How to save as PDF: Use your browser's Print menu (Ctrl+P / Cmd+P), then select Save as PDF as the destination. This template is sized for A4 paper.

AS 1418 Crane Inspection Checklist

Crane inspection per AS 1418.1:2021 Section 7 - General requirements

Company
logo

PAGE 1 OF 2

Crane and Inspection Details
Status key: P = Pass  •  F = Fail  •  N/A = Not applicable  •  NI = Needs investigation
# Ref. Inspection Item P F N/A Observations / Defects
A - Structural Inspection
17.3Main structural members free from visible cracks, deformation or distortion
27.3Boom sections, jib and mast in good condition with no corrosion or paint flaking
37.3Tower sections, outriggers and supports secure, with no loose or missing bolts
47.3Welded joints free from cracks, undercut or visible defects
57.3Access ladders, walkways, platforms and guardrails secure and in good condition
B - Mechanical Components
67.4Hoisting mechanism operates smoothly with no abnormal noise or vibration
77.4Slewing gear functions correctly; bearing, ring gear and pinion in good condition
87.4Travel mechanism (long travel and cross travel) operates correctly
97.4Brakes (hoist, slew, travel) hold securely and release cleanly
107.4Gearboxes, bearings and clutches free from excessive wear, noise or oil leaks
117.4Hydraulic system: hoses, fittings, cylinders and reservoir in good condition, no leaks
C - Wire Ropes, Chains and Hooks
127.5Wire ropes free from broken wires exceeding discard criteria (AS 1418.1 / AS 3569)
137.5Wire ropes free from corrosion, kinking, bird-caging or flattening
147.5Wire rope diameter within acceptable limits (no excessive reduction)
157.5Rope reeving correct and rope ends properly terminated
167.5Chains (if fitted) free from stretch, wear, deformation or corrosion
177.5Hook throat opening within tolerance; no cracks, deformation or twist
187.5Hook safety latch operates correctly; swivel rotates freely
D - Electrical Systems
197.6Main isolator and power supply connections in good condition
207.6Contactors, relays and motor starters operating correctly
217.6Cable reeling drum or festoon system in good condition, no damaged cables
227.6Pendant controls and cabin controls functioning correctly, clearly labelled
237.6Earthing system intact, no damaged insulation on cables or wiring
E - Safety Devices
247.7Load moment indicator (LMI) / rated capacity indicator (RCI) functional and calibrated
257.7Hoist upper limit switch operates correctly and stops motion
267.7Anti-two-block device (if fitted) operates correctly
277.7Travel limit switches and slew limiters function correctly
287.7Wind speed indicator (if fitted) operational and reading accurately
297.7Emergency stop buttons at all control stations tested and functioning
F - Operator Cabin and Controls
307.8Operator cabin clean, structurally sound and provides adequate visibility
317.8Control levers, pedals and switches operate smoothly and return to neutral
327.8Load chart present, legible and matches current crane configuration
337.8Operator manual, emergency procedures and communication equipment available
347.8Fire extinguisher current and accessible within the cabin
G - Documentation and Compliance
357.9Current registration certificate sighted (where required by jurisdiction)
367.9Most recent major inspection report available and within validity period
377.9Maintenance log up to date with all scheduled services completed
387.9Load test certificate current (where applicable)
397.9Operator competency records verified (high-risk work licence sighted)
Inspection Findings Summary
Category Pass Fail N/A
A - Structural
B - Mechanical
C - Wire ropes, chains and hooks
D - Electrical
E - Safety devices
F - Operator cabin and controls
G - Documentation and compliance
Declaration and Sign-Off

I confirm that this crane inspection was conducted in accordance with AS 1418.1:2021 Section 7 requirements. The findings recorded above are based on visual examination and functional testing of the crane and its components. Any defects or non-conformances identified have been communicated to the responsible person and corrective actions have been agreed.

Inspector
Responsible Person / Site Manager