To save as PDF: use your browser's Print → Save as PDF. This form prints as A4.
Comprehensive asset condition rating and remaining life evaluation
Rate each item: 1 = Very Poor, 2 = Poor, 3 = Fair, 4 = Good, 5 = Excellent. Record the rating in the Score column and note any deficiencies.
| # | Assessment Criteria | Score | Observations / Deficiencies |
|---|---|---|---|
| Physical Condition | |||
| 1 | Structural integrity (frame, chassis, body) | ||
| 2 | Corrosion or rust condition | ||
| 3 | Paint, coating, or surface finish | ||
| 4 | Wear on moving parts (bearings, pivots, tracks) | ||
| 5 | Tyres, tracks, or ground-engaging components | ||
| Functional Performance | |||
| 6 | Engine/motor performance and power output | ||
| 7 | Hydraulic system (leaks, response, pressure) | ||
| 8 | Electrical systems and controls | ||
| 9 | Transmission and drivetrain operation | ||
| 10 | Braking system effectiveness | ||
| 11 | Steering and manoeuvrability | ||
| 12 | Cooling system condition | ||
| Safety Status | |||
| 13 | ROPS/FOPS integrity (if applicable) | ||
| 14 | Guards and safety devices in place | ||
| 15 | Emergency stop functionality | ||
| 16 | Seatbelt condition and latching | ||
| 17 | Lighting and visibility aids | ||
| 18 | Warning decals and safety signage | ||
| Remaining Life | |||
| 19 | Estimated remaining useful life (years) | ||
| 20 | Estimated remaining hours (if applicable) | ||
| 21 | Major overhaul or rebuild due within 12 months | ||
| Recommendations | |||
| 22 | Continue operation as-is | ||
| 23 | Schedule preventive maintenance / repairs | ||
| 24 | Plan for replacement within budget cycle | ||
| 25 | Remove from service immediately | ||
Overall Condition Rating
Total Score: _____ / 90 Overall Rating: _____ (1-5) Recommendation: Continue / Repair / Replace / Dispose