How to save as PDF: Use your browser's Print menu (Ctrl+P / Cmd+P), then select Save as PDF as the destination. This template is sized for A4 paper.

5S Workplace Audit Checklist

Lean workplace organisation audit: Sort, Set in Order, Shine, Standardise, Sustain

Company
logo

PAGE 1 OF 2

Audit Details
Scoring: 0 = Not implemented  •  1 = Partially implemented  •  2 = Mostly implemented  •  3 = Fully implemented
# Audit Criterion Score
(0-3)
Evidence / Notes
1S - Sort (Seiri): Remove unnecessary items
1Only items needed for current work are present in the area
2Red-tagged items have been removed, relocated or disposed of within the agreed timeframe
3No obsolete tools, materials, documents or personal items in the work zone
4Excess stock and raw materials have been returned to stores or disposed of
5Broken, damaged or unserviceable equipment is tagged and awaiting repair or disposal
Sort subtotal (max 15)
2S - Set in Order (Seiton): A place for everything
6Every item has a clearly marked, designated storage location
7Shadow boards, foam inserts or outlines are used for tools and equipment
8Floor markings delineate walkways, work zones, storage areas and hazard zones
9Labels and signage are consistent, legible and up to date
10Frequently used items are stored within easy reach; rarely used items are stored further away
Set in Order subtotal (max 15)
3S - Shine (Seiso): Clean and inspect
11Floors, work surfaces and equipment are visibly clean and free of debris
12Cleaning schedules are posted, assigned and being followed
13Waste bins are available, correctly labelled (general, recycling, hazardous) and not overflowing
14Sources of dirt, leaks and contamination have been identified and addressed
15Cleaning supplies and spill kits are accessible and fully stocked
Shine subtotal (max 15)
4S - Standardise (Seiketsu): Visual standards and procedures
16Visual standards (photos or diagrams of the ideal state) are displayed in the area
17Standard operating procedures for 5S tasks are documented and accessible
18Colour coding and signage are consistent with other areas in the facility
195S responsibilities are clearly assigned and displayed (e.g. responsibility chart)
20Changes to layout or process are reflected in updated visual standards
Standardise subtotal (max 15)
5S - Sustain (Shitsuke): Maintain discipline
215S audits are being conducted on the agreed schedule
22Corrective actions from the previous audit have been completed on time
23All team members (including new starters) have received 5S training
24Management regularly reviews 5S results and provides support
25Continuous improvement suggestions from the team are documented and actioned
Sustain subtotal (max 15)
Score Summary
Pillar Score Max %
1S - Sort15
2S - Set in Order15
3S - Shine15
4S - Standardise15
5S - Sustain15
Overall Total75
Corrective Actions
# Issue Description Pillar Responsible Person Target Date Completed
1
2
3
4
5
6
Declaration and Sign-Off

I confirm that this 5S audit was conducted objectively using the agreed scoring criteria. The scores and observations recorded above are an accurate reflection of the workplace condition at the time of audit. Corrective actions have been discussed with the area supervisor and target dates agreed.

Auditor
Area Supervisor