, corrosion, pitting)INSPECT
2Inspect refractory and insulation (cracks, spalling, hot spots)INSPECT
Pressure Testing
3Hydrostatic pressure test (1.5x working pressure per AS 3788)TEST
Burner Service
4Burner service (clean / replace nozzles, adjust air / fuel ratio, combustion efficiency test with flue gas analyser)CLEAN
5Efficiency test (combustion analysis - O2, CO, CO2, stack temperature)TEST
Gaskets and Seals
6Replace all gaskets (manhole, handhole, inspection covers)REPLACE
Electrical and Controls
7Full electrical test (safety controls, limit controls, flame safeguard, ignition sequence)TEST
8Calibrate all safety controls and operating controlsCALIBRATE
Ancillary Systems
9Inspect economiser (if fitted)INSPECT
10Inspect condensate return systemINSPECT
Compliance
11Compliance inspection per AS 3788 (Boilers and Pressure Vessels)INSPECT
12Update boiler log book and compliance certificateRECORD

Fluid Specifications (General Guide)

SystemType / GradeNotes
Water treatment chemicalsOxygen scavenger, pH control, anti-scalePer water treatment provider
Fuel (gas)Natural gas or LPG as applicableCheck supply pressure
Fuel (oil)Diesel or light fuel oil as applicableCheck supply pressure

Specifications are general guidelines. Always refer to the boiler manufacturer's service manual for your specific make and model. All pressure testing must comply with AS 3788.

Parts / Consumables Required (Annual Additional)

#Part / ConsumablePart NumberQtyReady
1Manhole / handhole gaskets1 set
2Burner nozzlesAs req.
3Refractory cement (if patching)As req.
4Flue gas analyser calibration gas1
5Water treatment chemicalsAs req.
6Boiler water test kit (reagents)1

Notes / Defects Identified

Next Service Due

Technician

Facilities Manager